Selected Engagements

    A record of analytical work prepared for capital providers.

    Feasibility Study Consultant prepares third-party feasibility studies for lenders, sponsors, and federally guaranteed loan programs across more than 30 asset classes. Each engagement summary on this page documents the mandate received, the methodology applied, and the analytical conclusions delivered to the capital provider. Sponsor identities are anonymized.

    30+
    asset classes covered
    SBA 7(a), SBA 504, USDA B&I, USDA REAP, USDA CF, conventional
    loan program experience
    Nationwide
    market coverage

    Glamping & Outdoor Hospitality

    34-Unit Safari Tent Glamping Resort, Blanco County, Texas

    Could Hill Country leisure demand sustain a 62% trailing-twelve occupancy assumption across 34 safari tents at the proposed nightly rate.

    Texas·SBA 7(a)·2025

    Self-Storage

    92,400 SF Climate-Controlled Self-Storage, Wake County, North Carolina

    Could Raleigh MSA household growth absorb 92,400 incremental climate-controlled square feet within a 30-month lease-up window.

    North Carolina·SBA 504·2026

    Build-to-Rent

    184-Home Build-to-Rent Community, Maricopa County, Arizona

    Could Phoenix MSA single-family rental demand absorb 184 detached BTR homes against 2,340 competitive units in active lease-up.

    Arizona·Conventional·2025

    Boutique Hotel

    48-Key Boutique Hotel Conversion, Asheville MSA, North Carolina

    Could Asheville leisure and corporate demand support a stabilized RevPAR of $168 against historical trailing of $142.

    North Carolina·SBA 504·2026

    Express Car Wash

    3-Site Express Tunnel Car Wash Portfolio, Hillsborough County, Florida

    Could Tampa MSA daily traffic counts and household density support 78,000 annual memberships across three tunnel sites.

    Florida·SBA 7(a)·2025

    Senior Living

    72-Unit Assisted Living and Memory Care, Lancaster County, Pennsylvania

    Could Lancaster MSA 75+ population growth support 72 licensed beds at the proposed private-pay rate against 89% market occupancy.

    Pennsylvania·HUD 232·2024

    Senior Living

    60-Bed Memory Care Facility, Fulton County, Georgia

    Did Fulton County 75-plus household density and Alzheimer's prevalence support a 60-bed memory care lease-up to 92% within 18 months.

    Georgia·Conventional·2025

    Car Wash

    Express-Tunnel Car Wash, Douglas County, Colorado

    Did Castle Rock corridor traffic counts and registered-vehicle density support 78,000 annual paid washes by year three.

    Colorado·SBA 7(a)·2025

    Gas Station

    Truck Stop and Convenience Retail, Lincoln County, Nebraska

    Did I-80 commercial truck traffic and rural North Platte retail demand support a $14M ground-up truck stop and convenience retail facility.

    Nebraska·USDA B&I·2024

    Restaurant

    Three-Unit Quick-Service Restaurant Portfolio, Wake County, North Carolina

    Did Wake County trade-area demographics and franchisor average-unit-volume benchmarks support the proposed acquisition multiple.

    North Carolina·SBA 7(a)·2026

    Self-Storage

    425-Unit Climate-Controlled Self-Storage Facility, Hillsborough County, Florida

    Did Brandon-area household density and existing supply utilization support 425 incremental climate-controlled units to stabilization.

    Florida·SBA 504·2025

    Hotel

    72-Room Boutique Hotel Conversion, Multnomah County, Oregon

    Did Portland inner-east leisure and corporate demand support a soft-brand boutique conversion at $189 stabilized ADR.

    Oregon·SBA 7(a)·2024

    Every engagement applies the same analytical framework: primary market area definition, comparable supply set construction, demand model calibration, and capture-rate justification. Each study is prepared to the documentation standards of the relevant capital provider.

    Review the methodology framework.