    A glamping feasibility study tells a lender, developer or landowner whether one glamping resort, on one site, can sell enough unit-nights at supportable rates in each month it is open to pay its operating costs and its debt at the coverage the capital source requires. It also tests whether the site can be permitted and serviced for the tents, yurts, domes or cabins planned, because a unit that cannot be licensed, plumbed or insured earns nothing.

    Three facts frame the analysis:

    • Demand is seasonal and park-driven. Yellowstone took 88.0% of its 2025 recreation visits from May to September, and Acadia's busiest month drew 81.6 times its quietest [1].
    • Public data does not count glamping. The 2022 NAICS index has no entry for the term [2]. The closest federal signal is that 1,526 of 4,889 campgrounds (31.2%) sold room or unit accommodation in 2022, worth $281.2 million, or 6.6% of campground revenue [3].
    • The unit decides the rulebook. Utah exempts a "remote yurt" from its construction code only if it is no larger than 710 square feet and has no plumbing or electricity [4] [5]. Virginia's campground rule counts yurts and cabins as camping units [6].

    This page sets out what the study must prove, the public data behind it, and where that data runs out, including monthly visitation for 26 park units, campground and cabin rules in 16 states, lodging tax in 15 states, wildfire exposure in 16 gateway counties, and the SBA and USDA rules that decide a loan. For the site-based side of the market, see the RV park feasibility study. For a worked budget and coverage test, see the 45-pad glamping resort model study in Garfield County, Utah, and for how the consultant's work differs from the appraiser's, read the consultant's role in a glamping feasibility study.

    What is a glamping feasibility study?

    A glamping feasibility study is an independent report that concludes whether a proposed glamping resort is economically, technically and financially viable on a specific site. USDA's rule for its guaranteed lending programs defines a feasibility study as a report by an independent qualified consultant "evaluating the economic, market, technical, financial, and management feasibility" of a project [7]. That five-part test is a sound standard for any capital source.

    A glamping resort sells nights in furnished units: safari or bell tents on platforms, yurts, domes, cabins and tiny houses, often alongside tent or RV sites, food and activities. The study is not an appraisal. The appraiser estimates value; the study tests whether the business can earn the cash flow that value depends on. See what a bankable feasibility study is for the general standard.

    What does a lender need the study to prove?

    A lender needs the study to prove five things: demand reaches the site in every operating month; rates and unit mix rest on evidence, not the sponsor's targets; every unit can be permitted; utilities, access and fire protection work at planned occupancy; and cash flow covers debt service at the program's level. Federal rules decide when a study is required and which tests it must pass.

    RuleWhat it saysWhy it matters for a glamping resort
    7 CFR 5001 (USDA B&I)A feasibility study by an independent qualified consultant is required for guaranteed loans over $1,000,000 to a new business [7]The trigger is loan size, so even a modest new resort can cross it
    7 CFR 5001 (USDA B&I)Borrowers with seasonal cyclical cash flow provide a projected cash flow analysis on a quarterly basis [7]A resort that closes tents in winter must show the quarters, not just the year
    13 CFR 120.160(b) (SBA)SBA may require appraisals, a survey or a feasibility study [8]SBA lenders and SBA can ask for a study on any 7(a) or 504 file
    SOP 50 10 8.1, 504 credit analysisA "unique market concept" or a project "disproportionate to size of community" may cause SBA to request a study [9]A glamping resort in a small rural county can be both
    SOP 50 10 8.1, eligibilityCampgrounds and similar businesses are eligible if more than 50% of revenue comes from transients staying 30 days or less [9]Long-stay or monthly tent and cabin rentals count against the test
    SOP 50 10 8.1, start-upsProjections must show more than 50% of revenue from transients [9]A new resort proves the test with its projection, not history
    SOP 50 10 8.1, 7(a) projectionsProjections must reflect debt service coverage of 1.15 or more within 2 years of funding [9]Sets the minimum coverage the base case must reach

    Source: 7 CFR Part 5001 and 13 CFR Part 120 (GovInfo, 2026 editions); SBA SOP 50 10 8.1, effective October 1, 2026 [7] [8] [9].

    The SBA tests apply to the operating business. A landowner who builds units and hands the whole operation to a manager with sole discretion runs into SBA's passive business rule: a management agreement that "gives the management company sole discretion over the business operations" makes the business ineligible [9]. The study should describe who operates the resort and what the management agreement allows.

    How does the study reach its conclusion?

    The study answers five questions in a fixed order and stops when one answer is no. A strong market cannot rescue a site that cannot be served with water or permitted for its units, so the site work runs alongside the demand work. The five areas mirror the economic, market, technical, financial and management test in USDA's rule [7].

    StageQuestionEvidenceOutput
    1. MarketWill enough travelers come, and in which months?Park counts by month, lodging tax data, interviewsUnit-night demand by month
    2. CompetitionHow many comparable units exist or are coming, at what prices?Property survey, license rolls, planning agendasSupply, pipeline and fair share
    3. Site and rulesCan each unit be permitted, plumbed, reached and insured?Zoning, state rules, hazard data, utility lettersPermit path and budget lines
    4. FinancialDoes cash flow cover debt service in the weakest quarter and under stress?Budget, projection, program rulesCoverage by year and quarter
    5. ManagementWho runs the resort, and does the structure meet program rules?Operator background, management agreementFinding on capacity and eligibility

    Source: FSC method; the five areas follow the feasibility study definition in 7 CFR Part 5001 [7].

    Each stage records its assumptions so a reviewer can change one and rerun the result, and the conclusion names the conditions under which it holds.

    Where does glamping demand come from?

    Glamping demand comes from leisure travelers who want to stay near a scenic draw, such as a national or state park, a lake or a mountain town, and who want a bed, heat and often a private bath rather than a bare campsite. No federal series counts glamping guests, so the study builds demand from travel flows it can measure.

    The National Park Service publishes a detailed public record of where park visitors sleep. Its overnight stay counts separate concessioner lodging from concessioner campgrounds, tent campers, RV campers and backcountry campers.

    NPS overnight stay category201920242025Change, 2019 to 2025
    Concessioner lodging3,227,3173,207,0963,129,209-3.0%
    Concessioner campers1,264,1541,365,2431,502,65018.9%
    Tent campers3,503,3693,262,3403,119,282-11.0%
    RV campers2,466,6822,673,6362,535,1302.8%
    Backcountry campers1,948,8311,755,5181,602,877-17.8%
    Miscellaneous1,415,1201,023,3771,099,837-22.3%

    Source: National Park Service, Overnight Stays National (1979 to last calendar year); changes calculated by FSC [10].

    Across the six recreation categories, the parks recorded 12,988,985 overnight stays in 2025. Concessioner lodging was 24.1% of them, and stays with a concessioner (lodging plus camping) were 35.7% [10]. Concessioner camping grew 18.9% from 2019 while tent camping fell 11.0% [10]. That pattern is consistent with demand moving toward serviced, bookable camping, but the NPS counts cannot say how much of the shift is glamping, and a study should not claim they do.

    In most of the parks below, in-park overnight stays are small next to visitation, so lodging and campgrounds outside the boundary serve much of the overnight demand. The ratio of in-park overnight stays to recreation visits is a quick screen for that.

    ParkRecreation visits, 2025Concessioner lodging stays, 2025Tent camper stays, 2025RV camper stays, 2025In-park overnight stays per 100 visits
    Yellowstone NP4,762,988692,72553,21037,26126.0
    Grand Canyon NP4,430,653571,78685,03956,12121.7
    Shenandoah NP1,682,15238,891121,10762,79014.7
    Glacier NP3,136,557107,227115,213123,52512.5
    Joshua Tree NP2,932,6440149,79293,21311.1
    Zion NP4,984,52581,05578,00384,4505.7
    Acadia NP4,079,3180128,93152,7954.8
    Rocky Mountain NP4,171,431098,66345,9064.6
    Great Smoky Mountains NP11,527,93910,162188,422141,3543.9

    Source: National Park Service, park-specific reports Recreation Visitors By Month and Overnight Stays; per-100 ratio is all six recreation overnight categories divided by recreation visits, calculated by FSC [1] [11].

    The ratio compares two different counts, so it is a screen, not a capture rate. Still, where fewer than five overnight stays are recorded inside the boundary for every 100 visits, most overnight demand is likely met outside it. Bryce Canyon shows the same shape: 1,967,367 recreation visits in 2025 and 153,741 overnight stays inside the park [12].

    The broader outdoor economy is measured by the Bureau of Economic Analysis. Outdoor recreation accounted for 2.4% of U.S. GDP, $696.7 billion, in 2024 [13]. Real value added for climbing, hiking and tent camping rose 69.5% from 2019 to 2024, while real value added for RVing fell 7.0% and for lodging on outdoor recreation trips rose 9.9% [14]. The state shares below help a study place a county inside a state economy that does or does not lean on outdoor travel.

    StateOutdoor recreation value added, share of state GDP, 2024Outdoor recreation share of wage and salary employment, 2024
    Hawaii6.1%7.2%
    Alaska5.3%6.7%
    Montana4.9%5.9%
    Vermont4.7%5.1%
    Wyoming4.5%5.5%
    Maine4.0%4.8%
    Florida3.8%4.9%
    Idaho3.5%4.3%
    Colorado3.3%4.5%
    Utah3.3%4.1%
    Tennessee2.8%3.3%
    United States2.4%3.2%

    Source: U.S. Bureau of Economic Analysis, Outdoor Recreation Satellite Account, U.S. and States, 2024, state Table 1 [15].

    The lodging side of outdoor recreation is measured too. In 2024, accommodation and food services produced 14.0% of U.S. outdoor recreation value added and 20.9% of its employment, and far more in some northern and mountain states [15].

    StateAccommodation and food services value added in outdoor recreation, 2024 ($ thousands)Share of state outdoor recreation value addedShare of state outdoor recreation employment
    Vermont758,43034.8%37.8%
    Maine1,275,69732.4%35.0%
    New Hampshire1,175,50427.9%26.3%
    Wyoming542,55623.7%39.6%
    Montana855,91022.3%32.7%
    Tennessee3,343,49621.5%26.8%
    Colorado3,068,30816.9%23.6%
    Utah1,254,00012.9%21.2%
    United States97,727,34514.0%20.9%

    Source: U.S. Bureau of Economic Analysis, Outdoor Recreation Satellite Account, U.S. and States, 2024, state Tables 3 and 4; shares calculated by FSC [15].

    How is visitor capture estimated?

    Visitor capture is estimated by walking from a measured count to the subject's unit-nights through stated assumptions. The example starts from Bryce Canyon's May to September 2025 visits [1]; every other input is illustrative, and it is not a forecast for any site.

    StepInputResult
    Recreation visits, May to September 2025Measured count1,222,006 visits
    Travel partiesAssumption: 2.8 visits per party436,431 parties
    Parties staying overnight nearby in paid lodgingAssumption: 50%218,215 parties
    Paid lodging nightsAssumption: 1.5 nights per party327,323 nights
    Nights choosing furnished glamping unitsAssumption: 3%9,820 unit-nights
    Subject's fair shareAssumption: 45 of 195 units, 23.1%2,266 unit-nights
    Subject's available unit-nights45 units for 153 nights6,885 unit-nights
    Implied occupancy, May to SeptemberModel result32.9%

    Source: National Park Service monthly visits [1]; other inputs are illustrative assumptions; results calculated by FSC.

    Moving the glamping share from 3% to 2% or 4% moves implied occupancy to 21.9% or 43.9%. That share is the most sensitive input, and only a competitive survey and booking evidence can support it. Park figures count recreation visits, not unique people, so the visits-per-party input must match how the park counts.

    How seasonal is glamping demand?

    Glamping demand is steeply seasonal in most park markets, and the season's shape differs by place: summer parks peak in July or August, desert parks peak in spring, and Appalachian parks peak in October. The study must model each month, because the resort pays debt service in all twelve.

    ParkRecreation visits, 2019Recreation visits, 2025Peak month, 2025Lowest month, 2025Peak to low ratioMay to September shareDecember to February share
    Glacier NP3,049,8393,136,557JulyFebruary50.390.9%1.8%
    Yellowstone NP4,020,2884,762,988JulyNovember36.288.0%2.5%
    Acadia NP3,437,2864,079,318AugustFebruary81.679.8%0.9%
    Rocky Mountain NP4,670,0534,171,431JulyJanuary7.970.9%8.0%
    New River Gorge NP and Preserve1,195,7211,958,440AugustJanuary6.563.5%9.4%
    Shenandoah NP1,425,5071,682,152OctoberJanuary27.553.3%3.4%
    Zion NP4,488,2684,984,525MayJanuary3.953.3%11.0%
    Great Smoky Mountains NP12,547,74311,527,939OctoberJanuary5.650.9%12.2%
    Grand Canyon NP5,974,4114,430,653MayJanuary2.750.0%16.0%
    Joshua Tree NP2,988,5472,932,644MarchJuly2.927.9%30.8%

    Source: National Park Service, Recreation Visitors By Month (1979 to last calendar year), park-specific reports; ratios and shares calculated by FSC from monthly counts that sum to each park's annual total [1].

    Three lessons follow. A northern park market can be a five-month business: Glacier and Yellowstone took close to nine in ten visits from May to September. Zion, Great Smoky Mountains, Grand Canyon and Joshua Tree each kept 11% or more of visits in December to February. And trends differ: New River Gorge visits rose 63.8% from 2019 to 2025 while Grand Canyon visits fell 25.8% [1]. Counting methods can change too. Beginning with 2025 data, Bryce Canyon counted only unique passengers entering by shuttle, so a year-over-year change at one park needs a check against the park's own notes before it goes into a forecast [12].

    The seasonal curve sets the operating window for each unit type. An uninsulated canvas tent may open only in the warm months; an insulated dome, cabin or tiny house can sell shoulder and winter nights. USDA's rule asks seasonal borrowers for quarterly cash flow [7], and the study should show, quarter by quarter, how the units that stay open carry fixed costs and debt service through the months the tents are down.

    Sixteen more gateway parks

    The same monthly test at 16 more parks shows how much the operating year changes between gateway markets. With the ten parks above, the page covers 26 park units.

    ParkRecreation visits, 2025Change, 2019 to 2025Peak monthLowest monthMay to September shareDecember to February shareIn-park overnight stays per 100 visits
    Sleeping Bear Dunes NL1,601,7472.0%JulyNovember86.2%2.4%8.5
    Grand Teton NP3,800,64811.6%JulyJanuary83.2%4.2%16.6
    Badlands NP1,139,36117.3%JulyJanuary82.4%2.9%4.2
    Great Sand Dunes NP and Preserve432,498-18.0%JuneJanuary72.5%5.3%17.8
    Olympic NP3,584,18710.4%AugustJanuary67.5%9.0%11.9
    Indiana Dunes NP2,629,49723.2%JuneFebruary67.5%10.9%1.5
    Yosemite NP4,278,413-3.3%JulyFebruary64.0%9.5%35.7
    Bryce Canyon NP1,967,367Not comparableSeptemberJanuary62.1%7.6%7.8
    Mammoth Cave NP660,73419.8%JulyOctober61.4%12.5%12.8
    Sequoia NP1,378,33710.6%JulyFebruary61.2%11.2%18.4
    Capitol Reef NP1,388,47613.2%MayJanuary57.8%5.5%4.0
    Cuyahoga Valley NP3,025,32535.2%AugustFebruary55.4%13.1%0.1
    Canyonlands NP796,0578.5%MayJanuary54.8%5.9%11.3
    Arches NP1,511,740-8.9%MayJanuary54.2%8.9%3.2
    Hot Springs NP2,494,61170.0%JuneJanuary49.9%20.1%1.4
    Big Bend NP568,10422.5%MarchAugust23.0%28.8%31.3

    Source: National Park Service, Recreation Visitors By Month and Overnight Stays, park-specific reports; changes, shares and the per-100 ratio (six recreation overnight categories over recreation visits) calculated by FSC. Bryce Canyon's change is omitted because its 2025 shuttle counting changed [1] [11] [12].

    Big Bend runs opposite to the summer parks: 28.8% of its visits came from December to February, so a desert unit's high season is winter. Yosemite and Big Bend recorded more than 30 in-park overnight stays per 100 visits, a sign of large in-park supply, while Cuyahoga Valley, Hot Springs and Indiana Dunes recorded fewer than 2, so their overnight demand is met outside the boundary. And one year can mislead: Mammoth Cave's October count fell from 75,732 in 2024 to 12,646 in 2025, a drop of 83.3% [1]. The study reads several years before treating any month as the seasonal floor.

    Peak weekends, weather and operating days

    Park data are monthly, so the weekly shape that sets rates is measured directly: the study samples competitors' availability and prices for Friday and Saturday nights against midweek nights, and reads holiday weekends on their own. A resort that fills on weekends but runs half empty midweek needs a midweek plan (groups, retreats, packages), not an annual average. Weather sets the operating window as firmly as demand: the study counts freezing nights and wet months at the nearest long-record station and sets each unit type's season to match. Smoke, fire and road closures belong in the downside case.

    Which unit types work, and how does each change the permit path?

    The right unit type is the one the market will pay for and the jurisdiction will permit at the planned size, with the planned utilities. The state codes reviewed for this page do not use the word glamping. They sort units into tents, membrane structures, recreational vehicles, manufactured homes and buildings, and each category carries its own permit, fire, flood and sanitation rules.

    Unit typeCode category the study tests firstRules found in this researchWhat the study confirms with the jurisdiction
    Canvas safari or bell tent on a platformTent or membrane structure; platform and bath module may be structuresMetro Nashville requires an operational permit for a tent over 400 square feet and an NFPA 701 flame spread certificate [16]Whether tent permits apply to lodging tents; how platforms are permitted
    YurtMembrane-covered frame structureUtah exempts a remote yurt of 710 square feet or less with no plumbing or electricity, set back 300 feet from water and registered with the local health department [4] [5]Permit path for a yurt with power or a bath
    Geodesic domeMembrane or rigid structure; may be treated as a building once insulated and plumbedNo dome-specific state rule found; Virginia's rule covers "any other device" used by the camping trade as temporary living quarters [6]Structural review, snow and wind loads, egress and fire separation
    Cabin or tiny house on a foundationBuildingVirginia counts cabins as camping units and sets cleaning, linen and bed-spacing standards for them [17]Building code occupancy class, energy code, accessibility, plumbing
    Tiny house or park unit on wheelsRecreational vehicle if it meets the federal definitionFloodplain rules define an RV as built on a single chassis and 400 square feet or less [18]; in Zones A1-30, AH and AE it must stay fewer than 180 consecutive days or be ready for highway use, or meet elevation rules [19]Whether skirting or decks make it a structure
    Tent or RV site sold alongside unitsCampsite in a licensed campgroundMinnesota licenses areas for five or more tents or recreational camping vehicles [20]; Virginia applies its rule to three or more campsites [21]Campground license class and site density

    Source: Utah Code 15A-1-202 and 15A-1-204; Metro Nashville Fire Marshal tent permit guidance; 12VAC5-450-10 and -115; 44 CFR 59.1 and 60.3; Minn. Stat. 327.14; Code of Virginia 35.1-1 [4] [5] [16] [6] [17] [18] [19] [20] [21].

    The Utah rule shows the trade-off clearly. A yurt without power or plumbing can skip the construction code; the same yurt with electric heat or a bathroom cannot [4]. If the units will have power, the study budgets for building permits on every unit unless the jurisdiction confirms otherwise in writing.

    Unit mix also changes the operating window. The Utah model study assumes tents open 214 nights, domes 245 and cabins all year; those are modelled assumptions for one site, not market data.

    How do building and land use codes treat tents, yurts and tiny cabins?

    Codes treat a glamping unit by what it contains, not what it is called: plumbing, power, cooking, a permanent foundation and floor area move a unit from camping shelter toward building. None of the rules below uses the word glamping.

    RuleUnitLine it drawsEffect
    Utah Code 15A-1-202 and 15A-1-204Remote yurt710 square feet or less, no plumbing or electricity [4] [5]Power or a bath brings it under the construction code
    ORS 215.283(2)(c), Oregon farm zonesYurt in a private campgroundCounty approval; at most one-third of campsites or 10, whichever is smaller; no permanent foundation [22]Caps yurts on farmland
    ORS 215.213(2)(e), OregonYurt, as definedNo plumbing, sewage disposal hookup or internal cooking appliance [22]A plumbed unit is not a yurt here
    ORS 215.010(5), OregonRecreational structureMay include yurts, cabins and fabric structures, with or without plumbing, heating or cooking [22]Serviced structures follow their own path
    RSA 216-I:1, New HampshireRecreational camping cabin400 square feet or less, not a permanent dwelling [23]Larger cabins leave the campground category
    ARSD 44:02:14:13, South DakotaCamping cabinNo more than two sleeping rooms, no bathroom, egress window of at least 5.7 square feet [24]A cabin with a bath is not a camping cabin
    ARM 37.111.1201, MontanaShelter unitSupplied by the licensee; includes tents, cabins, yurts and tipis [25]Operator-owned tents are licensed like cabins
    ARM 37.111.1201(14), MontanaMobile homeIncludes park model homes and tiny houses [25]A tiny house can fall under trailer court rules
    44 CFR 59.1Recreational vehicleSingle chassis, 400 square feet or less [18]Road-ready units avoid structure rules in flood zones [19]

    Source: Utah Code; ORS chapter 215 (2025 edition); RSA 216-I:1; ARSD 44:02:14; ARM 37.111 subchapter 12; 44 CFR 59.1 and 60.3 [4] [5] [22] [23] [24] [25] [18] [19].

    The unit specification must be fixed before the permit analysis, because a late wet bath or kitchenette can move every unit into a different code. Building and fire codes are adopted state by state and often county by county, so the study names the edition in force and gets the building official's classification in writing.

    Which state rules license tents, cabins and yurts as campgrounds?

    Most states reviewed here license a glamping resort through campground or lodging rules, and the trigger is a small number of sites, starting at two campsites in South Dakota, New Hampshire and New Jersey [26] [23] [27]. Twelve more states follow, in addition to Minnesota, Virginia, Oregon and Utah above.

    StateRuleThreshold or scopeTents and cabinsSiting or sanitation line
    MontanaMCA 50-52-101; ARM 37.111Land where persons camp, secure tents or cabins [28]Operator tents, cabins, yurts and tipis are shelter units [25]Toilets within 300 feet of dependent unit sites [25]
    South DakotaSDCL 34-18-1; ARSD 44:02:14Two or more campsites [26]Camping cabin has no bathroom [24]Lodging covers cabins and resorts [26]
    New HampshireRSA 216-I:12 or more campsites [23]Campsite may hold a tent, RV or camping cabin [23]Cabin of 400 square feet or less
    Maine22 M.R.S. 24915 or more sites with tents, rental cabins and cottages [29]Lodging place: 4 or more rooms or cottages [29]Stays under 183 days
    MassachusettsG.L. c. 140, s. 32A and 32BLicense for a recreational camp, overnight camp or cabin [30]Granted after a published hearing notice [31]Local board sets conditions
    Indiana410 IAC 6-7.1Ten (10) or more tents, RVs or park models [32]Tents count toward the thresholdPlans ninety (90) days before construction
    LouisianaLAC 51:XVIPlans show every tent site [33]Tents at least 20 feet apart [33]Toilets within 200 feet of sleeping quarters [33]
    New YorkSanitary Code Subpart 7-3 [34]More than five camping sites need an annual permit (Clinton County) [35]State, city or county health permitPermit only when compliant
    Illinois77 Ill. Adm. Code 800Campsites capped by water and sewage capacity [36]Engineer design above 1500 gallons per day [36]One female toilet seat per 20 campsites [37]
    New Jersey2023 guidance after N.J.A.C. 8:22 lapsed2 or more campsites [27]Applies where a municipality adopts it [27]No more than 200 persons and 20 campsites per acre
    GeorgiaRule 511-6-2Tourist accommodations include campgrounds [38]Spaces and guestrooms counted togetherWater system rule at twenty-five spaces or guestrooms for sixty days [38]
    TexasHealth and Safety Code 341.0315Water system sizingEight RV or cabin sites equal one residential connection [39]Cabins and RV sites counted alike

    Source: state statutes, rules and health agency guidance as listed [28] [25] [26] [24] [23] [29] [30] [31] [32] [33] [34] [35] [36] [37] [27] [38] [39].

    Two lender questions follow. Even a few units usually need a state or county license, so the study names it, the agency and the renewal cycle. And the bath decision can change the category: South Dakota bars a bathroom in a camping cabin while its lodging definition covers cabins [24] [26], so a resort mixing shared-bath tents with en-suite cabins may need two licenses.

    What evidence exists for glamping rates and occupancy?

    No public dataset publishes glamping nightly rates, occupancy or unit counts. The federal statistical system folds glamping into campgrounds, recreational camps or other traveler accommodation, and it reports revenue, not rates or occupied nights. The study therefore collects its own rate and occupancy evidence and uses federal data only for scale and revenue mix.

    The 2022 Economic Census product-line tables are the closest public measure of what campgrounds sell besides sites.

    Product line, 2022IndustryRevenue ($ thousands)Share of industry revenue
    RV and tent sites for travelersRV parks and campgrounds (721211)3,437,32580.9%
    Room or unit accommodation, allRV parks and campgrounds (721211)281,2426.6%
    Room or unit accommodation, with maid serviceRV parks and campgrounds (721211)109,7022.6%
    Room or unit accommodation, without maid serviceRV parks and campgrounds (721211)165,9833.9%
    Meals and nonalcoholic beverages served on siteRV parks and campgrounds (721211)60,1711.4%
    Recreational equipment rentalRV parks and campgrounds (721211)54,2371.3%
    Overnight recreational camp accommodationRecreational and vacation camps (721214)3,290,84788.7%
    Room or unit accommodation for travelersRecreational and vacation camps (721214)46,4931.3%
    All other recreation servicesRecreational and vacation camps (721214)100,5622.7%

    Source: U.S. Census Bureau, 2022 Economic Census, products by industry (EC2200NAPCSINDPRD), U.S. totals for all establishments [3].

    Among the 1,526 campgrounds that sold room or unit accommodation, those units made up 16% of their revenue [3]. In campgrounds that offer them, cabins and similar units are a minority of revenue; a glamping resort makes them the core product. Campground or RV park occupancy is not a proxy for furnished units.

    What a study collects instead:

    • Published rates of the competitive set, taken from each operator's own booking page for weekday and weekend nights in peak, shoulder and off-season months, by unit type.
    • Availability sampling over several weeks, which shows how fast inventory sells and where discounting starts.
    • Interviews with park concessioners, gateway lodging owners and tourism offices on seasons, closures and group business.
    • Lodging tax data where the state or county publishes it by month and place.
    • The sponsor's own history, if a pilot phase or campground already operates on the site, verified against tax returns.

    The study labels its rate and occupancy inputs as assumptions, shows the evidence behind each, and stress tests them against coverage.

    How unit mix changes available nights

    Unit mix changes the denominator before it changes the rate. In the Utah model study, tents, domes and cabins open for different seasons.

    Unit type (model assumptions)UnitsOpen nights per unitAvailable unit-nightsStabilized occupancy of available nights
    Safari tents242145,13671.1%
    Domes122452,94069.3%
    Cabins93653,28557.3%
    Total45n/a11,36166.7%
    Same total, measured against 45 units for 365 nights45365n/a46.1%

    Source: FSC model study, 45-pad glamping resort in Garfield County, Utah; model assumptions and results, not market data.

    The model's 66.7% on available nights is 46.1% on a full-year basis, so every occupancy claim must state its denominator.

    What do food, activities and events add to revenue?

    They add revenue, but public data show them as a small share for campground operators, so the study treats them as support for the rooms line. In 2022, meals and nonalcoholic beverages were 1.4% of RV park and campground revenue and recreational equipment rental was 1.3%; at recreational and vacation camps, all other recreation services were 2.7% [3].

    A resort built around a lodge can do more. The Utah model study assumes food and beverage at 22% of rooms revenue and activities, retail and fees at 7%, leaving rooms at 77.5% of total revenue; those are assumptions for one site. The study supports each ancillary line with a price plan, a capture rate per occupied unit, and its permits (food service, alcohol and events).

    Events have their own limits. On Oregon farmland, a county may authorize a single agri-tourism event a year on a tract only if it lasts no more than 72 consecutive hours, draws no more than 500 people and parks no more than 250 vehicles [22]. The study models weddings and retreats only to the level the land use rules allow.

    How is the competitive supply survey done?

    The competitive supply survey is done property by property, because federal counts are too coarse to isolate glamping. Federal data sets the frame; the survey fills it in with named competitors, their unit types, unit counts, seasons and published rates.

    Federal countMeasureRV parks and campgrounds (721211)Recreational and vacation camps (721214)All other traveler accommodation, incl. housekeeping cabins (721199)
    Economic Census, 2022Establishments4,8892,840n/a
    Economic Census, 2022Receipts ($ thousands)4,251,0453,710,454n/a
    Economic Census, 2022Paid employees25,72922,428n/a
    County Business Patterns, 2023Employer establishments5,0182,9672,061
    County Business Patterns, 2023Share with fewer than 5 employees69.2%59.3%72.5%
    Economic Census, 2022Receipts per establishment ($ thousands)869.51,306.5n/a

    Source: U.S. Census Bureau, 2022 Economic Census (EC2272BASIC) and County Business Patterns 2023 (cbp23us); receipts per establishment and shares calculated by FSC [40] [41].

    The 2022 NAICS definitions explain the split. Campgrounds (721211) operate sites "including tents, tent trailers, travel trailers, and RVs" [42]. Recreational and vacation camps (721214) provide "cabins and fixed campsites" with food and organized activities, and the index places outdoor adventure retreats there [2]. Housekeeping cabins and cottages sit in 721199 [2]. A glamping resort can land in any of the three, so a county count in one code will miss competitors filed in another. Nonemployer operators matter too: in 2024 there were 9,655 nonemployer establishments in 72121, with receipts of $68.3 thousand each on average [43]. Operators with no payroll do not appear in employer counts.

    The state pattern of the combined industry helps size a regional market.

    StateEstablishments, 2022Receipts, 2022 ($ thousands)Share of U.S. receipts
    California560728,8869.2%
    Texas644583,1207.3%
    Florida353482,2466.1%
    Pennsylvania367456,9135.7%
    New York377447,3345.6%
    Michigan321330,7324.2%
    North Carolina227310,9233.9%
    Maine250294,0233.7%
    Arizona203270,3163.4%
    South Carolina72191,7662.4%

    Source: U.S. Census Bureau, 2022 Economic Census, NAICS 72121 (RV parks and recreational camps), states with published receipts; shares of the U.S. total of $7,961,499 thousand calculated by FSC [40].

    The survey method:

    1. Define the market area by drive time from the site and from the demand generators (park entrances, lakes, trailheads), not by county lines.
    2. Build the list from state campground and tourist facility license rolls where they are public, county planning and permit agendas, lodging tax registrations, and operators' own websites. Minnesota, Oregon and Virginia all license campgrounds through health agencies [44] [45] [46]; Oregon's license covers any "tourist facility", which includes travelers' accommodations and recreation parks [45].
    3. Record each competitor's unit types, unit count, bath arrangement, season, amenities, and published rates by season and day of week.
    4. Add the pipeline: approved or pending projects from county planning agendas, conditional use permits and building permit records.
    5. Separate direct competitors (furnished units at similar prices) from indirect ones (campgrounds, cabins, motels and short-term rentals).
    6. Estimate supply growth and its timing, then test the subject's fair share against it.

    What site and technical issues decide feasibility?

    Zoning, water and wastewater, fire protection, access and flood exposure decide whether a site can host the planned resort, and any one of them can stop a project the market supports. The study confirms each with the authority that controls it before the projection is final.

    Zoning and conditional use

    A county may treat a glamping resort as a campground, resort or commercial recreation use and allow it only by conditional use permit or zone change. A 2020 Garfield County, Utah planning agenda, for example, carried a conditional use permit for a short-term rental, RV park and glamping use alongside zone changes to a resort recreation district [47]. The study reads the ordinance, the hearing record and the conditions of approval (unit caps, density, setbacks, quiet hours, lighting, seasonal limits), because each one changes revenue or cost. Where the county has no glamping definition, the study records which category staff apply.

    Water and wastewater

    Water and wastewater bring federal and state thresholds into play early. A water system becomes a federally regulated public water system once it has 15 service connections or regularly serves an average of 25 individuals daily at least 60 days a year [48], and EPA names campgrounds as an example of transient non-community systems [49]. A septic system serving 20 or more persons per day is a large capacity septic system under EPA's underground injection rules [50]. A resort with more than a few units can cross both lines, so the study computes design population and daily flows against them. Where water rights follow prior appropriation, the right matters as much as the well; Utah's rule is "first in time is first in right" [51].

    State campground rules then set the sanitation standard. Two state rules show how the bath decision changes the build.

    RuleMinnesota (recreational camping areas)Virginia (campgrounds)
    Who licensesAnnual license from the Department of Health [44]Permit from the Health Commissioner; apply at least 30 days before opening; annual permits expire after 12 months [46]
    ThresholdFive or more tents or recreational camping vehicles [20]Three or more campsites [21]
    Units coveredTents and recreational camping vehicles [20]Tents, yurts, cabins and other camping units [6]
    Site spacing10 feet between camping vehicles; 2,000 square feet per vehicle site [52]Not set in the sections reviewed
    SewageSystem acceptable to the commissioner of health and the Pollution Control Agency; sewer lines 10 feet from water lines [53]Sanitary facilities no farther than 500 feet and no closer than 30 feet from any campsite [54]
    Units with private bathsFixture schedule applies to camping vehicles "not equipped with toilet and bathing facilities" [55]Cabins with indoor plumbing and approved sewage disposal do not count toward the fixture ratio [54]

    Source: Minn. Stat. 327.14 and 327.15; Minn. R. 4630.0400, 4630.0800 and 4630.0900; Code of Virginia 35.1-1; 12VAC5-450-10, -40 and -100 [20] [44] [52] [53] [55] [21] [6] [46] [54].

    Sites without private toiletsMinnesota toilets (men + women)Virginia toilets, all gendersVirginia lavatoriesVirginia showers (if provided)
    1 to 151 + 1222
    16 to 301 + 2442
    31 to 452 + 2662
    46 to 602 + 3864
    61 to 75 (Virginia) or 61 to 80 (Minnesota)3 + 41084

    Source: Minn. R. 4630.0900 (dependent sites); 12VAC5-450-100 (Virginia schedule; showers and lavatories optional, but the schedule applies when provided) [55] [54].

    The choice between shared bathhouses and en-suite baths is a cost, revenue and permit decision at once. En-suite units cost more and raise wastewater flows, but in Virginia they drop out of the fixture count [54], and the rate premium they earn is something the competitive survey must measure. The study models both layouts when the sponsor has not decided.

    Fire and life safety

    Fire rules reach glamping through tent permits, heating appliances and camp fire rings. Metro Nashville's fire marshal, for example, requires an operational permit for a tent over 400 square feet, an NFPA 701 flame spread certificate, LP-gas containers outside the tent, and 20 feet between tents with sidewalls where cooking is done [16]. Minnesota's campground rule defers fire protection to the state fire marshal [56], and Virginia's rule requires smoke detectors and fire extinguishers, when provided, to be functional and serviced [17]. The study confirms with the local fire code official how tents, wood stoves, propane heaters and fire pits are treated, the fire-flow or water storage required, and how emergency vehicles reach each unit.

    Access

    Access is a credit issue because a resort without all-weather access cannot sell its off-season. The study confirms legal access (recorded easement or public road frontage), road standards for fire apparatus, a second exit where the fire code requires one, winter maintenance, and drive times from airports and population centers. A site near a park entrance but reached by a long unpaved road may compete like a site much farther away.

    Flood

    Flood rules matter for creekside and lakeside sites. The base flood is the flood with a 1% chance of being equalled or exceeded in any year, and for floodplain management a structure is "a walled and roofed building" [18]. Units on wheels that meet the federal recreational vehicle definition are treated differently from cabins on foundations [18] [19]. The study maps every unit, bathhouse and septic field against the current flood map and records which units must be elevated or kept mobile.

    Staffing, parking and site capacity

    RV parks and campgrounds averaged about 5.3 paid employees per establishment in the 2022 Economic Census [40]; a glamping resort with housekeeping, linen and food service needs more, so the study builds staffing by department and season. Density rules cap the unit count: New Jersey's guidance allows no more than 20 campsites and 200 persons per acre [27], and Minnesota sets 2,000 square feet per camping vehicle site [52]. Parking needs one space per unit plus staff and day visitors, and each staff shift adds wastewater, at 15 gallons per employee per eight-hour shift in Minnesota's design rule [57].

    How much wastewater will the units produce, and where can the well go?

    Wastewater volume depends on unit type and baths, and it is often the utility that limits unit count. State design tables give the planning values.

    Establishment typeDesign flow (gallons per day)State rule
    Cabin, resort50 per personMinn. R. 7081.0130 [57]
    Resort or lodge hotel62 per personMinn. R. 7081.0130 [57]
    Campsite without sewer hook-up, central toilet or shower50 per siteMinn. R. 7081.0130 [57]
    Campsite with sewer hook-up100 per siteMinn. R. 7081.0130 [57]
    Resort cabin50 per personAla. Admin. Code 420-3-1, Table 1 [58]
    Day and night camp with bathhouse45 per personAla. Admin. Code 420-3-1, Table 1 [58]
    Campground with central comfort station35 per person20.7.3 NMAC [59]
    Hotels, motels, lodges60 per bed20.7.3 NMAC [59]

    Source: Minn. R. 7081.0130, Table I; Alabama Administrative Code 420-3-1, Table 1; 20.7.3 NMAC [57] [58] [59].

    Thirty cabins with two guests each at Minnesota's 50 gallons per person produce 3,000 gallons per day; ten staff shifts add 150, for 3,150 [57]. That resort serves 60 persons at full occupancy, past EPA's 20-person line for a large capacity septic system [50], and its flow is double Illinois' 1500 gallon threshold for an engineer-designed system [36]. Thirty tent sites sharing a bathhouse at 50 gallons per site would produce 1,500 gallons per day [57]. Minnesota requires measured flows when they exceed the table [57], which matters when an existing campground expands.

    Well siting follows the septic layout. Minnesota keeps a water-supply well at least 50 feet from a septic tank or soil dispersal area, and 300 feet from the absorption area of a system over 10,000 gallons per day [60]. The study puts wells, tanks, drainfields and units on one plan, checks each distance against the governing rule, and confirms public water system status under EPA's thresholds [48].

    How do wildfire and flood exposure affect the site and the loan?

    They affect where units go, what they cost to insure, and whether the lender must require insurance. Many strong glamping markets sit in high-risk wildfire counties, so the study reads the hazard data before the site plan is fixed.

    County (nearby park)BuildingsShare of buildings directly exposedWildfire likelihood, national percentileRisk to homes, national percentile
    Mariposa County, CA (Yosemite)16,57894.8%9898
    Washington County, UT (Zion)74,87532.7%9497
    Coconino County, AZ (Grand Canyon)70,44053.8%9496
    Tulare County, CA (Sequoia)188,92834.0%9494
    Larimer County, CO (Rocky Mountain)155,98436.8%9294
    San Bernardino County, CA (Joshua Tree)752,39519.7%8993
    Flathead County, MT (Glacier)70,87766.5%9092
    Brewster County, TX (Big Bend)9,86564.0%8889
    Teton County, WY (Grand Teton)14,47475.8%8788
    Park County, WY (Yellowstone)23,70452.5%7781
    Sevier County, TN (Great Smoky Mountains)63,43280.0%8079
    Garfield County, UT (Bryce Canyon)6,36962.6%6373
    Clallam County, WA (Olympic)52,31445.2%2325
    Hancock County, ME (Acadia)52,18583.1%1212

    Source: USDA Forest Service, Wildfire Risk to Communities, data download updated April 15, 2026 (county tab: buildings in the Direct Exposure Zone, mean burn probability percentile and mean risk to potential structures percentile, national); fractions converted to percentages by FSC [61].

    Wildfire likelihood is the county's mean burn probability percentile and risk to homes its mean risk to potential structures percentile [61]; both can diverge from the share of buildings exposed. Mariposa County ranks at the 98th national percentile on both, Hancock County, Maine at the 12th, though 83.1% of its buildings sit in the direct exposure zone [61]. In a high-risk county the study budgets defensible space, noncombustible platforms, fire water storage, a second access route and a guest evacuation plan, and confirms insurance quotes before the projection is final.

    Flood risk carries a legal consequence. Federal law bars regulated lenders and federal agency lenders from making, increasing, extending or renewing a loan secured by improved real estate in a mapped special flood hazard area unless the building is insured for the term of the loan [62]. Cabins, bathhouses and lodges are buildings; tents and road-ready park units are treated differently under floodplain rules [18] [19]. The study maps every structure, lists which need coverage, and carries the premium in the budget.

    Can a glamping resort operate under farm and agritourism rules?

    Sometimes, but agritourism status is narrower than many landowners assume, and overnight lodging is rarely named in the definitions.

    State and ruleWhat it coversLimit or conditionWhat the study confirms
    Oregon, ORS 215.283(2)(c)Private campgrounds in exclusive farm use zonesCounty approval; yurts on at most one-third of campsites or 10 [22]County approval and yurt count
    Oregon, ORS 215.213(11)Agri-tourism events on farmlandSingle event: no more than 72 hours, 500 people, 250 vehicles [22]Events in the projection match the authorization
    North Carolina, G.S. 99E-30Agritourism activity definitionActivity on a farm or ranch letting the public view or enjoy rural activities [63]Whether lodging qualifies at the site
    North Carolina, G.S. 160D-903County zoning exemption for agritourism buildingsQualifying farm sales tax certificate or present-use value, kept for three years after classification [64]That the farm qualifies and will keep qualifying
    Virginia, Code 3.2-6400Agritourism activity definitionActivity on a farm or ranch for recreation, entertainment or education [65]Whether the county treats overnight stays as agritourism
    Virginia, Code 15.2-2288.6Local regulation of agritourismNone unless there is a substantial impact on health, safety or welfare [66]The county's position in writing

    Source: ORS chapter 215 (2025 edition); G.S. 99E-30 and 160D-903; Code of Virginia 3.2-6400 and 15.2-2288.6 [22] [63] [64] [65] [66].

    Neither the North Carolina nor the Virginia definition names overnight lodging [63] [65]. A farm stay selling nights in tents or cabins may still need county campground or short-term rental approval, a state health license and lodging tax registration. Where the agritourism route is open it can shorten the land use path, but the lender will want the county's written confirmation, and the study makes that letter a condition of its conclusion.

    How are lodging taxes applied to tents, yurts and cabins?

    Lodging taxes generally reach glamping in the states reviewed here, because their statutes name tent sites, campgrounds, cottages or cabins. The study should state the full tax rate on room rent at the site's address, show whether published rates include or exclude it, and confirm whether any long-stay exemption applies.

    StateTax and rateGlamping-relevant languageLong-stay rule
    OregonState transient lodging tax of 1.5%, plus any local tax [67]Covers "spaces used for parking recreational vehicles or erecting tents" and houses and cabins used for temporary occupancy [67]Exempt when the same person occupies the unit for 30 days or more [67]
    Florida6% on total rental charged [68]Reaches tourist or trailer camps, mobile home parks and recreational vehicle parks [68]Written agreements for continuous residence longer than 6 months are not taxable [68]
    MinnesotaState sales tax on lodging [69]Reaches lodging by a "hotel, rooming house, resort, campground, motel, or trailer camp" [69]Excludes rentals for a continuous period of 30 days or more under a qualifying written agreement [69]
    UtahSales tax on accommodations plus transient room taxes [70] [71]Taxes short-term rentals of "tourist home, hotel, motel, or trailer court accommodations" [70]Confirm treatment of tents and yurts with the Tax Commission
    North CarolinaGeneral sales tax rate of 4.75% applies to accommodation rentals [72] [73]An accommodation is "a hotel room, a motel room, a residence, a cottage, or a similar lodging facility" [74]Exempt when supplied to the same person for 90 or more continuous days [73]

    Source: ORS 320.300, 320.305 and 320.308; s. 212.03, F.S.; Minn. Stat. 297A.61; Utah Code 59-12-103; Utah State Tax Commission rates in effect October 1, 2026; G.S. 105-164.3, 105-164.4 and 105-164.4F [67] [68] [69] [70] [71] [74] [72] [73].

    Rates near parks can be high. Among the Utah gateway locations below, the total rate on transient room rent runs from 12.92% in unincorporated Garfield County to 16.42% in Moab [71]. Whether a tent or yurt is a "similar lodging facility" in North Carolina, or a tourist home or trailer court accommodation in Utah, is a question the study puts to the state revenue department in writing.

    Utah location (park nearby)Combined sales and use tax rateTotal rate on transient room rent
    Garfield County, unincorporated (Bryce Canyon, Capitol Reef)7.35%12.92%
    Tropic (Bryce Canyon)8.35%14.92%
    Springdale (Zion)8.38%14.95%
    Kanab (Zion, Bryce Canyon)8.45%15.02%
    Bryce Canyon City (Bryce Canyon)8.55%15.12%
    Torrey (Capitol Reef)9.05%15.62%
    Moab (Arches, Canyonlands)9.35%16.42%

    Source: Utah State Tax Commission, rates applied to certain transactions, in effect October 1, 2026; the transient room rate includes the combined sales and use rate [71].

    A study that compares the subject's rates with competitors must compare like with like: rates before tax, or rates with the same tax included.

    Ten more states show how far lodging tax reaches into camping. Most name tents, campsites or cabins directly; in Texas the question is whether the unit is a building.

    StateTax and rateLanguage that reaches glampingLong-stay or open line
    Montana4% lodging facility use tax [75] plus 4% sales tax on accommodations and campgrounds [76]Campgrounds named [76]Confirm local resort taxes
    IdahoSales tax at six percent (6%) [77]Hotel, motel, campground, or trailer court accommodations [78]Exempt beyond thirty (30) days under a lease [78]
    MaineNine percent on living quarters in a tourist or trailer camp, sales on or after October 1, 2019 [79]Living quarters include tent or trailer space [80]Confirm long-stay rules
    New Hampshire8.5 percent of rent on each occupancy [81]Hotel includes cabins, cottages and camps [82]Permanent resident at 185 consecutive days [82]
    VermontNine percent of rent of each occupancy [83]Hotel includes tourist homes and cabins [84]Permanent resident at 30 consecutive days [84]
    WyomingStatewide five percent (5%) on lodging services, on top of sales tax [85]Confirm whether tent sites are lodging servicesConfirm local lodging taxes
    South DakotaOne and one-half percent tourism tax [86]Lodging establishments and campgrounds named [86]Confirm sales taxes
    TexasSix percent of the price of a room in a hotel [87]A hotel is a building for sleeping accommodations [87]Whether a tent is a building
    ColoradoCounty lodging tax in certain counties [88]Covers camping facilities and services [88]Exempt at 30 or more consecutive days [88]
    MissouriState and local sales taxCabin rentals and tent camping fees taxable [89]Confirm local tourism taxes

    Source: MCA 15-65-111 and 15-68-102; Idaho Code 63-3612 and 63-3619; 36 M.R.S. 1752 and 1811; RSA 78-A:3 and 78-A:6; 32 V.S.A. 9202 and 9241; 2020 Wyoming Enrolled Act No. 7; SDCL 10-45D-2; Texas Tax Code chapter 156; Colorado FYI Sales 11; Missouri Department of Revenue [75] [76] [77] [78] [79] [80] [81] [82] [83] [84] [85] [86] [87] [88] [89].

    Long-stay lines differ between tax and financing: SBA's transient test counts stays of 30 days or less [9], while New Hampshire's rooms tax runs to 185 consecutive days [82]. A resort selling monthly winter stays tracks both.

    What does it cost to develop a glamping resort?

    Development cost depends on unit type, utilities, buildings and site work, and no primary source publishes glamping costs, so a study builds them from the sponsor's design, contractor and supplier quotes, and engineers' estimates, presented as assumptions. The table below shows one modelled structure to illustrate where the money goes. It is not market data.

    Cost categoryShare of development cost before financing costs (model assumption)What drives it
    Guest units: tents, domes and cabins with en-suite baths30.6%Unit type, insulation, bath modules, platform and foundation design
    Lodge and service buildings15.0%Food service, reception, laundry and maintenance space
    Land and water right7.6%Land price, water right purchase or change application
    Pre-opening, working capital and debt service reserve7.6%Opening timeline, lender reserve requirements
    Site work: grading, roads, parking, trails7.0%Terrain, road length, fire apparatus access
    Hard-cost contingency6.7%Design maturity and input cost trend
    Design, engineering, permits, studies, legal and insurance6.5%Jurisdiction, review cycles, number of agencies
    Wastewater system5.6%Soils, design flow, en-suite versus shared baths
    Water system4.8%Well yield, storage for fire flow, treatment
    Power and propane4.5%Line extension distance, transformer and distribution
    FF&E, OS&E and vehicles4.2%Furnishing standard and guest amenities

    Source: FSC model study, 45-pad glamping resort in Garfield County, Utah; assumptions in 2027 dollars, financing costs excluded, shares calculated by FSC and rounded (they sum to 100.1%). These are modelled inputs, not a survey of costs.

    In that model, site work, water, wastewater and power together cost 71.5% as much as the guest units themselves. That is why a budget built from unit prices alone understates cost. Input prices also move between the budget and the bids. A study carries a hard-cost contingency sized to design maturity and asks for fixed-price bids before commitment.

    How does the study test debt service coverage?

    The study tests coverage by year, by quarter and under stress, because a seasonal resort can show a healthy annual ratio and still miss payments in closed months. USDA defines the ratio as EBITDA less expected replacement capital spending, divided by annual debt service [7], so tent and soft-goods replacement sits above the line. SBA 7(a) projections must reach 1.15 or more within two years of funding [9].

    Scenario (Utah model study, model results)Year 2 coverageYear 3 coverage
    Base case1.05x1.31x
    A. Demand shock: occupancy -15%, ADR -8%, all years0.62x0.82x
    B. Shoulder months lost: tents and domes closed April and October0.78x0.99x
    C. Rate shock: 10.50% from closing0.90x1.12x
    D. 12% cost overrun, financed 60/400.93x1.16x
    E. Combined A and C0.53x0.70x

    Source: FSC model study, 45-pad glamping resort in Garfield County, Utah (USDA B&I structure); model results for one hypothetical resort, not market data.

    In that model each 100 basis points moved stabilized coverage about 0.10x, while a 10% occupancy miss moved it about 0.23x, and at the program's 25% minimum equity Year 3 coverage was only 1.02x. A study that reports only the base case hides the results a lender most needs.

    Which financing paths fit a glamping resort?

    Four financing paths are compared below: SBA 7(a), SBA 504, USDA Business and Industry (B&I) guaranteed loans in rural areas, and conventional bank loans. Each reads the feasibility study differently.

    FeatureSBA 7(a)SBA 504USDA B&I guaranteed loanConventional bank loan
    Maximum loan$5,000,000 [8]504 debenture balance of $5,000,000 per borrower for most projects [8]$25 million per borrower [7]Set by lender policy
    Glamping eligibility pointMore than 50% of revenue from transients staying 30 days or less [9]Same test; the CDC decides whether the property is limited or special purpose, and the list includes "hotels, motels, and other lodging facilities" [9]Tourist and recreation facilities, including campgrounds, are eligible; residential trailer parks and housing are not [7]Set by lender policy
    Equity or contribution10% of total project costs for a start-up [9]10%; 15% for a business operating two years or less or a limited or single purpose building; 20% when both apply [8]New business with construction: 25% balance sheet equity or a 3 to 1 debt-to-equity ratio; other new businesses 20% [7]Set by lender policy
    CoverageProjections at 1.15 or more within 2 years of funding [9]1.15 on historical cash flow; projection-based projects need at least 2 years of projections [9]Ratio defined as EBITDA less expected replacement capital spending, divided by annual debt service [7]Set by lender policy
    Feasibility studySBA may require one [8]SBA may request one for a unique market concept or an outsized project [9]Required for new businesses over $1,000,000 [7]At lender discretion
    GeographyNationalNationalRural areas outside cities over 50,000 people [7]National
    Guarantee or structureUp to 85% on loans of $150,000 or less; up to 75% above [8]Third party lender 50% or more, CDC debenture up to 40%, borrower at least 10% in the standard structure [9]85% under $5 million; 80% from $5 million to $25 million in fiscal 2026 [90]No federal guarantee

    Source: 13 CFR Part 120 and 7 CFR Part 5001 (GovInfo, 2026 editions); SBA SOP 50 10 8.1; USDA FY2026 OneRD notice (Federal Register, via GovInfo) [8] [7] [9] [90].

    Rates move with the market. The bank prime rate was 7.00% in the Federal Reserve's H.15 release of November 10, 2026 [91]; the study's debt service should use the lender's quoted structure and a stress case above it. For B&I, the maximum term runs to the justified useful life of the assets, not exceeding 40 years [7], so tents and soft goods with short lives need their own replacement reserve in the projection. The Utah model study applies these B&I rules to a full budget.

    Which SBA rules matter most for a glamping resort?

    Beyond the transient test, a handful of SBA rules decide whether a glamping file works. The table draws them from SBA's procedures effective October 1, 2026 [9].

    Rule in SOP 50 10 8.1What it saysWhy it matters
    Transient businessesEligible only if the business complies with all zoning and other legal requirements [9]An unpermitted unit can sink eligibility
    Platform and direct rentalsMust comply with local laws, zoning codes and association rules [9]Short-term rental rules reach cabins sold online
    Start-up businessIn operation 1 year or less [9]A first-season resort proves the transient test with projections
    Real estate occupancy60% of Rentable Property for new construction; 51% for an existing building [9]Leasing units or land to others can break the test
    Management agreementLender must obtain and review it [9]Owner-operator control must be documented
    Seasonal CAPLine12 calendar months in operation and a definite pattern of seasonal activity; not for slow-period costs [9]Winter carrying costs need a reserve
    Interest-only periodsNot permitted beyond the borrower's seasonal cycle [9]Opening schedules must fit
    Loan termsReal estate up to 25 years plus construction; equipment up to 15 years if useful life supports it [9]Tents and soft goods need short terms or reserves
    Feasibility study triggersInclude market saturation and highly specialized project property [9]A crowded gateway town can trigger a request

    Source: SBA SOP 50 10 8.1, effective October 1, 2026 [9].

    Can USDA's energy program help a rural glamping resort?

    Yes, in part. The Rural Energy for America Program (REAP) funds renewable energy systems and energy efficiency improvements for rural small businesses, such as a resort's solar array or efficient heating, but not the units themselves.

    REAP rule (7 CFR 4280)What it says
    ApplicantAn agricultural producer or rural small business at application [92]
    Rural areaNot in a city or town of more than 50,000 inhabitants or its contiguous urbanized area [93]
    Grant shareNo more than 25 percent of eligible project costs [94]
    Grant sizeRequests from $2,500 (RES) and $1,500 (EEI) up to $500,000 and $250,000, unless a notice says otherwise [94]
    Annual capNo more than $750,000 to one entity per federal fiscal year [94]
    Cost timingOnly costs after a complete application count [94]
    Environmental reviewActions before the review can make the project ineligible [95]

    Source: 7 CFR 4280.103, 4280.112, 4280.113 and 4280.115 (GovInfo, revised as of January 1, 2026) [93] [92] [95] [94].

    The study shows the project with and without the grant, so the conclusion does not depend on an award that may arrive after construction would otherwise start.

    What must a glamping feasibility study contain?

    A glamping feasibility study must contain enough evidence for a lender to repeat the analysis and reach the same conclusion. At a minimum:

    1. A clear statement of the project: site, acreage, unit types and counts, bath arrangement, amenities, phasing and the operator.
    2. A market area definition by drive time, with the demand generators and their monthly visitation.
    3. A demand analysis that converts visitor and traveler flows into unit-night demand by month, with each assumption stated.
    4. A competitive supply survey of named properties, with unit types, counts, seasons and published rates, plus the permitted pipeline.
    5. A rate and occupancy forecast by unit type and month, labeled as assumptions, with the rate-shopping and interview evidence behind it.
    6. A zoning and permit analysis: the use category, the approvals required, conditions, and the classification of each unit type under building, fire and health rules.
    7. A utilities analysis: water source and right, public water system status, wastewater design flow and permit path, power, propane and telecommunications.
    8. Access, fire protection and flood analysis for every unit and support building.
    9. A development budget with sources and uses, a contingency, and the construction schedule's effect on opening season.
    10. A multi-year operating projection with a monthly or quarterly view, operating expenses by department, and reserves for replacing tents and soft goods.
    11. Debt service coverage under the proposed structure, with the program tests (transient revenue share, equity, coverage) shown explicitly.
    12. Sensitivity and stress tests on rate, occupancy, season length, opening delay and interest rate.
    13. A conclusion on feasibility, with the risks and the conditions under which the conclusion holds.

    What documents does the study need?

    The study needs documents that fix the project, the site and the operator; missing items are the most common cause of delay.

    DocumentWhat it settles
    Site plan with units, roads, parking and utilitiesUnit count, density, setbacks and access
    Unit specifications (size, foundation, plumbing, heat, cooking)Code category of each unit type
    Title report and access easementsLegal access and encumbrances
    Zoning determination or permit with conditionsUse category, unit caps, seasons
    Well log, water right or provider letterSupply and public water system status
    Soil tests and wastewater designDesign flow and treatment path
    Flood determination and elevation certificatesFlood insurance and siting
    Budget with contractor or supplier quotesHard costs and contingency
    Operator background or management agreementManagement capacity and SBA passive-business test
    Financing term sheet or program targetDebt structure for coverage

    Source: FSC intake checklist, following the study contents above and the program rules in 7 CFR Part 5001 and SOP 50 10 8.1 [7] [9].

    What does the engagement deliver, and what sets its schedule?

    The engagement delivers one written report a lender can read on its own, plus the working model behind it. No glamping fee band is published, so this page describes scope and deliverables only.

    DeliverableContents
    Feasibility reportConclusion, conditions, market, supply, site and rules analysis, projections and risks
    Monthly demand scheduleUnit-nights by month and unit type, with each assumption shown
    Competitive survey exhibitNamed competitors, unit types, seasons, published rates and pipeline
    Permit and utility matrixEach approval, its agency, status and cost line
    Projection and coverage modelAnnual and quarterly cash flow, coverage and stress tables

    Source: FSC engagement scope.

    The schedule depends mostly on things outside the study: how fast the intake documents arrive, whether zoning and health officials answer in writing, the site visit window, and the number of lender review rounds. The work runs in seven steps:

    1. Intake: the sponsor's concept, site plan, budget, financing target and any existing operations.
    2. Site visit and market area tour, including competitors and demand generators.
    3. Data collection: federal and state statistics, permit and license records, lodging tax data, rate shopping and interviews.
    4. Agency confirmations on zoning, health, fire, water and flood items.
    5. Analysis: demand, supply, rate and occupancy, budget review and projections.
    6. Draft report, lender questions and revisions.
    7. Final report delivered to the sponsor and the lender.

    The firm behind this page is described on the about page.

    What happens after the loan closes?

    After closing, the lender keeps testing the study's assumptions. USDA's rule sets minimum reporting for B&I loans.

    Requirement (7 CFR 5001)What it says
    Financial statementsSubmitted to the Agency within 120 days of the borrower's fiscal year end [7]
    Accounting standardRequired for borrowers with a guaranteed balance over $600,000 [7]
    ServicingIncludes periodic borrower visits [7]
    Construction monitoringLender monitors progress and inspects for code conformance [7]
    InspectorA qualified consultant with at least 3 years of experience and five similar inspections [7]
    First paymentFirst full principal and interest payment within 3 years of the note [7]

    Source: 7 CFR Part 5001 (GovInfo, revised as of January 1, 2026) [7].

    The most useful monitoring lines are occupancy by unit type against the monthly schedule, shoulder-month nights actually sold, and the replacement reserve against the tent replacement plan. A weak first summer shows in those three lines before it shows in coverage.

    Download the evidence behind this page's exhibits (CSV, 830 data points with sources)

    Frequently Asked Questions

    What is a glamping feasibility study?
    It is an independent report that concludes whether a planned glamping resort can earn enough, on a specific site, to cover costs and debt. It tests economic, market, technical, financial and management feasibility, the same five areas USDA's rule names [7].
    Do lenders require a feasibility study for a glamping resort?
    Some programs require one by rule, and any lender can ask for one. USDA requires one for B&I guaranteed loans over $1,000,000 to a new business [7]. SBA may require one on any loan [8], and its procedures list a unique market concept as a reason to ask [9].
    Can a glamping resort get an SBA loan?
    Yes, if it is an operating business that meets SBA's test for campgrounds and similar businesses: more than 50% of revenue from guests staying 30 days or less [9]. A start-up proves the test with projections.
    Is a glamping resort special purpose property for an SBA 504 loan?
    It can be. The CDC decides and must explain its conclusion, and SBA's example list includes "hotels, motels, and other lodging facilities" [9]. A limited or special purpose finding raises the borrower contribution to 15%, or 20% for a new business [8].
    Does USDA finance glamping resorts?
    USDA's B&I program lists tourist and recreation facilities, including resort trailer parks and campgrounds, as eligible in rural areas outside cities of more than 50,000 people [7]. Residential housing uses are ineligible.
    Is there public data on glamping occupancy and rates?
    No. No public dataset publishes glamping rates, occupancy or unit counts, and the NAICS index has no glamping entry [2]. The study collects published rates and availability from the competitive set and confirms them through interviews.
    How seasonal is a glamping resort?
    It depends on the market. In 2025 Glacier took 90.9% of its visits from May to September, while Joshua Tree took 30.8% in December to February [1]. The study models each month and each unit's operating window.
    Do glamping tents need building permits?
    It depends on the jurisdiction and the unit. Utah exempts a remote yurt only if it has no plumbing or electricity and meets size and siting limits [4], and Metro Nashville requires a fire permit for tents over 400 square feet [16]. A yurt with power or a bath falls outside Utah's exemption.
    Is a glamping resort a campground under state health rules?
    In the states reviewed here, usually yes. Virginia's rule covers yurts and cabins as camping units at three or more campsites [21] [6], and Minnesota licenses areas for five or more tents [20]. Oregon licenses recreation parks and travelers' accommodations as tourist facilities [45].
    Do lodging taxes apply to glamping units?
    In the states reviewed here, generally yes. Oregon's lodging tax covers tent spaces and cabins [67], Florida taxes rentals in tourist or trailer camps and RV parks [68], and Minnesota taxes lodging by campgrounds [69].
    What water and wastewater rules apply?
    A system serving 25 or more people daily for 60 days a year is a public water system [48], and a septic system serving 20 or more persons per day is a large capacity system [50]. State campground rules then set fixture counts and distances [54] [55].
    How does a glamping study differ from an RV park study?
    The demand base overlaps, but a glamping study prices furnished units rather than sites and must classify each unit under building, fire and health rules. Campgrounds earned 80.9% of 2022 revenue from RV and tent sites [3]. See the RV park feasibility study for the site-based model.
    Which park markets have the strongest winter demand?
    Desert parks. In 2025 Big Bend took 28.8% of its visits from December to February and Joshua Tree took 30.8% [1]. Northern parks such as Sleeping Bear Dunes took 2.4% in those months, so a canvas resort there is a summer business.
    How many units can a site have before state campground rules apply?
    Very few. The threshold is 2 campsites in South Dakota, New Hampshire and New Jersey, three in Virginia, five in Minnesota and Maine, and ten in Indiana [26] [23] [27] [21] [20] [29] [32]. The study names the license that applies and its renewal cycle.
    Can a camping cabin have its own bathroom?
    It depends on the state, and the answer changes the license. South Dakota bars a bathroom in a camping cabin, and its lodging definition covers cabins and resorts [24] [26]. Virginia does not count cabins with indoor plumbing and approved sewage disposal toward the campground fixture ratio [54].
    Can yurts be placed on farmland?
    In Oregon's exclusive farm use zones, a private campground may provide yurts with county approval, on no more than one-third of campsites or 10, whichever is smaller, and without a permanent foundation [22]. Other states set their own limits through county zoning.
    Is a glamping resort an agritourism business?
    Usually not by definition alone. North Carolina and Virginia define agritourism as activities that let the public view or enjoy rural activities on a farm or ranch, and neither definition names overnight lodging [63] [65]. The study gets the county's written position before relying on agritourism treatment.
    How much wastewater does a glamping cabin produce?
    Planning values run near 50 gallons per person per day for resort cabins in Minnesota and Alabama [57] [58]. Thirty cabins with two guests each, plus ten staff shifts, come to 3,150 gallons per day under the Minnesota values [57].
    How far must a well be from a septic system?
    It varies by state. Minnesota requires at least 50 feet from a septic tank and 300 feet from the absorption area of a system over 10,000 gallons per day [60]. The study checks every distance on one site plan against the governing rule.
    Does wildfire risk affect a glamping loan?
    It affects siting, insurance and the budget. Several gateway counties rank above the 90th national percentile for risk to homes, including Mariposa, Washington, Coconino and Flathead counties [61]. The study budgets defensible space, fire water storage and a second access route there, and confirms insurance before the projection is final.
    Is flood insurance required for glamping cabins?
    If a cabin, lodge or bathhouse securing the loan sits in a mapped special flood hazard area, federal law requires flood insurance for the term of the loan [62]. Tents and road-ready units on wheels are treated differently under floodplain rules [19].
    Can USDA's REAP program pay for solar at a glamping resort?
    It can pay part of it if the resort is a rural small business in a rural area. Grants cover no more than 25 percent of eligible project costs, and only costs incurred after a complete application count [92] [94].
    What SBA terms fit a seasonal glamping resort?
    Real estate loans can run up to 25 years plus construction time, and equipment up to 15 years where the asset class supports it [9]. A Seasonal CAPLine needs at least 12 calendar months of operation, and interest-only periods may not run beyond the seasonal cycle [9].
    What occupancy should a glamping study assume?
    No public benchmark exists, so the study builds occupancy from demand and supply evidence for the site. It also states the denominator: in the Utah model study, 66.7% of available unit-nights equals 46.1% of a full 365-night year.
    What happens after a USDA-guaranteed loan closes?
    The lender submits the borrower's financial statements within 120 days of fiscal year end, makes periodic borrower visits and monitors construction for code conformance [7]. A study whose monthly schedule matches the operating statements makes that monitoring simple.

    Sources

    1. 1.National Park Service. "Recreation Visitors By Month (1979 - Last Calendar Year), park-specific reports for the 26 park units named on this page." https://irma.nps.gov/Stats/SSRSReports/Park%20Specific%20Reports/Recreation%20Visitors%20By%20Month%20%281979%20-%20Last%20Calendar%20Year%29 (accessed 2026-11-11 and 2026-11-12)
    2. 2.U.S. Census Bureau. "2022 NAICS Index File." https://www.census.gov/naics/2022NAICS/2022_NAICS_Index_File.xlsx (accessed 2026-11-11)
    3. 3.U.S. Census Bureau. "2022 Economic Census, Products by Industry (EC2200NAPCSINDPRD)." https://www2.census.gov/programs-surveys/economic-census/data/2022/sector00/EC2200NAPCSINDPRD.zip (accessed 2026-11-11)
    4. 4.Utah Legislature. "Utah Code 15A-1-202, Definitions (State Construction and Fire Codes Act)." https://le.utah.gov/xcode/Title15A/Chapter1/C15A-1-S202_2026010120250507.html (accessed 2026-11-11)
    5. 5.Utah Legislature. "Utah Code 15A-1-204, Adoption of State Construction Code." https://le.utah.gov/xcode/Title15A/Chapter1/C15A-1-S204_2025110620251206.html (accessed 2026-11-11)
    6. 6.Virginia Department of Health (Virginia Administrative Code). "12VAC5-450-10, Definitions (Rules and Regulations Governing Campgrounds)." https://law.lis.virginia.gov/admincode/title12/agency5/chapter450/section10/ (accessed 2026-11-11)
    7. 7.USDA Rural Development (via GovInfo). "7 CFR Part 5001, OneRD Guaranteed Loans (revised as of January 1, 2026)." https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml (accessed 2026-11-11)
    8. 8.U.S. Small Business Administration (via GovInfo). "13 CFR Part 120, Business Loans (revised as of January 1, 2026)." https://www.govinfo.gov/content/pkg/CFR-2026-title13-vol1/xml/CFR-2026-title13-vol1-part120.xml (accessed 2026-11-11)
    9. 9.U.S. Small Business Administration. "SOP 50 10 8.1, Lender and Development Company Loan Programs (effective October 1, 2026)." https://www.sba.gov/document/sop-50-10-lender-development-company-loan-programs (accessed 2026-11-11)
    10. 10.National Park Service. "Overnight Stays National (1979 - Last Calendar Year)." https://irma.nps.gov/Stats/SSRSReports/National%20Reports/Overnight%20Stays%20National%20(1979%20-%20Last%20Calendar%20Year) (accessed 2026-11-11)
    11. 11.National Park Service. "Overnight Stays (1979 - Last Calendar Year), park-specific reports for the parks named on this page." https://irma.nps.gov/Stats/SSRSReports/Park%20Specific%20Reports/Overnight%20Stays%20%281979%20-%20Last%20Calendar%20Year%29 (accessed 2026-11-11 and 2026-11-12)
    12. 12.National Park Service, Bryce Canyon National Park. "Bryce Canyon Visitation in 2025." https://www.nps.gov/brca/learn/news/2026-03-17-visitation-stats.htm (accessed 2026-11-11)
    13. 13.U.S. Bureau of Economic Analysis. "Outdoor Recreation." https://www.bea.gov/data/special-topics/outdoor-recreation (accessed 2026-11-11)
    14. 14.U.S. Bureau of Economic Analysis. "Outdoor Recreation Value Added by Activity, 2012 to 2024." https://www.bea.gov/sites/default/files/2026-03/ores0326-VA-Activity.xlsx (accessed 2026-11-11)
    15. 15.U.S. Bureau of Economic Analysis. "Outdoor Recreation Economic Statistics, U.S. and States, 2024: state tables." https://www.bea.gov/sites/default/files/2026-03/ores0326-state.xlsx (accessed 2026-11-11)
    16. 16.Metropolitan Nashville Fire Marshal's Office. "Tents and Membrane Structures (operational permit)." https://filetransfer.nashville.gov/portals/0/sitecontent/Fire/docs/firemarshal/Permits/types/TentsAndMembraneStructures.pdf (accessed 2026-11-11)
    17. 17.Virginia Department of Health (Virginia Administrative Code). "12VAC5-450-115, Cabins and other rental units." https://law.lis.virginia.gov/admincode/title12/agency5/chapter450/section115/ (accessed 2026-11-11)
    18. 18.Federal Emergency Management Agency (via GovInfo). "44 CFR 59.1, Definitions (revised as of October 1, 2025)." https://www.govinfo.gov/content/pkg/CFR-2025-title44-vol1/xml/CFR-2025-title44-vol1-sec59-1.xml (accessed 2026-11-11)
    19. 19.Federal Emergency Management Agency (via GovInfo). "44 CFR 60.3, Flood plain management criteria for flood-prone areas (revised as of October 1, 2025)." https://www.govinfo.gov/content/pkg/CFR-2025-title44-vol1/xml/CFR-2025-title44-vol1-sec60-3.xml (accessed 2026-11-11)
    20. 20.Minnesota Office of the Revisor of Statutes. "Minn. Stat. 327.14, Definitions (manufactured home parks and recreational camping areas)." https://www.revisor.mn.gov/statutes/cite/327.14 (accessed 2026-11-11)
    21. 21.Virginia General Assembly. "Code of Virginia 35.1-1, Definitions." https://law.lis.virginia.gov/vacode/title35.1/chapter1/section35.1-1/ (accessed 2026-11-11)
    22. 22.Oregon Legislature. "ORS Chapter 215 (2025 Edition), County Planning; Zoning; Housing Codes (ORS 215.010, 215.213, 215.283)." https://www.oregonlegislature.gov/bills_laws/ors/ors215.html (accessed 2026-11-12)
    23. 23.New Hampshire General Court. "RSA 216-I:1, Definition (recreational campgrounds and camping parks)." https://gc.nh.gov/rsa/html/XIX/216-I/216-I-1.htm (accessed 2026-11-12)
    24. 24.South Dakota Legislature (Department of Health rules). "ARSD chapter 44:02:14, Campground Regulation." https://sdlegislature.gov/api/Rules/Rule/44:02:14.html?all=true (accessed 2026-11-12)
    25. 25.Montana Department of Public Health and Human Services. "ARM Title 37, chapter 111, subchapter 12: Trailer Courts, Campgrounds, Youth Camps, and Work Camps." https://dphhs.mt.gov/assets/publichealth/FCS/TrailerCourts/TrailerCourtCampgroundRules2023.pdf (accessed 2026-11-12)
    26. 26.South Dakota Legislature. "SDCL 34-18-1, Definition of terms (lodging establishments and campgrounds)." https://sdlegislature.gov/api/Statutes/34-18-1.html?all=true (accessed 2026-11-12)
    27. 27.New Jersey Department of Health. "Protecting Public Health at New Jersey Campgrounds (2023 guidance)." https://nj.gov/health/ceohs/documents/phfpp/NJDOH_Campground_Guidance_2023.pdf (accessed 2026-11-11)
    28. 28.Montana Department of Public Health and Human Services. "Title 50, chapter 52, MCA, Trailer Courts, Campgrounds, Work Camps, and Youth Camps (statute compilation)." https://dphhs.mt.gov/assets/publichealth/FCS/TrailerCourts/TrailerCourtMCA.pdf (accessed 2026-11-12)
    29. 29.Maine Legislature. "Maine Revised Statutes, Title 22, section 2491, Definitions (eating and lodging places, campgrounds)." https://legislature.maine.gov/statutes/22/title22sec2491.html (accessed 2026-11-12)
    30. 30.Massachusetts Legislature. "General Laws, Part I, Title XX, Chapter 140, Section 32A." https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXX/Chapter140/Section32A (accessed 2026-11-11)
    31. 31.Massachusetts Legislature. "General Laws, Part I, Title XX, Chapter 140, Section 32B." https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXX/Chapter140/Section32B (accessed 2026-11-11)
    32. 32.Indiana Department of Health. "410 IAC 6-7.1, Campgrounds." https://www.in.gov/health/eph/laws-rules-and-forms/410-iac-6-71-campgrounds/ (accessed 2026-11-11)
    33. 33.Louisiana Office of the State Register. "Louisiana Administrative Code, Title 51 (Public Health Sanitary Code), Part XVI, Campsites." https://www.doa.la.gov/media/dtxju50z/51.docx (accessed 2026-11-11)
    34. 34.Broome County Health Department. "Campgrounds (Environmental Health)." https://broomecountyny.gov/eh/campgrounds/ (accessed 2026-11-11)
    35. 35.Clinton County Health Department. "Campgrounds." https://www.clintoncountyny.gov/node/4426 (accessed 2026-11-11)
    36. 36.Illinois General Assembly (Joint Committee on Administrative Rules). "77 Ill. Adm. Code 800.300, Permits (campgrounds)." https://ftp.ilga.gov/JCAR/AdminCode/077/077008000B03000R.html (accessed 2026-11-11)
    37. 37.Illinois General Assembly (Joint Committee on Administrative Rules). "77 Ill. Adm. Code 800.1000, Toilet and bathing facilities (campgrounds)." https://ftp.ilga.gov/JCAR/AdminCode/077/077008000I10000R.html (accessed 2026-11-11)
    38. 38.Georgia Department of Public Health. "Rules and Regulations, Tourist Accommodations, Chapter 511-6-2." https://dph.georgia.gov/document/document/tourist-accommodations-rules-and-regulations/download (accessed 2026-11-11)
    39. 39.Texas Legislature. "Health and Safety Code chapter 341, section 341.0315." https://tcss.legis.texas.gov/resources/HS/htm/HS.341.htm (accessed 2026-11-11)
    40. 40.U.S. Census Bureau. "2022 Economic Census, Accommodation and Food Services: Summary Statistics (EC2272BASIC)." https://www2.census.gov/programs-surveys/economic-census/data/2022/sector72/EC2272BASIC.zip (accessed 2026-11-11)
    41. 41.U.S. Census Bureau. "County Business Patterns 2023, U.S. file (cbp23us)." https://www2.census.gov/programs-surveys/cbp/datasets/2023/cbp23us.zip (accessed 2026-11-11)
    42. 42.U.S. Census Bureau. "2022 NAICS Descriptions." https://www.census.gov/naics/2022NAICS/2022_NAICS_Descriptions.xlsx (accessed 2026-11-11)
    43. 43.U.S. Census Bureau. "Nonemployer Statistics 2024, U.S. file (nonemp24us)." https://www2.census.gov/programs-surveys/nonemployer-statistics/datasets/2024/historical-datasets/nonemp24us.zip (accessed 2026-11-11)
    44. 44.Minnesota Office of the Revisor of Statutes. "Minn. Stat. 327.15, License required; renewal; fees." https://www.revisor.mn.gov/statutes/cite/327.15 (accessed 2026-11-11)
    45. 45.Oregon Legislature. "ORS Chapter 446, tourist facilities, ORS 446.310 and 446.320." https://www.oregonlegislature.gov/bills_laws/ors/ors446.html (accessed 2026-11-11)
    46. 46.Virginia Department of Health (Virginia Administrative Code). "12VAC5-450-40, Permits." https://law.lis.virginia.gov/admincode/title12/agency5/chapter450/section40/ (accessed 2026-11-11)
    47. 47.Garfield County, Utah (Utah Public Notice Website). "Garfield County Planning Commission agenda, May 20, 2020." https://www.utah.gov/pmn/sitemap/notice/604879.html (accessed 2026-11-11)
    48. 48.U.S. Environmental Protection Agency (via GovInfo). "40 CFR 141.2, Definitions (revised as of July 1, 2025)." https://www.govinfo.gov/content/pkg/CFR-2025-title40-vol25/xml/CFR-2025-title40-vol25-sec141-2.xml (accessed 2026-11-11)
    49. 49.U.S. Environmental Protection Agency. "Information about Public Water Systems." https://www.epa.gov/dwreginfo/information-about-public-water-systems (accessed 2026-11-11)
    50. 50.U.S. Environmental Protection Agency. "Large-Capacity Septic Systems." https://www.epa.gov/uic/large-capacity-septic-systems (accessed 2026-11-11)
    51. 51.Utah Division of Water Rights. "Utah's Water Right Process (brochure 2a)." https://www.waterrights.utah.gov/wrinfo/Brochures/Brochure%202a.pdf (accessed 2026-11-11)
    52. 52.Minnesota Department of Health (Minnesota Rules). "Minn. R. 4630.0400, Mobile home and recreational camping vehicle spacing." https://www.revisor.mn.gov/rules/4630.0400/ (accessed 2026-11-11)
    53. 53.Minnesota Department of Health (Minnesota Rules). "Minn. R. 4630.0800, Sewage disposal." https://www.revisor.mn.gov/rules/4630.0800/ (accessed 2026-11-11)
    54. 54.Virginia Department of Health (Virginia Administrative Code). "12VAC5-450-100, Sanitary facilities." https://law.lis.virginia.gov/admincode/title12/agency5/chapter450/section100/ (accessed 2026-11-11)
    55. 55.Minnesota Department of Health (Minnesota Rules). "Minn. R. 4630.0900, Toilet, bathing, and laundry facilities." https://www.revisor.mn.gov/rules/4630.0900/ (accessed 2026-11-11)
    56. 56.Minnesota Department of Health (Minnesota Rules). "Minn. R. 4630.1700, Fire protection." https://www.revisor.mn.gov/rules/4630.1700/ (accessed 2026-11-11)
    57. 57.Minnesota Pollution Control Agency (Minnesota Rules). "Minn. R. 7081.0130, Flow and waste concentration determination for other establishments." https://www.revisor.mn.gov/rules/7081.0130/ (accessed 2026-11-12)
    58. 58.Alabama Department of Public Health (Alabama Administrative Code). "Rule 420-3-1, Table 1, Design Flow and Wastewater Concentrations." https://admincode.legislature.state.al.us/api/rule/420-3-1-T1 (accessed 2026-11-11)
    59. 59.New Mexico Environmental Improvement Board (NM State Records Center and Archives). "20.7.3 NMAC, Liquid Waste Disposal and Treatment." https://www.srca.nm.gov/parts/title20/20.007.0003.html (accessed 2026-11-11)
    60. 60.Minnesota Department of Health (Minnesota Rules). "Minn. R. 4725.4450, Water-supply well distances from contamination." https://www.revisor.mn.gov/rules/4725.4450/ (accessed 2026-11-12)
    61. 61.USDA Forest Service. "Wildfire Risk to Communities, data download spreadsheet (updated April 15, 2026)." https://wildfirerisk.org/wp-content/uploads/2026/04/wrc_download_20260415.xlsx (accessed 2026-11-12)
    62. 62.Office of the Law Revision Counsel (via GovInfo). "42 U.S.C. 4012a, Flood insurance purchase and compliance requirements and escrow accounts (2024 edition)." https://www.govinfo.gov/content/pkg/USCODE-2024-title42/html/USCODE-2024-title42-chap50-subchapI-sec4012a.htm (accessed 2026-11-12)
    63. 63.North Carolina General Assembly. "G.S. 99E-30, Definitions (agritourism activity liability)." https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_99E/GS_99E-30.html (accessed 2026-11-12)
    64. 64.North Carolina General Assembly. "G.S. 160D-903, Agricultural uses." https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_160D/GS_160D-903.html (accessed 2026-11-12)
    65. 65.Virginia General Assembly. "Code of Virginia 3.2-6400, Definitions (agritourism)." https://law.lis.virginia.gov/vacode/title3.2/chapter64/section3.2-6400/ (accessed 2026-11-12)
    66. 66.Virginia General Assembly. "Code of Virginia 15.2-2288.6, Agricultural operations; local regulation of certain activities." https://law.lis.virginia.gov/vacode/title15.2/chapter22/section15.2-2288.6/ (accessed 2026-11-12)
    67. 67.Oregon Legislature. "ORS Chapter 320 (2025 Edition), transient lodging taxes, ORS 320.300 to 320.308." https://www.oregonlegislature.gov/bills_laws/ors/ors320.html (accessed 2026-11-11)
    68. 68.Florida Legislature. "The 2026 Florida Statutes, s. 212.03, Transient rentals tax." https://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0200-0299/0212/Sections/0212.03.html (accessed 2026-11-11)
    69. 69.Minnesota Office of the Revisor of Statutes. "Minn. Stat. 297A.61, Definitions (sales and use tax)." https://www.revisor.mn.gov/statutes/cite/297A.61 (accessed 2026-11-11)
    70. 70.Utah Legislature. "Utah Code 59-12-103, Sales and use tax base (effective July 1, 2026)." https://le.utah.gov/xcode/Title59/Chapter12/C59-12-S103_2026050620260701.html (accessed 2026-11-11)
    71. 71.Utah State Tax Commission. "Rates Applied to Certain Transactions, rates in effect as of October 1, 2026." https://files.tax.utah.gov/tax/salestax/rate/26q4simple.pdf (accessed 2026-11-11)
    72. 72.North Carolina General Assembly. "G.S. 105-164.4, Tax imposed on retailers." https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_105/GS_105-164.4.html (accessed 2026-11-11)
    73. 73.North Carolina General Assembly. "G.S. 105-164.4F, Accommodation rentals." https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_105/GS_105-164.4F.html (accessed 2026-11-11)
    74. 74.North Carolina General Assembly. "G.S. 105-164.3, Definitions (sales and use tax)." https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_105/GS_105-164.3.html (accessed 2026-11-11)
    75. 75.Montana Legislature. "Montana Code Annotated 15-65-111, Tax rate (lodging facility use tax)." https://mca.legmt.gov/bills/mca/title_0150/chapter_0650/part_0010/section_0110/0150-0650-0010-0110.html (accessed 2026-11-12)
    76. 76.Montana Legislature. "Montana Code Annotated 15-68-102, Imposition and rate of sales tax and use tax." https://mca.legmt.gov/bills/mca/title_0150/chapter_0680/part_0010/section_0020/0150-0680-0010-0020.html (accessed 2026-11-12)
    77. 77.Idaho Legislature. "Idaho Code 63-3619, Imposition and rate of the sales tax." https://legislature.idaho.gov/statutesrules/idstat/Title63/T63CH36/SECT63-3619/ (accessed 2026-11-12)
    78. 78.Idaho Legislature. "Idaho Code 63-3612, Sale (definition, including campground accommodations)." https://legislature.idaho.gov/statutesrules/idstat/Title63/T63CH36/SECT63-3612/ (accessed 2026-11-12)
    79. 79.Maine Legislature. "Maine Revised Statutes, Title 36, section 1811, Sales tax." https://legislature.maine.gov/statutes/36/title36sec1811.html (accessed 2026-11-12)
    80. 80.Maine Legislature. "Maine Revised Statutes, Title 36, section 1752, Definitions (sales and use tax)." https://legislature.maine.gov/statutes/36/title36sec1752.html (accessed 2026-11-12)
    81. 81.New Hampshire General Court. "RSA 78-A:6, Imposition of Tax (meals and rooms)." https://gc.nh.gov/rsa/html/V/78-A/78-A-6.htm (accessed 2026-11-12)
    82. 82.New Hampshire General Court. "RSA 78-A:3, Definitions (meals and rooms tax)." https://gc.nh.gov/rsa/html/V/78-A/78-A-3.htm (accessed 2026-11-12)
    83. 83.Vermont General Assembly. "32 V.S.A. 9241, Imposition of tax (Vermont Statutes Online)." https://legislature.vermont.gov/statutes/section/32/225/09241 (accessed 2026-11-12)
    84. 84.Vermont General Assembly. "32 V.S.A. 9202, Definitions (meals and rooms tax)." https://legislature.vermont.gov/statutes/section/32/225/09202 (accessed 2026-11-12)
    85. 85.Wyoming Legislature. "2020 Enrolled Act No. 7 (HB0134), statewide lodging tax, amending W.S. 39-15-104." https://wyoleg.gov/2020/Enroll/HB0134.pdf (accessed 2026-11-12)
    86. 86.South Dakota Legislature. "SDCL 10-45D-2, Tax on gross receipts of certain visitor-related businesses." https://sdlegislature.gov/api/Statutes/10-45D-2.html?all=true (accessed 2026-11-12)
    87. 87.Texas Legislature. "Tax Code chapter 156, Hotel Occupancy Tax (sections 156.001 and 156.052)." https://tcss.legis.texas.gov/resources/TX/htm/TX.156.htm (accessed 2026-11-11)
    88. 88.Colorado Department of Revenue. "FYI Sales 11, Lodging Services." https://tax.colorado.gov/sites/default/files/Sales%2011.pdf (accessed 2026-11-11)
    89. 89.Missouri Department of Revenue. "RV Parks and Campgrounds (sales and use tax guidance, revised March 28, 2025)." https://dor.mo.gov/taxation/business/documents/RV-Parks-Campgrounds.pdf (accessed 2026-11-11)
    90. 90.USDA Rural Development (Federal Register, via GovInfo). "OneRD Annual Notice of Guarantee Fee Rates, Periodic Retention Fee Rates, Loan Guarantee Percentage and Fee for Issuance of the Loan Note Guarantee Prior to Construction Completion for Fiscal Year 2026 (FR Doc. 2026-04581, March 9, 2026)." https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm (accessed 2026-11-11)
    91. 91.Board of Governors of the Federal Reserve System. "H.15 Selected Interest Rates, release of November 10, 2026." https://www.federalreserve.gov/releases/h15/ (accessed 2026-11-11)
    92. 92.USDA Rural Development (via GovInfo). "7 CFR 4280.112, Applicant eligibility (REAP grants), revised as of January 1, 2026." https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec4280-112.xml (accessed 2026-11-12)
    93. 93.USDA Rural Development (via GovInfo). "7 CFR 4280.103, Definitions (Rural Energy for America Program), revised as of January 1, 2026." https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec4280-103.xml (accessed 2026-11-12)
    94. 94.USDA Rural Development (via GovInfo). "7 CFR 4280.115, RES and EEI grant funding, revised as of January 1, 2026." https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec4280-115.xml (accessed 2026-11-12)
    95. 95.USDA Rural Development (via GovInfo). "7 CFR 4280.113, Project eligibility (REAP grants), revised as of January 1, 2026." https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec4280-113.xml (accessed 2026-11-12)