    An assisted living feasibility study tells a lender, developer or operator whether a licensed care community can be financed. It counts the households in the market area that are old enough, frail enough and able to pay; surveys every competitor in person; sets rates; builds staffing at local wages; confirms the state license path for assisted living and memory care; and projects occupancy month by month until debt service coverage clears the lender's test. Those tests are specific. HUD's Section 232 program sizes most loans to a minimum debt service coverage ratio of 1.45 and caps a new for-profit assisted living loan at 75 percent of value [12]. SBA's Standard 7(a) program requires coverage of at least 1.15 on historical or projected cash flow [30]. USDA's Community Facilities guarantee will not accept assisted living projections above 90 percent occupancy [21]. A study that cannot show, from verified inputs, how the project reaches those marks is not one a credit officer can use.

    This page covers the demand screens, the competitor survey, a worked fill-up and deficit model, state staffing minimums, licensing and memory care rules across 22 states, Medicaid waivers, the HUD Section 232 programs and each lender's questions. Every figure links to the body that published it; model inputs are labeled as assumptions.

    For the wider senior housing picture, including independent living and continuing care, see the senior housing feasibility study page.

    What does an assisted living feasibility study have to prove?

    It has to prove that the project can carry its debt, under the rules of the capital source in play, with a margin that survives a bad year. Five findings decide it.

    1. Qualified demand: households in the primary market area that pass the age, need and income screens, net of every competing unit.
    2. Labor: staff the project can hire and keep at a cost its rates will cover.
    3. Licensing: a state license that matches the care the operating plan describes.
    4. Fill-up: a lease-up pace that sets the interest reserve, deficit funding and the date coverage first clears the test.
    5. Value: how much of the collateral's worth depends on the operating business.

    Table 1. Financing tests an assisted living study must address

    Capital sourceTestThreshold
    HUD Section 232 (new construction, rehabilitation, 223(f))Minimum debt service coverage1.45 [12]
    HUD Section 232, new assisted living, for-profit borrowerMaximum loan to value75% [12]
    SBA Standard 7(a)Minimum coverage, historical or projected1.15, with 1:1 global coverage [30]
    SBA 7(a) change of ownership, initial acquisitionMinimum coverage1.25 [30]
    USDA Community Facilities guaranteeMaximum occupancy in assisted living projections90% [21]
    USDA Business and Industry guaranteeIndependent feasibility studyLoans above $1,000,000 to a new business [22]

    Source: HUD Handbook 4232.1 [12]; SBA SOP 50 10 8.1 [30]; 7 CFR 5001.304 and 5001.306 [21] [22].

    The study ends in one of three conclusions: feasible; feasible on stated conditions, such as more pre-leasing or a larger deficit reserve; or not feasible as proposed.

    How do assisted living, memory care, independent living and skilled nursing differ?

    They differ in who licenses the building, who pays, how it is staffed and which lenders will finance it. A study that blurs the levels gives the lender the wrong demand pool and the wrong cost base.

    Independent living offers housing and services without licensed personal care. HUD allows it inside a Section 232 project only up to 25 percent of beds [11], and USDA's Business and Industry program excludes housing whose primary purpose is independent living [20]. Assisted living adds help with daily activities, medication and round-the-clock oversight under a state license. HUD's definition requires at least 20 beds for frail elderly residents, meaning people 62 or older who cannot perform at least three activities of daily living, plus three meals a day and the ability to intervene in a crisis on a 24-hour basis [11]. Memory care serves residents living with dementia, usually in a secured unit; most states regulate it as an add-on to the assisted living license. Skilled nursing provides 24-hour nursing care and matters here as competition and as a discharge destination: 15 percent of New Jersey's 2025 assisted living discharges went to a nursing home [34].

    Table 2. How the care levels differ for a lender

    Care levelResidents receiveHow financing programs treat it
    Independent livingHousing and services, no licensed careHUD 232: up to 25% of beds [11]; USDA B&I: excluded as primary purpose [20]
    Assisted livingDaily-activity help, medication, 24-hour oversightHUD 232: 20 beds or more [11]; SBA: eligible when licensed and providing healthcare or medical services [30]; USDA B&I: eligible where constant medical care is provided on site [19]
    Memory careSpecialized dementia care, often securedRead as assisted living; reviewers test dementia staffing and secured-unit approvals
    Skilled nursing24-hour skilled nursingHUD 232: loan to value 80% for-profit, 85% nonprofit [12]
    Board and care homeRoom, board, protective oversightHUD 232: 20 accommodations or more, up to 4 persons each [11]

    Source: HUD Handbook 4232.1 [11] [12]; SBA SOP 50 10 8.1 [30]; 7 CFR 5001.105 and 5001.118 [19] [20].

    Assisted living is the core product. One public seniors housing owner reports 72,843 assisted living units, 23,424 memory care units and 49,357 independent living units in its operating portfolio at the third quarter of 2026 [35]. Continuing care campuses, where entry fees and contracts add another layer, belong on the senior housing feasibility study page.

    The service menu sets revenue beyond base rent, and New Jersey's 2025 survey shows how wide it runs.

    Table 3. Optional services offered by New Jersey assisted living facilities, 2025

    ServiceShare of facilities
    Any special service95% [34]
    Respite stays82% [34]
    Alzheimer's care81% [34]
    Hospice78% [34]
    Rehabilitation therapies (physical, occupational, speech)64% [34]
    Behavior management9% [34]
    Intravenous therapy1% [34]

    Source: New Jersey Department of Health, Assisted Living Resident Profile Survey Results for 2025 [34].

    A study prices each service the subject will actually offer, confirms the license allows it, and staffs it.

    How does a lender read an assisted living study?

    A credit officer reads the study for one thing: whether the numbers that size the loan rest on evidence the officer can check. HUD's Section 232 handbook, posted as Revision 1 effective January 19, 2017 [10], is the most detailed public statement of what a reviewer expects. Its market study is written by the same person who prepares the appraisal [13], and it must:

    • estimate unmet demand in units or beds and forecast it five years ahead [13];
    • base assisted living and memory care demand on residents who meet the economic and demographic criteria and need the care offered [13];
    • show demand by payor source [13];
    • tie the absorption estimate to the demand analysis, not only to how comparable buildings filled [13];
    • count supply without discounting for vacancy beyond basic frictional vacancy [13].

    SBA reads the same file as business credit. For a start-up or construction project, Standard 7(a) projections must reach 1.15 coverage within two years of funding, or of the end of construction [30]. SBA's regulation says the agency "may require" a feasibility study [25], and the SOP's 504 chapter lists triggers that include market saturation and a highly specialized project property [30]. USDA requires a financial feasibility report from a qualified firm or individual on every Community Facilities guarantee [21].

    All three examine the operator. HUD generally expects principals with at least three years of experience operating multiple projects with the bed types proposed [11]. For what makes a study usable in any credit file, see what a bankable feasibility study is.

    What does each lender ask, by financing path?

    Each program's own rules produce a short list of questions, and the study answers them in order.

    Table 4. Questions a reviewer asks on each financing path

    Financing pathQuestions the study must answerRule behind the question
    HUD 232 new constructionHave the operator's principals run several communities of this type for 3 years, with fill pace, occupancy and margins shown? Does the deficit analysis run to stabilization? Do licensed beds at least equal the beds the loan is sized on?[11] [54] [55]
    HUD 232/223(f)Has the project been complete for 3 years? Does the refinance pay out no cash?[11]
    SBA 7(a)Is the business licensed and providing healthcare? Does the owner keep meaningful oversight of any manager? Do projections reach 1.15 within 2 years? Is 10% start-up equity in?[30]
    SBA 504Is the 15% or 20% contribution met? Is the market saturated, or the project large for its community? How do ratios compare with industry averages?[26] [30]
    USDA Community FacilitiesIs the applicant eligible and rural? Do projections stay at or below 90% occupancy?[15] [16] [21]
    USDA Business and IndustryIs constant medical care on site? Is the loan above $1,000,000 to a new business?[19] [22]
    Conventional construction loanWill the stabilized project meet the take-out lender's tests when the construction loan matures?Lender's credit policy

    Source: HUD Handbook 4232.1 [11] [54] [55]; SBA SOP 50 10 8.1 [30]; 13 CFR 120.910 [26]; 7 CFR Parts 3570 and 5001 [15] [16] [19] [21] [22].

    Two questions need the most care. The first is management. SBA treats a business whose management company has sole discretion over operations as an ineligible passive business [30]. The owner stays eligible only with meaningful oversight: approving the annual budget, approving large capital or operating spending, controlling the bank accounts and overseeing the staff, who must be the applicant's own employees [30]. HUD runs the same test from the other side: it must approve the operator and any management agent before they take part, and the licensed operator signs HUD's regulatory agreement whether its contract is a lease, an operating agreement or a management agreement [55]. The second is equity. A 7(a) start-up, meaning a business operating one year or less, needs an equity injection of at least 10 percent of project cost [30]; a 504 project in a special purpose building needs 15 or 20 percent [26].

    How is age- and income-qualified demand counted?

    Demand starts with age, narrows with need and income, and ends with the share the subject can capture against competitors. The Census Bureau estimates 27.9 million people aged 75 and older on July 1, 2025, up 23.0 percent since 2020 [1]. The 85-and-older group is projected to reach 13.7 million by 2040 [3].

    Table 5. U.S. population aged 75 and older

    Age groupJuly 1, 2020July 1, 2025Change2030 projected2040 projected
    75 to 799,997,94512,959,59129.6%14,401,00016,363,000
    80 to 846,391,3067,928,31024.0%10,234,00013,114,000
    85 and older6,317,8827,041,03611.4%8,560,00013,676,000
    75 and older22,707,13327,928,93723.0%33,195,00043,153,000
    85+ share of 75+27.8%25.2%n/a25.8%31.7%

    Source: U.S. Census Bureau, Vintage 2025 estimates [1]; 2023 National Population Projections, Tables 2 and 3 [3] [4]. Totals, changes and shares are computed. Projections are a separate series from the estimates.

    Residents are old. New Jersey's 2025 licensing survey reports a mean in-house age of 83, with 40 percent of residents in their 80s and 32 percent in their 90s [34]. Studies therefore screen on 75 and older and run a second pass on 80 and older for memory care. The same survey finds that most residents arrive from home, with a subacute unit the next most common source [34], so the referral network the study maps runs through families first and post-acute discharge planners second.

    Income narrows the pool sharply, because assisted living is mostly private pay. The 2026 Current Population Survey counts 18.5 million households headed by someone 75 or older, with a median 2025 income of $50,880 [5].

    Table 6. Income and wealth, householder aged 75 or older

    MeasureValue
    Households, March 202618.5 million [5]
    Median household income, 2025$50,880 [5]
    Mean household income, 2025$78,940 [5]
    Share with income of $50,000 or more50.7% [5]
    Share with income of $75,000 or more34.3% [5]
    Share with income of $100,000 or more23.4% [5]
    Median net worth, 2023$347,300 [6]
    Median net worth excluding home equity, 2023$96,760 [6]
    Median home equity, owners, 2023$260,000 [6]
    Share holding home equity, 202373.9% [6]

    Source: U.S. Census Bureau, CPS ASEC table HINC-02 [5]; SIPP wealth tables, 2023 [6]. Income shares are computed from the published bands.

    Income alone undercounts demand. The median 75-plus household's net worth is about three and a half times larger with the home than without it [6], and many residents pay with house proceeds. The study runs an asset screen beside the income screen and states the home value and drawdown period it assumes.

    Table 7. Population aged 75 and older, largest states, July 1, 2025

    StateAged 75+Aged 85+75+ growth since 2020
    California3,031,385809,99222.5%
    Florida2,484,675633,77925.0%
    Texas1,938,615461,22227.0%
    New York1,707,429478,14220.4%
    Pennsylvania1,220,838327,49517.1%
    Illinois1,023,833275,74118.6%
    Ohio1,019,613259,04918.0%
    North Carolina910,753210,99427.9%
    Michigan870,581216,28919.5%
    Georgia789,464179,95030.2%
    New Jersey767,236206,23019.9%
    Arizona717,221167,46030.0%
    Virginia706,606173,07825.4%
    Washington629,096150,66728.3%
    Massachusetts628,062165,59123.1%
    Indiana539,658134,20419.5%
    Missouri525,265133,25417.9%
    Maryland494,794126,25524.3%

    Source: U.S. Census Bureau, Vintage 2025 state civilian population by single year of age [2]. The 75+ counts and growth are computed; 85+ is the published top-coded row.

    A live study cuts the same data to the primary market area and projects it five years out [13]. For a worked case, see the income-qualified demand case study.

    The penetration method, step by step

    Penetration asks what share of qualified households would have to live in assisted living for every competing unit, plus the subject, to be full.

    Required penetration = ((C + P + S) × M) ÷ (H × Q)

    C is competitive units in the market area, P is pipeline units, S is subject units, M is the share of demand from inside the market area, H is market area households headed by someone 75 or older, and Q is the share passing the income (and asset) screen. HUD notes that 60 to 80 percent of senior housing demand typically comes from the primary market area [13].

    Table 8. Worked penetration example, 90-unit assisted living project

    LineInput or resultValueStatus
    HHouseholds, householder 75+8,000Assumption
    QShare with income of $75,000 or more34.3%Verified national ratio [5]; market area ratio in a live study
    H × QIncome-qualified households2,744Model output
    C + P + SCompetitive 310, pipeline 60, subject 90460Assumptions
    MShare of demand from inside the market area70%Assumption within HUD's range [13]
    ResultRequired penetration11.7%Model output: (460 × 0.70) ÷ 2,744
    SensitivityNo outside demand (M = 100%)16.8%Model output
    SensitivityIncome screen at $50,000 (Q = 50.7%) [5]7.9%Model output
    SensitivityIncome screen at $100,000 (Q = 23.4%) [5]17.2%Model output

    Source: Q values from CPS ASEC HINC-02 [5]; M range from HUD Handbook 4232.1 [13]. Other inputs are labeled assumptions; results are model outputs, not market facts.

    The income screen moves the answer most: the same building needs 7.9 percent penetration at a $50,000 screen and 17.2 percent at $100,000. The study justifies its screen from the rate card and asset drawdown, compares the result with rates it has measured in comparable stabilized markets, and runs memory care as a separate calculation with its own age band, need rate and competitors.

    How is the competitive supply survey done?

    It is done in the field, competitor by competitor, not from a directory. HUD's handbook sets out what a reviewer expects for each primary competitor [13], and it works as a checklist for any lender.

    Table 9. What the survey records for each primary competitor

    ItemWhy it matters
    Units and beds, year built, locationDefines the competitive set [13]
    Operated beds versus licensed bedsMany facilities do not operate all licensed beds [13]
    Private pay rates by unit type and care levelTests the subject's rate card [13]
    Census by payor sourcePrivate pay versus Medicaid exposure [13]
    Occupancy, point in time or annual averageKeeps one good month from reading as a trend [13]
    Concessions, waiting lists, recent absorption including pre-salesReal pricing power and lease-up pace [13]
    Condition and amenities, with photographsObsolete product the subject can take share from [13]
    Pipeline projects and likelihood of completionFuture supply in the penetration math [13]
    Interview with the administrator or marketing directorConfirms the data and gives a source [13]

    Source: HUD Handbook 4232.1, Section II, Chapter 5 [13].

    The survey runs in three passes: desk research in licensing directories, inspection records and planning files; site visits to walk and photograph each competitor; and pricing calls and director interviews in the same week, so rates and occupancy line up. For memory care it records which competitors run secured units, their bed counts and whether care is priced in levels or all-inclusive.

    State counts help but do not settle supply. Pennsylvania's licensing bureau licenses personal care homes and assisted living residences, manages licensing for more than 1,000 congregate care settings and serves about 40,000 adults [37]. Georgia's personal care home program covers 2,910 facilities across several license types [41]. Those totals mix products that will never compete with the subject, so the field survey sorts competitive from non-competitive beds and explains each exclusion [13].

    Pipeline evidence comes from permits, license applications and, where a state controls supply, its need process. In New York, from April 1, 2025, additional assisted living program beds are approved case by case on a finding of public need that may weigh regional occupancy and service to Medicaid recipients [82]; those decisions belong in the supply count.

    What occupancy and fill-up can the study defend?

    It can defend the occupancy that comparable buildings actually show, inside the program caps, and a fill-up pace tied to its own demand count. Stabilized occupancy should rest on what owners report about their own buildings.

    Table 10. One public owner's reported seniors housing operating results, own portfolio

    Measure3Q 20253Q 2026
    Same-store occupancy (1,052 properties)87.0%90.2%
    Same-store revenue per occupied unit per month$5,759$6,066
    Same-store expense per occupied unit per month$4,116$4,147
    Same-store NOI margin28.6%31.7%
    Non-same-store occupancy83.3%84.3%
    Total U.S. operating occupancy86.6%89.1%

    Source: Welltower Inc., third quarter 2026 earnings release and supplement, figures for its own portfolio [35].

    That filer treats an operating property as stable at the earliest of 90 percent occupancy, net operating income at its target, or 12 months past its planned stabilization date [35]. Its numbers describe a large, mostly stabilized, private-pay portfolio: a ceiling for a new building, not a forecast. Whole markets can sit far lower. New Jersey's Department of Health calculates 2025 assisted living occupancy of 66.40 percent, with a five-year average of 62.87 percent [34]. The survey method differs from an owner's operating occupancy, but the gap warns against assuming any market carries a new building to 90 percent.

    Demand can grow while occupancy stays low. New Jersey served 26,691 assisted living residents in 2025, 548 more than in 2024, even though 7 fewer facilities reported [34].

    Table 11. Assisted living residents served in New Jersey, selected years

    YearResidents served
    201220,246
    201522,407
    201924,469
    202022,058
    202122,063
    202223,642
    202325,199
    202426,143
    202526,691

    Source: New Jersey Department of Health, Assisted Living Resident Profile Survey Results for 2025 [34].

    The count fell in 2020, did not pass its 2019 level until 2023 and has risen every year since 2020. A study reads the series, not one strong year.

    Turnover matters after lease-up. New Jersey residents stay a mean of 28 months [34], and 53 percent of 2025 discharges were deaths, with 12 percent going home and 8 percent to another assisted living community [34]. At that stay, a building holding 81 occupied units needs about 35 move-ins a year to stay level (81 × 12 ÷ 28, a model output).

    Table 12. Fill-up scenarios for a 90-unit building (model output)

    CaseLeased at openingNet move-ins per monthMonths to 81 units (90%)Inside SBA's two-year window?
    Upside20513Yes
    Base20416Yes
    Downside20321Yes
    Severe20231No
    Severe, stronger pre-leasing40221Yes

    Source: Model output from assumed inputs. The 90 percent target follows the USDA cap [21] and one owner's stabilization point [35]; the window follows SBA SOP 50 10 8.1 [30]. Coverage may lag occupancy.

    Size the interest reserve and operating deficit funding to the downside case. Pre-leasing is the cheapest protection: in this model, doubling units leased at opening keeps the severe case inside SBA's window.

    What does a worked absorption and stabilization model show?

    It shows how much cash the project burns before it covers its debt, and when coverage first clears the lender's test. HUD's initial operating deficit rules give the most specific public method. HUD requires the analysis whenever new units are added or the occupancy the loan assumes is not yet being achieved, and it requires an escrow for any period of deficit operations [11]. The operating deficit is the total of all cumulative monthly losses until the project reaches breakeven and produces consistently positive cash flow [54].

    Table 13. HUD's operating deficit rules and how the model applies them

    HUD rule [54]How the model applies it
    Net monthly absorption, counting move-ins and move-outsNet 4 units a month
    Pre-leases front-load move-ins but are not double counted20 pre-leased units in month 1
    Move-in receipts lag two monthsCash revenue billed on units occupied two months earlier
    Marketing at 200% of normal until stabilization$16,000 a month, then $8,000
    A year of insurance paid at the end of construction$72,000 in month 3, then $6,000 a month
    Variable expenses have floorsNever below 40% of the stabilized level
    Interval 1 of 2 months without debt service; Interval 2 of at most 2 months of interest; amortization within 4 months of completionNo debt service in months 1 to 2, interest only in months 3 to 4
    Constant dollars, the lender's expenses, cash flows run to stabilizationNo inflation; 36 months modeled
    Unusually long absorption puts viability in questionSevere cases tested

    Source: HUD Handbook 4232.1, Section II, Appendix 2.1 [54] and Chapter 2 [11].

    The inputs below are illustrative assumptions, not market facts; a live study replaces each with surveyed rates, local wages and the lender's terms.

    Table 14. Model inputs for a 90-unit assisted living and memory care community (assumptions)

    InputValueBasis
    Units and stabilized target90 units; 81 occupied (90%)At the USDA projection cap [21]
    Pre-leased units; net move-ins20; 4 a monthBase case in Table 12
    Revenue per occupied unit per month$6,000 blendedOne public owner reported $6,066 [35]
    Fixed operating costs per month$179,000 plus $6,000 insuranceAssumption
    Variable costs per occupied unit per month$1,750, with a 40% floorAssumption
    Management fee5% of collections, minimum $10,000 a monthAssumption
    Marketing per month$8,000, doubled until stabilizationDoubling per HUD [54]
    Replacement reserve per month$2,250 from month 5Not collected in Intervals 1 and 2 [54]
    Interest rate with mortgage insurance; amortization6.75%; 40 years40 years is the maximum [11]
    Loan amount$14.25 millionModel output: stabilized NOI ÷ 1.45 [12] at the loan constant

    Source: HUD Handbook 4232.1 [11] [12] [54]; 7 CFR 5001.304 [21]; Welltower Inc. third quarter 2026 supplement [35]. Values not marked as model outputs are assumptions.

    Table 15. Monthly results, base case (model output)

    MonthOccupied units (occupancy)Cash revenueOperating costsNOI after reserveDebt serviceCumulative cash shortfall
    120 (22%)$0$261,700-$261,700$0-$261,700
    224 (27%)$0$261,700-$261,700$0-$523,400
    328 (31%)$120,000$333,700-$213,700$80,176-$817,276
    432 (36%)$144,000$267,700-$123,700$80,176-$1,021,153
    640 (44%)$192,000$281,000-$91,250$86,000-$1,392,653
    952 (58%)$264,000$305,200-$43,450$86,000-$1,828,403
    1264 (71%)$336,000$329,800$3,950$86,000-$2,121,953
    1576 (84%)$408,000$354,400$51,350$86,000-$2,273,303
    1680 (89%)$432,000$362,600$67,150$86,000-$2,292,153
    1881 (90%)$480,000$358,750$119,000$86,000-$2,256,953
    2481 (90%)$486,000$359,050$124,700$86,000-$2,024,753

    Source: Model output from the assumptions in Table 14, structured to HUD Handbook 4232.1, Appendix 2.1 [54]. Occupied units are counted at the start of each month; the building reaches 81 units at the end of month 16.

    Three findings come out of the model. First, NOI turns positive in month 12, but cash flow after debt service stays negative until month 17, so the cumulative shortfall peaks at about $2.29 million at month 16, about 16 percent of the loan. That is what a deficit escrow or sponsor guarantee must cover; HUD's 4 percent working capital escrow on a new construction loan with insured advances, half of it contingency [11], is a separate deposit (about $570,000 here, a model output). Second, the receipt lag means two months of costs with no cash in. Third, a project at 90 percent occupancy by month 16 can still miss a trailing-year coverage test in year 2.

    Table 16. Annual coverage and breakeven, base case (model output)

    MeasureYear 1Year 2Year 3
    Average occupancy46.7%87.4%90.0%
    NOI after reserve-$1,273,600$1,129,200$1,496,400
    Debt service$848,353$1,032,000$1,032,000
    Debt service coverageNegative1.091.45
    Run-rate coverage at year end0.051.451.45

    Source: Model output from Table 14. Year 1 debt service is lower because months 1 to 2 carry none and months 3 to 4 carry interest only [54]. Run-rate coverage annualizes the last month of each year.

    The gap between 1.09 for year 2 as a whole and 1.45 on the month-24 run rate is the conversation a lender will have. A reviewer applying a two-year projection test [30] needs to know which basis the study uses, so the study shows both. HUD defines break-even occupancy as 1.0 coverage from all project income for six consecutive months, and releases the working capital escrow only after that test is met and at least 12 months after final closing [11]. In the model, the stabilized cost structure covers debt service at 79.1 percent occupancy and operating costs with the reserve at 54.9 percent (model outputs). HUD also allows reasonable pre-opening management fees as a mortgageable cost where there is no identity of interest [11].

    Which sensitivity tests and breakeven checks does a lender expect?

    A lender expects each input that sizes the loan to be stressed on its own, with the loan held constant, so the reviewer can see which risk breaks coverage first.

    Table 17. Sensitivity of the base case, loan held at $14.25 million (model output)

    CaseMonths to target occupancyPeak cumulative shortfallStabilized coverageYear 2 coverageBreakeven occupancy for debt service
    Base16$2,292,0001.451.0979.1%
    Slower fill, 3 net move-ins a month21$2,770,0001.450.6079.1%
    Severe fill, 2 net move-ins a month31$3,724,0001.45Negative79.1%
    Severe fill with 40 units pre-leased21$1,883,0001.450.8479.1%
    Revenue per unit 5% lower16$2,497,0001.180.8485.3%
    Operating costs 10% higher16$2,769,0001.070.7288.2%
    Stabilized occupancy 85% (77 units)15$2,278,0001.271.0179.1%
    Interest rate 1 point higher16$2,449,0001.290.9882.1%

    Source: Model output from the assumptions in Table 14, with one input changed per row. Coverage tests are from HUD Handbook 4232.1 [12] and SBA SOP 50 10 8.1 [30].

    Fill pace drives the deficit; rate and cost drive stabilized coverage. A 10 percent cost overrun takes the project from 1.45 to 1.07, below SBA's 1.15, while a fill pace half as fast leaves stabilized coverage untouched but adds about $1.43 million of deficit funding. Pre-leasing 40 units instead of 20 recovers most of the severe case's cash. The study states breakeven occupancy so a lender can compare it with the market's own: here 79.1 percent against New Jersey's calculated 66.40 percent [34], a margin that would fail in that market.

    What do staffing and labor cost?

    Labor is the largest expense in assisted living and the one most often understated. The same public owner reports third quarter 2026 same-store compensation of $767.8 million against $1.30 billion of operating expenses [35]: 58.9 percent of expenses and 40.3 percent of revenue (computed). Census County Business Patterns covers employer establishments in assisted living for the elderly (NAICS 623312); employment is the mid-March count and payroll is reported in thousands of dollars [9].

    Table 18. Assisted living and continuing care employers, United States, 2023

    MeasureAssisted living (623312)Continuing care communities (623311)
    Establishments20,8845,639
    Paid employees, mid-March508,230455,640
    Annual payroll$17.72 billion$17.61 billion
    Payroll per employee (computed)$34,874$38,641
    Establishments with fewer than 5 employees6,962n/a
    Nonprofit establishments / employees1,801 / 49,242n/a

    Source: U.S. Census Bureau, County Business Patterns 2023 [7]; field definitions [9]. Payroll per employee counts part-time staff as whole employees, so it is not a full-time wage.

    Table 19. Assisted living payroll and staffing intensity by state, 2023

    StateEmployees, mid-MarchPayroll per employeeEmployees per 1,000 residents 75+
    California62,325$40,20620.6
    Florida35,181$33,09514.2
    Texas29,804$30,99815.4
    New York25,355$38,21014.8
    Pennsylvania21,243$33,94417.4
    Illinois16,715$35,53216.3
    Ohio12,930$33,06312.7
    North Carolina18,520$30,89220.3
    Michigan20,091$31,65123.1
    Georgia14,688$31,87718.6
    New Jersey10,210$43,80513.3
    Arizona13,768$36,88919.2
    Virginia14,094$35,76419.9
    Washington21,682$40,02934.5
    Massachusetts12,328$38,73819.6
    United States508,230$34,87418.2

    Source: U.S. Census Bureau, County Business Patterns 2023 [7] [8]; population 75+ from Vintage 2025 estimates [1] [2]. Payroll per employee and ratios are computed; ratios mix 2023 jobs with 2025 population, and states classify residential care differently.

    Among these states, payroll per employee runs from $30,892 in North Carolina to $43,805 in New Jersey [8], a gap of more than 40 percent. A national staffing budget copied into a high-wage state overstates margin from month one. The plan is built position by position and shift by shift from the operator's care model and state staffing rules, then priced at local wages with taxes and benefits. HUD's file asks for exactly that: a list of every position paid from the operating account, with job titles and approximate pay including hourly rates, and a judgment on whether staffing is reasonable for resident acuity, scale and state requirements [55]. Acuity drives the hours: in New Jersey, 65 percent of in-house residents needed help with four or more activities of daily living, 73 percent needed total help with medication, and facilities averaged 55 full-time equivalents [34]. See the labor, staffing and margin case study.

    Agency labor is its own line. Tennessee's Comptroller surveyed 297 assisted care living facilities; of the 119 that responded, 45 percent contracted with staffing agencies and 60 percent reported spending on temporary staff, against 64 percent of responding nursing facilities using agencies [79]. A study states the agency share it assumes during lease-up and after stabilization.

    State rules set the floor under the staffing budget. Where a state publishes a ratio, it turns directly into minimum hours.

    Table 20. State staffing rules that set the minimum labor budget

    StateRuleEffect on the budget
    Mississippi1 attendant per 15 or fewer residents by day, 1 per 25 overnight; a licensed nurse on site 8 hours a day outside the ratio [61]At least 1.28 attendant hours per resident day (computed) plus a daily nurse shift
    Mississippi, Alzheimer's unit3.0 nursing hours per resident per 24 hours; an RN or LPN on every shift [62]A nursing-heavy wing
    NevadaA resident whose dementia may make them a danger needs a secure unit or a facility with 1 staff member per 6 residents, or Alzheimer's licensing [64]Ratio or design decides admissions
    New Mexico1 trained staff member awake in the secured environment at all times [66]A dedicated memory care post
    OklahomaStaff awake 24 hours a day; 2 awake on all shifts where a unit limits outside access, 1 inside it [69]Two-post night shift
    KentuckyOnly dementia-trained staff on a secured unit; manager trains 10 hours a year [57]Training and float limits
    IllinoisStaff numbers set by rule; dementia training for the director and direct care staff [73]Training budget per hire
    MissouriResidents who cannot evacuate with minimal help only with evacuation staffing and plans [45]Night staffing tied to mobility
    New Jersey82% of facilities run a certified medication aide program [34]Medication passes delegated by nurses

    Source: state regulations, statutes and agency publications as cited. The Mississippi hours are 12 ÷ 15 plus 12 ÷ 25.

    Which state license does the project need?

    The project needs the license category that matches the care in its operating plan, and most states attach memory care rules to that base license. States use different names for the same product. Table 21 is confirmed from the agency's own page where it could be retrieved, and otherwise from the state statute.

    Table 21. Assisted living and memory care license categories, largest states

    StateLicensing agencyAssisted living categoryMemory care designationConfirmed from
    CaliforniaDept. of Social Services, Community Care LicensingResidential Care Facility for the ElderlyDementia standards within RCFE rulesAgency [36]
    FloridaAgency for Health Care AdministrationAssisted living facility: standard, extended congregate care, limited nursing, limited mental healthDisclosure if claiming Alzheimer's careStatute [48] [49] [50]
    New YorkDept. of HealthAssisted living residence (5 or more adults); enhanced certificateSpecial needs certification and planStatute [51] [52]
    PennsylvaniaDept. of Human Services, Human Services LicensingPersonal care home; assisted living residence, with or without a special care unitSpecial care unit named in the application scheduleAgency [37] [76]
    IllinoisDept. of Public Health, Division of Assisted LivingAssisted living establishment; shared housing establishmentAlzheimer and dementia programs under 210 ILCS 9/150Agency and statute [38] [73]
    OhioDept. of Health; Dept. of Aging certifies waiver providersResidential care facilityNot named on page retrievedAgency [33]
    North CarolinaDept. of Health and Human Services, Health Service RegulationAdult care home (includes assisted living)Special care unit license; locked and secureAgency and statute [39] [40]
    GeorgiaDept. of Community Health, Healthcare Facility RegulationAssisted living community (25 or more residents)Not named on page retrievedAgency [41]
    New JerseyDept. of Health, Certificate of Need and LicensingAssisted living residence; comprehensive personal care home; assisted living programAlzheimer's care reported as a special service (81% of facilities)Agency [34]
    ArizonaDept. of Health Services, Licensing ServicesAssisted living center (11+); assisted living home (10 or fewer)Directed care servicesAgency [42]
    VirginiaDept. of Social ServicesAssisted living facility (4 or more adults)Not named on page retrievedAgency [43]
    WashingtonDept. of Social and Health Services, Residential Care ServicesAssisted living facility (7 or more residents)Secure units, specialized dementia careAgency [44]
    MassachusettsExecutive Office of Aging and IndependenceAssisted living residence (certified, 3 or more adults)Not named in section retrievedStatute [53]
    MissouriDept. of Health and Senior ServicesResidential care facility (3 or more residents); assisted living facilityAlzheimer's special care disclosureAgency and statute [45] [75]
    MarylandDept. of Health, Office of Health Care QualityAssisted living programNot named on page retrievedAgency [46]
    IndianaDept. of HealthResidential care facility (licensed assisted living)Alzheimer's and dementia special care unitAgency [47]

    Source: state agency pages and statutes as cited, retrieved November 11, 2026. Texas and Michigan, also among the 15 largest states by population 75+ [2], are omitted because neither agency nor statute text could be retrieved; a study there confirms the category with the agency.

    Thresholds differ: Washington licenses from seven residents [44], New York from five [51], Virginia from four adults [43], Massachusetts and Missouri from three [53] [45], and Georgia reserves the assisted living community name for 25 or more [41]. Florida layers acuity licenses onto the standard license [49], New York allows an enhanced certificate for the whole building or any number of beds [52], and Arizona sorts services into supervisory, personal and directed care [42]. New Jersey requires facilities licensed on or after August 31, 2001 to reserve 10 percent of beds for Medicaid-eligible residents [34]. Maryland revised its rules effective April 28, 2025 [46]. HUD treats the license as collateral: licenses are pledged as security for the loan [11].

    Table 22 adds six more states from their current rules, with supply measures computed as in Table 19.

    Table 22. Licensure and supply in six more states

    StateLicensing bodyCategory and size thresholdMemory care designationAged 75+, 2025Establishments, 2023Employees per 1,000 aged 75+
    KentuckyCabinet for Health and Family Services [57]Assisted living community (ALC) or ALC with basic health services [57]ALC-DC license for a secured dementia unit [57]361,82514712.6
    LouisianaDepartment of Health [58]Adult residential care provider, 2 or more unrelated adults, four modules [58]Alzheimer's special care disclosure [60]358,76512710.9
    MississippiState Department of Health [61]Personal care home, assisted living [61] [63]Alzheimer's/dementia unit designation printed on the license [62]238,38711112.2
    NevadaHealth Care Purchasing and Compliance Division [64]Residential facility for groups with an assisted living endorsement [64] [65]Separate licensing rules for Alzheimer's and severe dementia care [64]252,93419511.9
    New MexicoHealth Care Authority [66]Assisted living facility, 2 or more adults [66]Memory care unit in a secured environment [66]192,33110614.3
    OklahomaState Department of Health [69] [70]Assisted living center, 2 or more persons [69]Specialized unit named in the license application; disclosure form [69] [70]313,22610511.3
    United States27,928,93720,88418.2

    Source: state regulations, statutes and agency pages as cited; U.S. Census Bureau, County Business Patterns 2023 [7] [8] and Vintage 2025 civilian population [1] [2]. Population sums and ratios are computed.

    All six run below the national 18.2 employees per 1,000 residents aged 75 and older. Nevada's 75-plus population grew 29.9 percent from 2020 to 2025 (computed from [2]), and it has one establishment for about every 1,297 residents aged 75 and older, against about 2,983 in Oklahoma (computed). Low density can mean unmet demand or a market that prefers home care; the field survey and penetration test decide which. Nevada also bars a facility from claiming to offer assisted living without the endorsement on its license [65].

    What approvals and timing does licensing add?

    Licensing adds lead time, conditions and sometimes a need test, and each one belongs on the project schedule before the lender sets a closing date. SBA lenders must consider the terms of the license under which the business will operate when they decide eligibility [30], and HUD requires licensed beds to be at least equal to the beds the loan is sized on [11].

    Table 23. Approval rules that change the schedule

    State or programRuleEffect on timing
    HUD Section 232Copy of any state certificate of need for assisted living to HUD; licensed beds at least equal to the beds the loan is sized on [11]Approvals precede the firm application
    KentuckyExempt from certificate of need; license application at least 60 days before opening [57]Two-month lead time
    OklahomaApplication at least 30 days before operations; initial license lasts 180 days, renewals 3 years; need review covers nursing and specialized facilities [69] [70]A provisional first six months
    New MexicoLicense before accepting residents; renewal within 30 business days before expiry [66]No move-ins before licensure
    MississippiLicenses expire on March 31 after issuance [61]A short first license year
    MassachusettsTwo-year certification, renewal at least 30 days ahead; operating plan with units, base fee per unit and staff; outside the need statute [80] [81]Certification is the gate
    New YorkAdded assisted living program beds approved case by case on public need from April 1, 2025 [82]Need finding for program beds
    LouisianaLevel 4 licensing moratorium to July 1, 2017, except need approvals by April 25, 2012; assets of the lesser of $100,000 or three months of operation [58] [59]Liquidity proof at licensing
    PennsylvaniaForm HS 633 with the final occupancy permit where required [76]Occupancy permit before licensure
    WashingtonInspections at most 18 months apart [44]Survey history starts early

    Source: HUD Handbook 4232.1 [11]; state regulations, statutes and agency pages as cited.

    Where a state has no agency empowered to issue a certificate of need, HUD lets the state conduct or commission an independent study of need and feasibility, which must estimate absorption of the project's beds by month and describe the payment sources of the subject and its competitors [11]. That is the same work a lender-grade feasibility study does.

    How do memory care design and licensing rules differ by state?

    Memory care changes the building, the staffing, the license and the demand count, so the study treats it as its own product. The license step is usually an add-on triggered by how the community markets itself.

    Table 24. Memory care license rules a study should cite

    StateRuleEffect on the project
    North CarolinaA home holding itself out as having a special care unit must be licensed as one [40]; units are locked and secure [39]Licensing step and secured design
    New YorkResidences marketing dementia care submit a special needs plan on staffing, training and environment [52]; no marketing of specialized services before the certificate is approved [52]Plan and approval before marketing
    FloridaFacilities claiming special Alzheimer's care disclose what distinguishes it [50]Claims must match operations
    IndianaDisclosure form and a director with 1 year of dementia experience and 12 hours of dementia training [47]Director hire in pre-opening budget
    ArizonaDirected care for residents who cannot recognize danger or make basic care decisions [42]Service authorization governs admissions
    WashingtonSecure units must give access to secure outdoor space [44]Protected outdoor area in the site plan
    KentuckyA secured dementia unit on a campus with another assisted living level gets a separate license [57]Two licenses on one campus
    MississippiUnit set up by a licensed nursing home or personal care home; only residents with a primary dementia diagnosis [62]Narrower admissions
    New MexicoRN or physician extender assessment within 15 days before admission, re-evaluation every six months, review of less restrictive options [66]Clinical intake and slower admissions
    IllinoisValidated dementia assessment before acceptance, annually and on a change in condition [73]Assessment cost and discharge risk

    Source: state statutes, regulations and agency documents as cited.

    Design follows the rules: controlled egress, protected outdoor space, wayfinding and more common area. California folded its dementia standards into its general elderly residential care rules in a package approved in October 2024 [36]. A few states write the dimensions down.

    Table 25. Design rules that shape a memory care wing

    State or programDesign rule
    Mississippi, Alzheimer's unitMultipurpose room of 40 square feet per resident, never under 320; secure exterior path at least 4 feet wide [62]
    Mississippi, personal care homeAt least 80 square feet of usable floor area per bed [61]
    KentuckyDementia units built after July 14, 2022 offer secured outdoor space; building waivers may be requested [57]
    New MexicoSecured environment: doors and fences restrict access; secure outdoor area for year-round use [66]
    WashingtonSecure units give access to secure outdoor space [44]
    NevadaResidents live in their own units with toilet facilities, with exceptions [65]
    HUD Section 232At least one full bathroom for every four residents [11]
    Federal waiver settings ruleUnit doors lockable by the resident; restrictions justified in the person-centered plan [31]
    MassachusettsCertified residences are residential uses under the state building code [81]

    Source: state regulations and statutes as cited; HUD Handbook 4232.1 [11]; 42 CFR 441.301 [31].

    Medicaid adds a tension. In provider-controlled waiver settings, units must have entrance doors lockable by the resident [31], and any restriction must rest on a specific assessed need justified in the person-centered service plan [31]. A wing expecting waiver residents shows how it meets both the secured-unit rules and the federal settings rule.

    Disclosure rules fix what the community may promise and charge. Several states require a written statement of how the dementia program differs.

    Table 26. Alzheimer's and assisted living disclosure rules

    StateWho receives it and whenWhat it must cover
    MissouriLicensing department; copy to the resident and next of kin at admission; verified at renewal [75]9 areas, including costs of care, additional fees, and safety and security [75]
    LouisianaLicensing agency and anyone seeking placement, before any care agreement; examined at renewal [60]8 areas, including program fees [60]
    IllinoisDepartment and potential or actual residents [73]Set by the special care disclosure act [73]
    OklahomaForm filed before offering special care; unit described in the license application and contract [69] [70]Special care for Alzheimer's and related disorders [71]
    IndianaCopy of the special care unit form given at admission [47]Form required under state law [47]
    NevadaFull written disclosure before move-in [65]Personalized care services available [65]
    New MexicoResident and legal representative, before admission [66]The secured environment [66]
    FloridaFacilities claiming special Alzheimer's care [50]What distinguishes that care [50]
    New YorkNo marketing of specialized services before approval [52]Staffing, training and environment [52]

    Source: state statutes and regulations as cited.

    Demand is narrower and more urgent. In New Jersey, 23 percent of residents needed total cognitive assistance in 2025; of the 223 facilities reporting Alzheimer's services, 24 ran solely as memory care, 184 ran separate units inside a larger community and 15 combined memory care with the rest of the community [34]. Those models carry different staffing, rates and lease-up speeds, and the competitive set is sorted the same way.

    How are rates and revenue built?

    Revenue is built from the components a resident pays, not one blended rate: base rent by unit type, care-level charges, the memory care premium, second-person fees, community fees and ancillary services, each tested against the survey. Disclosure rules make the components visible: Missouri's form covers costs of care and additional fees [75], Louisiana's covers program fees [60], and a Massachusetts operating plan states the base fee for each unit [80]. Table 14 uses one blended rate only to keep the arithmetic readable.

    Does Medicaid pay for assisted living, and in which states?

    Medicaid can pay for assisted living services through state programs, but not for room and board, and coverage depends on each state's waiver and its capacity. Most assisted living revenue is private pay: the public owner cited above reports 93.5 percent private pay and 0.1 percent Medicaid in its operating portfolio [35]. Where a project plans for Medicaid, one federal rule governs the model. Waivers can pay for assisted living services, but federal matching funds are not available for room and board, outside narrow cases such as respite care [32]. Ohio's waiver shows the result: residents pay a state-set room and board amount, providers must hold a residential care facility license from the Department of Health and certification from the Department of Aging, and participants are limited to $2,000 in countable assets and income of 300 percent of the SSI benefit [33]. States can also require Medicaid access: 87 percent of New Jersey facilities took part in Medicaid in 2025, and 16 percent of residents were covered [34].

    Table 27. Medicaid coverage of assisted living, where official pages say so

    StateProgramWhat the official source says
    All statesFederal waiver ruleNo federal match for room and board, outside narrow cases [32]
    OhioAssisted Living WaiverLicensed and certified providers; $2,000 asset limit; income up to 300% of SSI; state-set room and board [33]
    IllinoisSupportive Living ProgramWaiver pays personal care, homemaking, laundry, medication assistance, activities and 24-hour staff; the resident pays room and board [74]
    IndianaPathWays waiver (60 and older)39,842 slots for July 2025 to June 2026; capacity reached in April 2024; 12,680 on the waiting list; 400 slots reserved for assisted living residents from July 1, 2025, 12 used [77]
    MississippiAssisted Living WaiverListed by the State Department of Health among long-term care alternatives [63]
    New MexicoTurquoise Care Community BenefitAssisted living listed for members who qualify for nursing facility care [67]
    ArizonaArizona Long Term Care SystemNursing facility level of care; many members live in assisted living facilities [78]
    OklahomaADvantage waiverEligibility includes living in one's own or a family member's home [72]
    New JerseyState licensing rule10% of beds reserved for Medicaid-eligible residents (licensed on or after August 31, 2001); 16% of residents covered; five-year rate 17.85% [34]
    New YorkAssisted living program; dementia voucherServes people medically eligible for nursing home care; voucher up to 75% of the regional average private pay rate, subject to appropriations [82]
    TennesseeTennCareState fiscal year 2021: $12,184,973 in assisted care living facilities, $953,863,000 in nursing facilities [79]

    Source: 42 CFR 441.310 [32]; state agency pages, statutes and reports as cited.

    The table shows why the study cannot assume a waiver will fill units. Indiana's waivers hit their federal cap and moved to a waiting list before a separate pool was set aside for assisted living residents [77]; Oklahoma's ADvantage page describes a home-based program [72]; and Tennessee's assisted living spending was about 1.3 percent of its nursing facility spending (computed from [79]). The study splits demand by payor [13], models waiver room and board at the state rate, and documents waiver capacity, because a slot that does not exist cannot fill a unit.

    How does going-concern value differ from real estate value?

    Going-concern value includes the license, the workforce and the operating business; real estate value is the land and building alone. An assisted living community is a business that owns a building, and lenders separate the two. HUD requires a cost approach when the facility is five years old or less, and to reach the market value of the total assets of the business the appraiser weighs absorption, staffing, start-up costs, occupancy costs and entrepreneurial profit [13]. Those are the items the study projects, so the study and the appraisal must agree.

    SBA lists nursing homes, including assisted living facilities, as limited or special purpose property [30]. That raises the 504 borrower contribution to at least 15 percent, or 20 percent for a business two years old or less [26]. In a 7(a) change of ownership, initial acquisitions need 1.25 coverage; where a special purpose acquisition relies on projections, coverage must be met within two years, and the loan may run up to 25 years if 85 percent or more of costs are real estate [30].

    Lease coverage shows how much value sits in the operation. For its stable triple-net seniors housing, the same public owner reports occupancy of 85.6 percent, rent coverage after management fees of 1.22 and before management fees of 1.46 [35].

    Table 28. What sits in assisted living value

    ComponentHow the study supports it
    Land and improvementsBudget, plans and cost approach inputs for newer buildings [13]
    Furniture, fixtures and equipmentLine-item budget and replacement schedule
    License and bed authorityLicensure timeline; licenses pledged to HUD [11]
    Workforce and start-up costsPre-opening budget, staffing plan, absorption period [13]
    Operating businessStabilized income, management fee and rent coverage [35]

    Source: HUD Handbook 4232.1 [11] [13]; Welltower Inc. third quarter 2026 supplement [35].

    The study gives no opinion of value; that comes from a separately engaged appraiser. See the going-concern and real estate value case study.

    Which HUD Section 232 program fits the project?

    The program follows the project's stage: new construction or substantial rehabilitation for a building not yet operating, 223(f) for a stable project at least three years old, and the smaller programs for refinancing, additions, losses and sprinklers. Each sets its own term, sizing and coverage.

    Table 29. HUD Section 232 programs side by side

    ProgramUseTerm and sizingMinimum coverageOther rules
    232 new constructionNew building; no work before the firm commitment [11]Up to 40 years or 3/4 of remaining economic life, at least 10 [11]; lesser of 75% of value for new for-profit assisted living, 90% of replacement cost and the coverage test [12]1.45, including the insurance premium [12]4% working capital escrow, half contingency; deficit escrow [11]
    232 substantial rehabilitationHard costs over 15% of value after completion, or 2 or more major components replaced [11]Value and coverage tests [12]1.45 [12]Working capital without the extra 2% contingency [11]
    232/223(f)Purchase or refinance of a project complete 3 years or more [11]Up to 35 years or 75% of remaining economic life [11]; 80% of value for existing for-profit assisted living [12]1.45 [12]No cash proceeds to borrowers or operators [11]
    232/223(a)(7)Streamlined refinance of an FHA-insured loan [11]No longer than the original program allows, such as 40 years after new construction [11]1.11 [12]Cost certification generally not required [11]
    232/241(a)Supplemental loan for additions, including new beds or units, and repairs [11]90% of replacement cost and of the value added [12]1.45 after the first loan's debt service [12]No working capital deposit [11]
    223(d) operating loss loanRecovers owner funding of unforeseen early operating deficits [11]Up to 100% of the audited operating loss [12]1.45 after the first loan's debt service [12]For FHA-insured projects [11]
    232(i) fire safetyFire safety equipment, mainly sprinklers [11]Permanent loan only [11]1.11 after the first loan's debt service [12]Premium of 1% a year unless changed by notice [11]

    Source: HUD Handbook 4232.1, Section II, Chapters 2 and 3 [11] [12].

    For a new building the loan is the lowest of the coverage test, the value cap and 90 percent of replacement cost [12]; the model above applied only the coverage test. The 223(f) three-year rule also shapes exit planning: a construction loan that plans a 223(f) take-out must carry the project until it has been complete for three years [11].

    Which financing paths fit assisted living and memory care?

    HUD, SBA, USDA and conventional debt all fit, but each serves a different borrower and project size.

    Table 30. Financing paths for assisted living and memory care

    PathBorrowerLeverage or sizeCoverageTermStudy rule
    HUD 232 new constructionLicensed facility owners, 20 beds or more [11]75% for-profit, 80% nonprofit (new assisted living) [12]; statute up to 90% or 95% [14]1.45 [12]Up to 40 years [11]Market study in the appraisal [13]
    HUD 232/223(f)Existing licensed facilities80% for-profit, 85% nonprofit [12]1.45 [12]Up to 35 years [11]Shorter study allowed if stable [13]
    SBA 7(a)For-profit licensed operators providing healthcare or medical services [23] [30]$5,000,000 per loan; $3,750,000 aggregate guaranty [24]; 85% or 75% guaranty [28]1.15; 1.25 initial acquisition [30]Varies; up to 25 years for qualifying acquisitions [30]SBA may require one [25]
    SBA 504Same as 7(a) [23]$5,000,000, or $5,500,000 for listed projects [27] [29]; 15% or 20% contribution [26]Ratio analysis by the CDC [30]10, 20 or 25 years [29]Triggered by saturation or specialized property [30]
    USDA Community FacilitiesPublic bodies, nonprofits, tribes (grant rules) [16]Grants up to 75% of cost [17]Revenue covers operations, debt and reserves [21]Not covered hereReport on every guarantee; 90% cap [21]
    USDA Business and IndustryRural businesses, including for-profit operatorsNot covered hereNot covered hereNot covered hereIndependent study above $1,000,000 for a new business [22]
    Conventional construction debtSponsors the lender acceptsCredit policyCredit policyShort term with a planned take-outSet by the lender's credit policy

    Source: HUD Handbook 4232.1 [11] [12] [13]; 12 U.S.C. 1715w [14]; 13 CFR Part 120 [23] [24] [25] [26] [27]; SBA [28] [29] [30]; 7 CFR Parts 3570 and 5001 [16] [17] [21] [22].

    Eligibility narrows the choice early. SBA excludes nonprofit businesses [23]. USDA Community Facilities grants define rural as 20,000 people or fewer [15], while Part 5001 guarantees exclude cities and towns over 50,000 and their adjacent urbanized areas [18]. Business and Industry funds assisted living only where constant medical care is available on site [19]. SBA's current SOP took effect October 1, 2026 [30], and it says independent reports such as feasibility studies may help offset weaknesses found in the credit analysis [30]. A study written to the strictest program in view serves both the construction lender and the take-out lender.

    What must an assisted living study contain?

    It must contain the conclusion and every input behind it, with each figure dated and sourced.

    1. A conclusion: feasible, feasible on stated conditions, or not feasible as proposed.
    2. The project: units by care level, sizes, common areas, memory care security design and operator.
    3. A primary market area with map, boundaries and a stated outside-demand share [13].
    4. Current and five-year demographics by age, income and assets [13].
    5. Demand by care level and payor, with each input marked verified or assumed [13].
    6. A competitor survey from site visits, pricing calls and interviews, with operated and licensed beds kept apart [13].
    7. Pipeline projects with status and likelihood [13].
    8. Penetration with formula, inputs and a surveyed benchmark.
    9. Rates by unit type and care level, with the pricing structure explained.
    10. Monthly fill-up with base, downside and severe cases tied to demand [13].
    11. Staffing by position and shift at local wages, checked against state minimums.
    12. A budget to stabilization and five years beyond, with coverage by year against the lender's test.
    13. An operating deficit and working capital estimate built to HUD's interval method [54].
    14. The licensing path for each care level, with dates.
    15. A Medicaid section where waiver residents are planned [32] [33].
    16. Sensitivity tests on occupancy, rates, wages, interest rate and opening date, with breakeven occupancy.
    17. Dated sources for every figure.

    What documents does the study need from the sponsor?

    It needs the documents behind every input the lender will test, gathered at the start.

    Table 31. Documents to gather before the study starts

    DocumentWhy the study needs it
    Unit mix by care level, floor plans and the licensed bed count soughtLicensed beds must at least equal the beds the loan is sized on [11]
    Operator resume: each community's year opened, fill pace, occupancy and marginsHUD's experience test for projects adding units [55]
    Staffing plan by position and shift, with hourly payHUD's staffing listing and state minimum ratios [55] [61]
    Management agreement, operating agreement or leaseSBA's oversight test and HUD's operator agreement [30] [55]
    License applications, need approvals or exemptions, agency lettersApproval timing [57] [69]
    Rate schedule, residency agreement and disclosure formsState disclosure rules and the revenue build [60] [75]
    Construction budget, schedule and expected occupancy permit dateDeficit intervals, working capital and licensing [54] [76]
    Pre-lease list with deposits and target move-in datesPre-leases counted once in absorption [54]
    For acquisitions: three years of statements, census by payor and survey historyDemand by payor and the operator's survey record [13] [55]

    Source: HUD Handbook 4232.1 [11] [13] [54] [55]; SBA SOP 50 10 8.1 [30]; state regulations as cited.

    How should pre-leasing and deposits be handled?

    Pre-leasing counts as evidence only when it is signed, priced and dated. HUD asks for the absorption of recently completed projects, including pre-sales, move-ins and move-outs [13], and its deficit method lets pre-leases front-load move-ins without double counting them [54]. The study records units reserved, terms, expected conversion and move-in dates. A refundable deposit shows interest; a larger, partly non-refundable deposit tied to a move-in window shows commitment. Conversion rates are stated as assumptions unless the operator has its own history, and any state rule on holding deposits is cited from the state's text. In Table 12, raising units leased at opening from 20 to 40 moves the severe case from 31 months to 21, back inside SBA's two-year window [30], and in Table 17 it cuts the peak cash shortfall by about $1.84 million against the severe case (model outputs). Memory care rarely pre-leases, because families often decide within weeks of a crisis, so that wing is modeled on referral volume instead.

    What should lenders and owners monitor after opening?

    They should monitor the inputs the study projected, on the dates the program and the state set, using the monthly model as the baseline.

    Table 32. Post-opening reporting and monitoring points

    What to trackFrequency or deadlineSource
    Occupancy, move-ins and move-outs against the modelMonthly, as net absorptionHUD deficit method [54]
    Operator quarterly and year-to-date financial reports (HUD 232)Within 60 days; final quarter within 90 days of year endHUD Section III, Chapter 4 [56]
    For-profit borrower audited annual statement (HUD 232)Within 90 days of fiscal year endHUD Section III, Chapter 4 [56]
    Break-even test for release of the working capital escrow1.0 coverage for six consecutive months, at least 12 months after final closingHUD Section II, Chapter 2 [11]
    State survey results and open findingsEach inspection; Washington at most 18 months apart; New Mexico surveys state-licensed assisted living[44] [68]
    Operator survey record across its portfolioHUD reviews three years of skilled nursing surveysHUD Section II, Chapter 8 [55]
    License or certification renewalMississippi each March 31; Oklahoma every 3 years; New Mexico annually; Massachusetts every 2 years[61] [69] [66] [80]
    Internal quality assurance committeeAt least quarterly in Oklahoma[69]
    Annual accountant's opinion on fiscal condition and reservesAnnually in Massachusetts[80]

    Source: HUD Handbook 4232.1 [11] [54] [55] [56]; state regulations and statutes as cited.

    A quarterly variance report compares actual occupancy, rate, labor hours and agency use with the study's base and downside cases, so action comes before the deficit reserve runs out.

    How much does an assisted living feasibility study cost and how long does it take?

    FSC's published fee range for senior living studies, including assisted living and memory care, is $14,000 to $26,000, and delivery runs 6 to 10 weeks. Scope sets where a project falls: the number of care levels, a separate memory care wing, the number of competitors to survey, whether HUD's deficit template is needed, and how many lenders the file must satisfy.

    1. Scoping: capital source, program, loan size, care levels and the tests that apply.
    2. Document intake: the items in Table 31.
    3. Field and market research: site inspection, competitor visits, pricing calls, demand and payor analysis.
    4. Model: monthly fill-up, deficit and working capital, staffing at local wages, coverage by year and sensitivity cases.
    5. Review: the draft is checked against the questions in Table 4 and revised only for new facts.
    6. Final report: signed, with written answers to the lender's follow-up questions.

    A sponsor who gathers the operator history, staffing plan and license correspondence first gives the study its best chance of finishing at the short end of the range.

    Who prepares the study?

    The study is prepared and signed by Sarrah Allen, MAI. It does not replace the appraisal, the state's licensing review or the lender's credit decision. More is on the about page.

    Download the evidence behind this page's exhibits (CSV, 724 data points with sources)

    Frequently Asked Questions

    What is an assisted living feasibility study?
    It tests whether a proposed or existing community can fill, staff, hold its license and cover its debt. It combines demand, a field survey, rates, staffing, fill-up and a projection measured against the lender's coverage test.
    How is a memory care feasibility study different?
    It runs its own demand count, competitors, staffing and lease-up. Most states regulate memory care as an add-on, such as North Carolina's special care unit license [40] or New York's special needs plan [52].
    Which age group does an assisted living study count?
    Most start with households headed by someone 75 or older and run a second pass on 80 or older. The Census Bureau estimates 27.9 million people aged 75 and older in July 2025 [1].
    How is income qualification set?
    From the rate card, plus households that qualify through assets. Nationally, 34.3 percent of 75-plus households had 2025 income of $75,000 or more [5], and the median owner held $260,000 in home equity [6].
    What coverage does HUD Section 232 require?
    A minimum debt service coverage ratio of 1.45 for most loans and 1.11 for 223(a)(7) and 232(i) loans [12]. New for-profit assisted living loans are capped at 75 percent of value [12].
    Can SBA finance an assisted living facility?
    Yes, if it is licensed and provides healthcare or medical services [30]. Nonprofits are ineligible [23], and special purpose treatment raises the 504 contribution to at least 15 percent [26].
    Does USDA finance assisted living?
    Yes. Community Facilities serves public bodies, nonprofits and tribes in rural areas [16] with projections capped at 90 percent occupancy [21]; Business and Industry serves rural businesses with constant on-site medical care [19].
    What occupancy should a study assume at stabilization?
    What comparable buildings show, within program caps. USDA caps projections at 90 percent [21], and one public owner treats a property as stable at 90 percent [35]. New Jersey calculates market-wide occupancy of 66.40 percent for 2025 [34].
    How long does an assisted living community take to fill?
    It depends on pre-leasing, net move-ins and turnover. In this page's illustrative model, a 90-unit building reaches 90 percent in 13 to 31 months (model output).
    What share of costs is labor?
    The largest share. One public owner reports compensation at 58.9 percent of same-store operating expenses (computed) [35], and payroll per employee among the largest states ranges from $30,892 to $43,805 [8].
    Does Medicaid pay for assisted living?
    Waivers can pay for services, but federal matching funds do not cover room and board [32]. Residents pay that part, often at a state-set rate [33].
    Is a feasibility study the same as an appraisal?
    No. The study concludes on feasibility; the appraisal on value. HUD's appraisal uses the same start-up items the study projects [13], so they should agree. Read more about FSC.
    What is HUD's initial operating deficit escrow?
    It is cash set aside to cover operating losses and debt service until the project reaches breakeven and steady positive cash flow. HUD requires the analysis when units are added and an escrow for any deficit period [11], built with net monthly absorption, a two-month receipt lag and doubled marketing until stabilization [54].
    Does HUD require a certificate of need for assisted living?
    Only where the state requires one. If a state requires a certificate of need for assisted living, the lender must give HUD a copy [11]. Kentucky, for example, exempts assisted living communities from certificate of need [57].
    Can a third-party manager run an SBA-financed assisted living facility?
    Yes, if the owner keeps meaningful oversight. The owner must approve the budget and large spending, control the bank accounts and oversee staff who are its own employees; a manager with sole discretion makes the business ineligible [30].
    How much equity does an assisted living start-up need?
    For SBA 7(a), at least 10 percent of project cost for a business operating one year or less [30]. A 504 loan on a special purpose building needs 15 percent, or 20 percent for a business two years old or less [26].
    Which states require a separate license or designation for memory care?
    Several. Kentucky issues a separate license for a secured dementia unit on a campus with another assisted living level [57], North Carolina licenses special care units [40], and Mississippi prints the Alzheimer's unit designation on the license [62].
    Do states set staffing ratios for assisted living?
    A few do. Mississippi requires one attendant per 15 residents by day and per 25 overnight [61]; Oklahoma requires two staff awake on all shifts where a unit limits outside access [69]; and Nevada uses one staff member per six residents as a dementia placement test [64].
    What should a memory care unit's outdoor space provide?
    Secure access to the outdoors, and in some states set dimensions. Kentucky requires secured outdoor space for dementia units built after July 14, 2022 [57], New Mexico requires a secure outdoor area for year-round use [66], and Mississippi requires a walking path at least 4 feet wide [62].
    Will a Medicaid waiver fill assisted living units?
    Only where the waiver covers assisted living and has open slots. Indiana reached its federal cap in April 2024 and had 12,680 people on its PathWays waiting list [77], so the study documents slots before counting waiver residents.
    How much does agency staffing matter?
    Enough to model as its own line. In a Tennessee state survey, 45 percent of responding assisted care living facilities contracted with staffing agencies [79], so the study states the agency share it assumes during lease-up and after stabilization.
    What is breakeven occupancy and why does it matter?
    It is the occupancy at which income covers expenses and debt service. HUD defines break-even as 1.0 coverage for six consecutive months [11]; in this page's model it falls at 79.1 percent occupancy (model output), which a lender compares with the market's actual occupancy.
    How much does an assisted living feasibility study cost?
    FSC's published range for senior living studies, including assisted living and memory care, is $14,000 to $26,000, with delivery in 6 to 10 weeks. Scope, memory care and the number of lenders the file must satisfy set the fee within that range.
    Can one study serve HUD, SBA and USDA at the same time?
    Yes, if it is written to the strictest test in view. The study states each program's coverage, occupancy and equity rules and shows the project against each one [12] [21] [30], rather than presenting one set of results for all of them.
    What documents should a developer gather before ordering a study?
    The unit mix and plans, the operator's track record with fill pace and occupancy, a staffing plan with hourly pay, the management agreement, licensing correspondence, the rate schedule, the construction schedule and any pre-lease list [11] [30] [55].

    Sources

    1. 1.U.S. Census Bureau. "National Resident Population for Selected Age Groups by Sex, 2020 to 2025 (NC-EST2025-AGESEX)." https://www2.census.gov/programs-surveys/popest/tables/2020-2025/national/asrh/nc-est2025-agesex.xlsx (accessed 2026-11-11)
    2. 2.U.S. Census Bureau. "State Civilian Population by Single Year of Age and Sex, 2020 to 2025 (SC-EST2025-AGESEX-CIV)." https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/state/asrh/sc-est2025-agesex-civ.csv (accessed 2026-11-11)
    3. 3.U.S. Census Bureau. "2023 National Population Projections, Main Series, Table 2." https://www2.census.gov/programs-surveys/popproj/tables/2023/2023-summary-tables/np2023-t2.xlsx (accessed 2026-11-11)
    4. 4.U.S. Census Bureau. "2023 National Population Projections, Main Series, Table 3." https://www2.census.gov/programs-surveys/popproj/tables/2023/2023-summary-tables/np2023-t3.xlsx (accessed 2026-11-11)
    5. 5.U.S. Census Bureau. "HINC-02. Age of Householder by Total Money Income in 2025." https://www2.census.gov/programs-surveys/cps/tables/hinc-02/2026/hinc02_1_1.xlsx (accessed 2026-11-11)
    6. 6.U.S. Census Bureau. "Wealth and Asset Ownership for Households: 2023." https://www2.census.gov/programs-surveys/demo/tables/wealth/2023/wealth-asset-ownership/wealth_tables_dy2023.xlsx (accessed 2026-11-11)
    7. 7.U.S. Census Bureau. "County Business Patterns 2023, U.S. Data File." https://www2.census.gov/programs-surveys/cbp/datasets/2023/cbp23us.zip (accessed 2026-11-11)
    8. 8.U.S. Census Bureau. "County Business Patterns 2023, State Data File." https://www2.census.gov/programs-surveys/cbp/datasets/2023/cbp23st.zip (accessed 2026-11-11)
    9. 9.U.S. Census Bureau. "County Business Patterns U.S. Data Dictionary, 2018 to 2023." https://www2.census.gov/programs-surveys/cbp/technical-documentation/records-layouts/2018_record_layouts/us-layout-2018.txt (accessed 2026-11-11)
    10. 10.U.S. Department of Housing and Urban Development. "Healthcare Mortgage Insurance Program Handbook (4232.1)." https://www.hud.gov/hudclips/handbooks/housing-4232-1 (accessed 2026-11-11)
    11. 11.U.S. Department of Housing and Urban Development. "Handbook 4232.1, Section II, Chapter 2: Eligible Section 232 Mortgage Insurance Programs." https://www.hud.gov/sites/documents/42321s2c2hsgh.pdf (accessed 2026-11-11)
    12. 12.U.S. Department of Housing and Urban Development. "Handbook 4232.1, Section II, Chapter 3: Loan Sizing." https://www.hud.gov/sites/documents/42321s2c3hsgh.pdf (accessed 2026-11-11)
    13. 13.U.S. Department of Housing and Urban Development. "Handbook 4232.1, Section II, Chapter 5: Appraisals and Market Studies." https://www.hud.gov/sites/documents/42321s2c5hsgh.pdf (accessed 2026-11-11)
    14. 14.U.S. Government Publishing Office. "12 U.S.C. 1715w." https://www.govinfo.gov/content/pkg/USCODE-2024-title12/html/USCODE-2024-title12-chap13-subchapII-sec1715w.htm (accessed 2026-11-11)
    15. 15.U.S. Government Publishing Office. "7 CFR 3570.53, Definitions." https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec3570-53.xml (accessed 2026-11-11)
    16. 16.U.S. Government Publishing Office. "7 CFR 3570.61, Eligibility for grant assistance." https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec3570-61.xml (accessed 2026-11-11)
    17. 17.U.S. Government Publishing Office. "7 CFR 3570.63, Grant limitations." https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec3570-63.xml (accessed 2026-11-11)
    18. 18.U.S. Government Publishing Office. "7 CFR 5001.3, Definitions." https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec5001-3.xml (accessed 2026-11-11)
    19. 19.U.S. Government Publishing Office. "7 CFR 5001.105, Eligible B&I projects and requirements." https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec5001-105.xml (accessed 2026-11-11)
    20. 20.U.S. Government Publishing Office. "7 CFR 5001.118, Ineligible B&I projects." https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec5001-118.xml (accessed 2026-11-11)
    21. 21.U.S. Government Publishing Office. "7 CFR 5001.304, Specific application requirements for CF projects." https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec5001-304.xml (accessed 2026-11-11)
    22. 22.U.S. Government Publishing Office. "7 CFR 5001.306, Specific application requirements for B&I projects." https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec5001-306.xml (accessed 2026-11-11)
    23. 23.U.S. Government Publishing Office. "13 CFR 120.110, What businesses are ineligible for SBA business loans?" https://www.govinfo.gov/content/pkg/CFR-2026-title13-vol1/xml/CFR-2026-title13-vol1-sec120-110.xml (accessed 2026-11-11)
    24. 24.U.S. Government Publishing Office. "13 CFR 120.151, What is the statutory limit for total loans to a Borrower?" https://www.govinfo.gov/content/pkg/CFR-2026-title13-vol1/xml/CFR-2026-title13-vol1-sec120-151.xml (accessed 2026-11-11)
    25. 25.U.S. Government Publishing Office. "13 CFR 120.160, Loan conditions." https://www.govinfo.gov/content/pkg/CFR-2026-title13-vol1/xml/CFR-2026-title13-vol1-sec120-160.xml (accessed 2026-11-11)
    26. 26.U.S. Government Publishing Office. "13 CFR 120.910, Borrower contributions." https://www.govinfo.gov/content/pkg/CFR-2026-title13-vol1/xml/CFR-2026-title13-vol1-sec120-910.xml (accessed 2026-11-11)
    27. 27.U.S. Government Publishing Office. "13 CFR 120.931, 504 Lending limits." https://www.govinfo.gov/content/pkg/CFR-2026-title13-vol1/xml/CFR-2026-title13-vol1-sec120-931.xml (accessed 2026-11-11)
    28. 28.U.S. Small Business Administration. "7(a) loans." https://www.sba.gov/loans/7a-loans/ (accessed 2026-11-11)
    29. 29.U.S. Small Business Administration. "504 loans." https://www.sba.gov/loans/504-loans/ (accessed 2026-11-11)
    30. 30.U.S. Small Business Administration. "SOP 50 10 8.1, Lender and Development Company Loan Programs, including Appendix 15." https://www.sba.gov/document/sop-50-10-lender-development-company-loan-programs (accessed 2026-11-11)
    31. 31.U.S. Government Publishing Office. "42 CFR 441.301, Contents of request for a waiver." https://www.govinfo.gov/content/pkg/CFR-2025-title42-vol4/xml/CFR-2025-title42-vol4-sec441-301.xml (accessed 2026-11-11)
    32. 32.U.S. Government Publishing Office. "42 CFR 441.310, Limits on Federal financial participation (FFP)." https://www.govinfo.gov/content/pkg/CFR-2025-title42-vol4/xml/CFR-2025-title42-vol4-sec441-310.xml (accessed 2026-11-11)
    33. 33.Ohio Department of Aging. "Assisted Living Medicaid Waiver Program." https://dam.assets.ohio.gov/image/upload/v1726589962/aging.ohio.gov/Assisted_Living_Medicaid_Waiver.pdf (accessed 2026-11-11)
    34. 34.New Jersey Department of Health. "Assisted Living Resident Profile Survey Results for 2025." https://www.nj.gov/health/healthfacilities/certificate-need/guidance/nj-assisted-living-resident-profile-survey-results-for-2025.pdf (accessed 2026-11-11)
    35. 35.Welltower Inc. "Third Quarter 2026 Earnings Release and Supplemental Information." https://welltower.com/wp-content/uploads/2026/10/3Q26-Combined-Earnings-Release-Supplement-Final.pdf (accessed 2026-11-11)
    36. 36.California Department of Social Services. "Dementia Care Information and Resources." https://www.cdss.ca.gov/inforesources/dementia-care-information-and-resources (accessed 2026-11-11)
    37. 37.Pennsylvania Department of Human Services. "OLTL-Bureau of Human Services Licensing." https://www.pa.gov/agencies/dhs/departments-offices/oltl-info/oltl-bureau-human-services-licensing (accessed 2026-11-11)
    38. 38.Illinois Department of Public Health. "Assisted Living." https://dph.illinois.gov/topics-services/health-care-regulation/assisted-living.html (accessed 2026-11-11)
    39. 39.North Carolina Department of Health and Human Services. "Long Term Care Facilities with Special Care Units (Memory Care Units)." https://www.ncdhhs.gov/ltc-facilities-scu-memory-care-units/open (accessed 2026-11-11)
    40. 40.North Carolina General Assembly. "G.S. 131D-4.6, Licensure of special care units." https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_131D/GS_131D-4.6.html (accessed 2026-11-11)
    41. 41.Georgia Department of Community Health. "Personal Care Homes." https://dch.georgia.gov/divisionsoffices/hfrd/facilities-provider-information/personal-care-homes (accessed 2026-11-11)
    42. 42.Arizona Department of Health Services. "Assisted Living Facilities Provider Type Definitions." https://hsapps.azdhs.gov/ls/sod/alprovtypes.aspx (accessed 2026-11-11)
    43. 43.Virginia Department of Social Services. "Licensed Care." https://www.dss.virginia.gov/licensed-care/ (accessed 2026-11-11)
    44. 44.Washington State Department of Social and Health Services. "Residential Care Services SOP, Chapter 13: Assisted Living Facilities." https://www.dshs.wa.gov/sites/default/files/ALTSA/rcs/documents/SOP/Chapter%2013%20-%20Assisted%20Living%20Facilities.pdf (accessed 2026-11-11)
    45. 45.Missouri Department of Health and Senior Services. "Level of Licensure for Long Term Care Facilities." https://health.mo.gov/providers/nursing-homes-other-long-term-care/level-licensure-long-term-care-facilities (accessed 2026-11-11)
    46. 46.Maryland Department of Health, Office of Health Care Quality. "Assisted Living Programs." https://health.maryland.gov/ohcq/Pages/Assisted-Living-Programs.aspx (accessed 2026-11-11)
    47. 47.Indiana Department of Health. "Alzheimer's and Dementia Care Rules, Residential Care Facilities." https://secure.in.gov/health/files/Residential_Care_Facility_Alzheimers_Rules.pdf (accessed 2026-11-11)
    48. 48.Florida Legislature. "Florida Statutes 2025, Section 429.02, Definitions." https://www.flsenate.gov/Laws/Statutes/2025/429.02 (accessed 2026-11-11)
    49. 49.Florida Legislature. "Florida Statutes 2025, Section 429.07, License required; fee." https://www.flsenate.gov/Laws/Statutes/2025/429.07 (accessed 2026-11-11)
    50. 50.Florida Legislature. "Florida Statutes 2025, Section 429.177, Alzheimer's disease disclosures." https://www.flsenate.gov/Laws/Statutes/2025/429.177 (accessed 2026-11-11)
    51. 51.New York State Senate. "Public Health Law Section 4651, Definitions (Article 46-B)." https://www.nysenate.gov/legislation/laws/PBH/4651*2 (accessed 2026-11-11)
    52. 52.New York State Senate. "Public Health Law Section 4655, Certification procedures and requirements (Article 46-B)." https://www.nysenate.gov/legislation/laws/PBH/4655*2 (accessed 2026-11-11)
    53. 53.Massachusetts Legislature. "General Laws, Part I, Title II, Chapter 19D, Section 1." https://malegislature.gov/Laws/GeneralLaws/PartI/TitleII/Chapter19D/Section1 (accessed 2026-11-11)
    54. 54.U.S. Department of Housing and Urban Development. "Handbook 4232.1, Section II, Appendix 2.1: Calculating the Initial Operating Deficit Escrow." https://www.hud.gov/sites/documents/42321s2a21hsgh.pdf (accessed 2026-11-11)
    55. 55.U.S. Department of Housing and Urban Development. "Handbook 4232.1, Section II, Chapter 8: Operator and Management Agent Analysis." https://www.hud.gov/sites/documents/42321s2c8hsgh.pdf (accessed 2026-11-11)
    56. 56.U.S. Department of Housing and Urban Development. "Handbook 4232.1, Section III, Chapter 4: Financial Operations." https://www.hud.gov/sites/documents/42321s3c4hsgh.pdf (accessed 2026-11-11)
    57. 57.Kentucky Legislative Research Commission. "902 KAR 20:480, Assisted living communities." https://apps.legislature.ky.gov/law/kar/titles/902/020/480/ (accessed 2026-11-11)
    58. 58.Louisiana State Legislature. "R.S. 40:2166.3, Definitions (adult residential care)." https://legis.la.gov/legis/Law.aspx?d=409892 (accessed 2026-11-11)
    59. 59.Louisiana State Legislature. "R.S. 40:2166.7.1, Moratorium on level 4 adult residential care providers." https://legis.la.gov/legis/Law.aspx?d=814266 (accessed 2026-11-11)
    60. 60.Louisiana State Legislature. "R.S. 40:1101.3, Alzheimer's special care disclosure." https://legis.la.gov/legis/Law.aspx?d=965064 (accessed 2026-11-11)
    61. 61.Mississippi State Department of Health. "Minimum Standards for Personal Care Homes, Assisted Living (Title 15, Part 16, Chapter 47)." https://msdh.ms.gov/resources/media/341.pdf (accessed 2026-11-11)
    62. 62.Mississippi State Department of Health. "Minimum Standards for Alzheimer's Disease/Dementia Care Units (Title 15, Part 3, Chapter 50)." https://msdh.ms.gov/resources/media/118.pdf (accessed 2026-11-11)
    63. 63.Mississippi State Department of Health. "Long Term Care Facilities." https://msdh.ms.gov/resources/public-health-forms/license-application-forms/health-facility-licenses/health-care-facilities/long-term-care (accessed 2026-11-11)
    64. 64.Nevada Legislature. "NRS Chapter 449, Medical Facilities and Other Related Entities." https://www.leg.state.nv.us/NRS/NRS-449.html (accessed 2026-11-11)
    65. 65.Nevada Division of Public and Behavioral Health. "Technical Bulletin: Assisted Living Definition." https://www.dpbh.nv.gov/siteassets/regulatory/hcqc/healthfacilities/hf---non-medical/residential-facilities-for-groups-files/TB-Assisted-Living-Definition-05-30-19.pdf (accessed 2026-11-11)
    66. 66.New Mexico Health Care Authority. "8.370.14 NMAC, Assisted Living Facilities for Adults." https://prod-rf-lambda.rtssaas.com/PublicFiles/d89c47bd0d70402dba89b03a22bda6d1/ccf65d0c-dad8-41fc-973b-54a495bbbcd5/08.370.0014.pdf (accessed 2026-11-11)
    67. 67.New Mexico Health Care Authority. "Turquoise Care Community Benefit (MAD 792)." https://www.hca.nm.gov/wp-content/uploads/MAD-792-CB-Brochure-2024-Revised-7.01.25.pdf (accessed 2026-11-11)
    68. 68.New Mexico Health Care Authority. "Health Facility Licensing and Certification." https://www.hca.nm.gov/health-facility-licensing-and-certification/ (accessed 2026-11-11)
    69. 69.Oklahoma State Department of Health. "OAC 310:663, Continuum of Care and Assisted Living." https://oklahoma.gov/content/dam/ok/en/health/health2/aem-documents/protective-health/hrds/health-facility-systems/Ch-663.pdf (accessed 2026-11-11)
    70. 70.Oklahoma State Department of Health. "Health Facility Systems." https://oklahoma.gov/health/services/licensing-inspections/long-term-care-service/health-facility-systems.html (accessed 2026-11-11)
    71. 71.Oklahoma State Department of Health. "OAC 310:673, Alzheimer's Disease Special Care Disclosure." https://oklahoma.gov/content/dam/ok/en/health/health2/aem-documents/protective-health/hrds/health-facility-systems/HRDS_Chapt673%20Alz.pdf (accessed 2026-11-11)
    72. 72.Oklahoma Health Care Authority. "ADvantage Waiver Program." https://oklahoma.gov/ohca/individuals/programs/ltcs/advantage-waiver-program.html (accessed 2026-11-11)
    73. 73.Illinois General Assembly. "210 ILCS 9/150, Alzheimer and dementia programs." https://ilga.gov/ftp/ILCS/Ch%200210/Act%200009/021000090K150.html (accessed 2026-11-11)
    74. 74.Illinois Department of Healthcare and Family Services. "Supportive Living Program." https://hfs.illinois.gov/medicalprograms/slf.html (accessed 2026-11-11)
    75. 75.Missouri Revisor of Statutes. "RSMo 198.510, Alzheimer's special care disclosure." https://revisor.mo.gov/main/OneSection.aspx?section=198.510 (accessed 2026-11-11)
    76. 76.Pennsylvania Department of Human Services. "Apply to Be a Department of Human Services Licensed Provider." https://www.pa.gov/services/dhs/apply-to-be-a-department-of-human-services-licensed-provider (accessed 2026-11-11)
    77. 77.Indiana Family and Social Services Administration. "HCBS Medicaid Waiver Waiting List Information." https://www.in.gov/fssa/ddars/resources/individuals/hcbs-waiver-waiting-list-information (accessed 2026-11-11)
    78. 78.Arizona Health Care Cost Containment System. "Arizona Long Term Care System (ALTCS)." https://azahcccs.gov/Members/GetCovered/Categories/ALTCS.html (accessed 2026-11-11)
    79. 79.Tennessee Comptroller of the Treasury, Office of Research and Education Accountability. "Long-Term Care Staffing, Executive Summary (2022)." https://comptroller.tn.gov/content/dam/cot/orea/advanced-search/2022/LTCExecutiveSummary.pdf (accessed 2026-11-11)
    80. 80.Massachusetts Legislature. "General Laws, Chapter 19D, Section 4, Certification." https://malegislature.gov/Laws/GeneralLaws/PartI/TitleII/Chapter19D/Section4 (accessed 2026-11-11)
    81. 81.Massachusetts Legislature. "General Laws, Chapter 19D, Section 18." https://malegislature.gov/Laws/GeneralLaws/PartI/TitleII/Chapter19D/Section18 (accessed 2026-11-11)
    82. 82.New York State Senate. "Social Services Law Section 461-L, Assisted living program." https://www.nysenate.gov/legislation/laws/SOS/461-L (accessed 2026-11-11)