How to read this page
Every requirement below carries one of three labels, because a credit file is judged against different standards depending on where a requirement comes from:
- Rule: regulation text in the Code of Federal Regulations or a final rule in the Federal Register. A rule binds the lender or the borrower, and a file that fails it can be ineligible for the program.
- Program guidance: an agency's operating procedures, such as SBA's SOP 50 10 or USDA staff instructions. It applies to lenders that take part in the program, but it is not regulation.
- Supervisory expectation: examiner handbooks, interagency guidelines and policy statements. Examiners criticize practices that fall short of them, but they do not create a legal duty to order any particular report.
Credit officers often mix these up. "The OCC requires a feasibility study for construction loans" is not true as a statement of law. "The OCC expects a bank's construction lending policy to say when a feasibility study is required, and expects the bank to analyze feasibility itself" is true, and it has real consequences at examination.
Requirement matrix
The matrix sums up the position for each lender type and program. Citations point to the sources list; the detail follows in the sections below. For a printable version arranged by loan type, see the lender requirements matrix.
| Lender or program | Is a feasibility study required? | Trigger | Who may prepare it | Required contents | Citation |
|---|---|---|---|---|---|
| OCC (national banks, federal savings associations) | Supervisory expectation, not a rule. The rule requires a written real estate lending policy; the guidelines say the policy should set feasibility study requirements | Development and construction projects and completed commercial property, "commensurate with the size and type of the project" | Not set by rule. The CRE booklet warns that borrower-commissioned studies "may be biased" and should be critically reviewed, and says the bank should do its own analysis | Not prescribed. The booklet covers budget, pro forma, site, demographics, market supply and demand, absorption and stress testing | 12 CFR 34.62; Part 34 subpt. D app. A [16][17]; CRE booklet v2.0 [28] |
| FDIC (state non-member banks) | Supervisory expectation, on the same basis as the OCC | Same interagency guidelines | Not set by rule | Examiner procedures list feasibility studies covering economic and environmental issues, engineering, soils, flood plain, zoning and water availability | 12 CFR 365.2 [18]; RMS Manual 3.2 [36]; CLD core analysis [37] |
| Federal Reserve (state member banks) | Supervisory expectation, on the same basis | Same interagency guidelines (appendix C to part 208) | Not set by rule | Not prescribed | 12 CFR 208.51 [19]; SR 07-1, SR 23-5 [31][33] |
| NCUA (federally insured credit unions) | Not required by rule. The commercial loan policy must require a borrower-prepared projection when history does not support the new debt | Historic performance does not support projected debt payments | The borrower prepares the projection; the credit union underwrites it | At minimum a projected balance sheet and income and expense statement, "supported by reasonable rationale" | 12 CFR 723.4(f)(3) [23] |
| SBA 7(a) | Rule permits; program guidance decides. SBA "may require" a feasibility study. SOP 50 10 8.1 sets when | Set in SOP 50 10 8.1 (not confirmed here; see VERIFY) | Set in SOP (see VERIFY) | Set in SOP (see VERIFY) | 13 CFR 120.160(b), 120.150 [24][25]; SOP 50 10 8.1 [40][41] |
| SBA 504 | Rule permits; program guidance decides. Same regulation; the borrower contribution rises for new businesses and special-purpose property | Set in SOP 50 10 8.1 (see VERIFY). The 15 and 20 percent contribution tiers are a rule | Set in SOP (see VERIFY) | Set in SOP (see VERIFY) | 13 CFR 120.160(b), 120.910 [25][26] |
| USDA B&I guaranteed | Rule. Mandatory above the trigger; the Agency may require one below it | Guaranteed loan over $1,000,000 to a new business. Discretionary for loans of $1,000,000 or less, or where the project will significantly affect an existing business's operations and historic cash flow | "An independent qualified consultant acceptable to the Agency"; scope set by the Agency | Economic, market, technical, financial and management feasibility, as outlined in appendix A to subpart D | 7 CFR 5001.306(a)(3), 5001.3 [2][5][6] |
| USDA REAP (grant, from 16 Oct 2026) | Rule, as an option. An RES applicant must file a Resource Assessment or may file a Feasibility Study in its place | Any RES project (EEI projects file an Energy Assessment or Energy Audit instead) | "An independent professional possessing relevant knowledge, expertise, and experience"; the RES developer conducting it is a listed conflict of interest | Economic, market, technical, financial and management analysis, recommendation, and consultant qualifications, itemized in § 4280.122(a)(8)(ii) | 91 FR 62600 [1] |
| USDA REAP (guaranteed loan) | Rule, discretionary. RES projects only, "when deemed necessary by the lender or Agency"; a technical report is always required | Lender or Agency judgment. Technical report format is tiered at $80,000 and $200,000 of total project cost | Consistent with the § 5001.3 definition (independent qualified consultant) | Appendix A to subpart D; technical report under § 5001.307(e) | 7 CFR 5001.307(d)-(e) [4] |
| USDA Community Facilities (guaranteed) | Rule. A financial feasibility report is always required; a full feasibility study above the trigger | Analysis or examination-opinion report on every guarantee; feasibility study for guarantees over $1,000,000 to a new entity or entity conducting a new activity | Analysis: a qualified firm or individual, who may be the lender. Examination opinion: AICPA attestation standards with professional liability insurance. Study: independent qualified consultant acceptable to the Agency | Appendix B to subpart D; senior-living projections capped at 90 percent occupancy | 7 CFR 5001.304 [3][7] |
| USDA Community Facilities (direct) | Rule. A financial feasibility report from every applicant | Every applicant; an independent report (guide 5) when the facility significantly affects the applicant's finances and depends on its own revenues, or when the Agency asks | A qualified firm or individual; for the guide 5 report, one "not having a direct interest in the management or construction of the facility" | Guides 5 to 10 (RD instruction; not read here, see VERIFY) | 7 CFR 1942.17(h)(1) [11] |
Three things stand out. First, a hard dollar trigger exists only in the USDA guaranteed rules. Second, independence is defined most tightly where the government carries the credit risk. Third, the bank regulators push the decision onto each bank's own board policy, and then examine whether the bank followed it.
Bank regulators: OCC, FDIC, Federal Reserve and NCUA
The legal hook: a written real estate lending policy
The four bank and credit union regulators do not tell a lender to order a feasibility study for any class of loan. What they do require, by rule, is a written policy. A national bank "shall adopt and maintain written policies that establish appropriate limits and standards" for real estate credit, approved by the board at least annually, with "prudent underwriting standards, including loan-to-value limits, that are clear and measurable" [16]. The FDIC rule for state non-member banks [18] and the Federal Reserve rule for state member banks [19] use nearly identical text. Each rule says the policy "should reflect consideration of" the Interagency Guidelines for Real Estate Lending Policies [16][18][19].
Those guidelines contain the sentence that matters most for this topic. For development and construction projects, and completed commercial properties, the policy "should also establish, commensurate with the size and type of the project or property", requirements for feasibility studies and sensitivity and risk analyses, with the example of "sensitivity of income projections to changes in economic variables such as interest rates, vacancy rates, or operating expenses" [17]. The same list asks for minimum hard equity, minimum standards for "net worth, cash flow, and debt service coverage," standards for interest reserves, pre-leasing and pre-sale requirements, and takeout commitments [17].
The board decides when a study is needed and what it must cover; the examiner tests whether that policy is adequate and was followed. A loan booked without a study the policy calls for is a policy exception to document and report. A policy that says nothing is a policy weakness. Neither breaks a regulation, but both draw findings. See conventional loan programs.
The guidelines also list the market factors a lending policy should take into account: demographic indicators, zoning, "current and projected vacancy, construction, and absorption rates," lease terms and rents including concessions, operating expenses, economic indicators and capitalization rates [17]. A competent market study covers exactly this list, which gives a reviewer a ready benchmark.
What the OCC Commercial Real Estate Lending booklet says
The OCC's guidance sits in the "Commercial Real Estate Lending" booklet of the Comptroller's Handbook, version 2.0, dated March 2022 [27][28]. It was issued by OCC Bulletin 2022-7, "Commercial Real Estate Lending: Revised Comptroller's Handbook Booklet and Rescissions," dated 29 March 2022. That bulletin replaced version 1.1 of the booklet (January 2017) and rescinded OCC Bulletin 2013-19, which had transmitted version 1.0 [29]. When a document cites "Bulletin 2022-7," this booklet is what it means.
The booklet is a supervisory document. It is the clearest statement any regulator has made on how a lender should treat a feasibility study:
- Feasibility is part of underwriting. The booklet names project feasibility as one of four underwriting components, alongside borrower and guarantor financial analysis, loan structuring and collateral valuation [28].
- Definition and source. Feasibility "describes the likelihood that the project as proposed will be economically successful." Studies "can be included as part of an independent appraisal or as a separate analysis" [28].
- Bias warning. "Feasibility studies commissioned by the borrower may be biased and should be critically reviewed" [28].
- The bank's own analysis. Even with a study in hand, "the bank should conduct its own analysis of the project," and the person doing that analysis "should have the requisite knowledge and skills to assess project feasibility" [28].
The booklet then sets out what a feasibility analysis of a construction project should contain. Those headings are a good outline for any study:
- Construction plans and budget. The budget and pro forma are "one of the most critical elements in determining project feasibility." Plans, schedules and geotechnical reports should be reviewed by a qualified person. Contingencies "usually range between 5 and 10 percent of the overall budget," and developer fees typically do not exceed 4 percent of project cost [28].
- Developer profit as a feasibility test. A development "that does not create this incentive (prospective market value is not sufficiently higher than its cost) is generally not feasible" [28]. A study showing costs close to or above stabilized value fails the OCC's own test, however good the market section is.
- Equity and loan-to-cost. Loan-to-cost should be evaluated alongside loan-to-value. A loan for partial construction without committed completion funds "is generally considered to be a liberal underwriting practice" [28].
- Preleasing and presales. These should be tested as bona fide, with meaningful deposits collected [28].
- Pro forma statements. "Credible pro forma projections are a key determinant of a project's feasibility." Assumptions must be reasonable against the market and comparable properties, and for unit-sale projects "the analysis should include stress testing" of absorption, interest rates and capitalization rates [28].
- Site analysis. Covers ingress and egress, dimensions, prior use, geology, topography, easements, utilities, zoning, development costs and environmental factors [28].
- Demographic analysis. Covers household formation and whether incomes support the projected rents, prices or retail mix [28].
- Market analysis. "A thorough market analysis is a critical component of the underwriting process." It covers supply and demand, comparable properties, effective rents, vacancy, starts and absorption. Its results "should support the revenue assumptions relied on in the pro forma." Speculative projects "should meet demand that exists at a point in the future rather than the demand that exists when development begins" [28].
For income-producing CRE, the booklet says rents, expenses, capital expenditures, vacancy, absorption and capitalization rates should each be "considered under both normal and stressed conditions" [28]. It defines the debt service coverage ratio as NOI divided by annual debt service. It notes that properties with volatile cash flows, "such as hotels or owner-occupants with uneven earnings, may warrant a higher ratio" [28]. It also treats debt yield (NOI divided by loan amount) as a rate-independent check, useful for sizing loans under higher-rate conditions [28]. The DSCR and debt yield calculator runs both measures on the same inputs.
Where the guidance turns "independent" into a condition
In two places the guidance makes independence a condition rather than a preference, and both concern collateral valuation for for-sale housing.
- Tract developments. For raw land to be valued as developed lots, "the feasibility study or the market analysis in the appraisal should support the absorption period" for the lots. Otherwise part of the tract should be valued as raw land [28].
- Small condominium projects and 12-month sellouts. A bank may rely on appraisals of the individual units, instead of a discounted bulk value, if it can show "through an independently obtained feasibility study or market analysis" that all units can be built and sold within 12 months [28][34]. The booklet adds that the study should be "conducted independently of the borrower and the bank" [28].
FDIC and Federal Reserve alignment
The FDIC's RMS Manual, Section 3.2 (Loans), version 05/23, lists warning signs of troubled real estate markets and projects. One of them is "Lack of any sound feasibility study or analysis" [36]. For land development loans, it says "Projections should be accompanied by a study explaining the effect of property improvements on the market value of the land" [36]. The FDIC's Construction and Land Development Lending core analysis procedures go further. Examiners are told to check whether ADC credit decisions consider feasibility studies that assess, where applicable, "economic and environmental issues," engineering surveys and tests, soil borings, adjacent properties, flood plain and water table, zoning, jurisdiction of other agencies, and water availability [37]. Where interest reserves are used, examiners "consider the reasonableness of the assumptions in the project's feasibility study and the time allotted for completion and lease-up" [37]. The procedures also list a "Feasibility study" among typical ADC loan file documents [37].
The Federal Reserve's real estate lending rule applies the same guidelines through appendix C to part 208 [19]. It transmitted the 2010 appraisal and evaluation guidelines in SR 10-16 [35], the CRE concentration guidance in SR 07-1 [31] and the 2023 workouts policy statement in SR 23-5 [33]. In practice, a state member bank and a national bank are held to the same feasibility expectations.
NCUA: a projection rule, not a study rule
Federally insured credit unions follow part 723, which is structured differently. The commercial loan policy must include underwriting standards that address, among other things, "Requirements of a borrower-prepared projection when historic performance does not support projected debt payments." The projection must be "supported by reasonable rationale and, at a minimum, must include a projected balance sheet and income and expense statement" [23]. The policy must also address collateral evaluation methods, including loan-to-value limits, and "analysis of the impact of current market conditions on the borrower" [23].
This is the only bank-side regulation that requires forward-looking financial analysis by rule. It asks for projections, not a market or technical analysis, but for a start-up or construction project the "reasonable rationale" standard is hard to meet without market evidence. NCUA also joined the 2023 workouts policy statement [32].
Supervisory loan-to-value limits
The supervisory LTV limits come from the interagency guidelines. They are supervisory expectations: a bank's internal limits "should not exceed" them [17].
| Loan category | Supervisory LTV limit |
|---|---|
| Raw land | 65% |
| Land development | 75% |
| Construction: commercial, multifamily (including condominiums and cooperatives) and other nonresidential | 80% |
| Construction: 1- to 4-family residential | 85% |
| Improved property | 85% |
| Owner-occupied 1- to 4-family and home equity | No limit set; at 90% or more LTV at origination, mortgage insurance or readily marketable collateral is expected |
Source: Interagency Guidelines for Real Estate Lending, 12 CFR part 34, subpart D, appendix A [17].
Four mechanics matter for feasibility work:
- For a loan that funds several phases, the limit is the one for "the final phase of the project funded by the loan," but disbursements "should not exceed actual development or construction outlays" [17].
- For a loan to buy an existing property, "value" is "the lesser of the actual acquisition cost or the estimate of value" [17].
- Loans above the limits are allowed if other credit factors support them, but they must be identified, reported to the board at least quarterly, and kept within an aggregate of 100 percent of total capital. Within that, commercial, agricultural, multifamily and other non-1-to-4-family loans should not exceed 30 percent of capital [17].
- Loans guaranteed or insured by the U.S. government are excluded from the limits, "provided that the amount of the guaranty or insurance is at least equal to the portion of the loan that exceeds the supervisory loan-to-value limit" [17]. This is why an SBA or USDA guarantee can support a structure a bank could not otherwise book. It does not lower the underwriting standard for the guaranteed loan itself.
The guidelines add a warning that applies directly to feasibility review. The limits "should not be interpreted to mean that loans at these levels will automatically be considered sound" [17]. A loan at 79 percent of an as-complete value still fails if the market study behind the rents is weak.
CRE concentration guidance (2006)
The interagency guidance "Concentrations in Commercial Real Estate Lending, Sound Risk Management Practices" was issued on 6 December 2006 as OCC Bulletin 2006-46 and published at 71 FR 74580 on 12 December 2006 [30][31]. It "does not establish specific limits on CRE lending" [30]. It sets out practices including market analysis and "portfolio stress testing and sensitivity analysis," plus two screening criteria that "may prompt further supervisory analysis" [28][30]:
- construction, land development and other land loans at 100 percent or more of total capital; or
- total non-owner-occupied CRE loans at 300 percent or more of total capital, with the CRE portfolio up 50 percent or more over the prior 36 months.
The OCC booklet states that "These criteria are not CRE lending limits" [28]. The link to feasibility work is market analysis: a study that ignores pipeline supply where the bank is already concentrated is a portfolio problem as well as a loan problem.
The 2023 policy statement on CRE accommodations and workouts
On 6 July 2023 the OCC, Federal Reserve, FDIC and NCUA published the final "Policy Statement on Prudent Commercial Real Estate Loan Accommodations and Workouts" at 88 FR 43115 [32]. It "supersedes the 2009 Statement for all supervised financial institutions" [32]. The Federal Reserve transmitted it in SR 23-5, which also superseded SR 09-7 [33].
It matters here for two reasons. First, among the actions an institution should take to avoid criticism for a workout, it lists analysis of "the borrower's global debt service coverage, including realistic projections of the borrower's cash flow" [32]. A restructuring is underwritten on forward-looking projections, which is a feasibility question even when no one calls it one. The FDIC lists the statement on its CRE lending page with its other CRE guidance [38]. Second, for a CRE loan in a workout, the institution "should consider the current project plans and market conditions in a new or updated appraisal or evaluation." Triggers include deterioration in project performance, variances between actual conditions and original appraisal assumptions, changes in project specifications (the example is "changing a planned condominium project to an apartment building"), loss of a major lease or takeout, and rising presale fallout [32]. Each trigger is a sign that the original feasibility conclusion no longer holds. When a project changes concept, an updated study is often the cleanest way to rebuild the credit file.
Appraisal, evaluation and feasibility study: three different documents
Credit files often treat an appraisal with a market section as if it were a feasibility study. The regulations draw the lines clearly.
| Appraisal | Evaluation | Feasibility study | |
|---|---|---|---|
| Question answered | What is the collateral worth (as is, as complete, as stabilized)? | What is the collateral worth, for transactions exempt from an appraisal? | Will the project, as proposed, succeed economically and generate enough cash to repay? |
| Legal basis | Rule: 12 CFR 34 subpart C; 12 CFR 323; 12 CFR 225 subpart G; 12 CFR 722 [14][20][21][22] | Rule requires one for certain exempt transactions [14][20]; content is a supervisory expectation in the 2010 Interagency Appraisal and Evaluation Guidelines [34] | No bank rule; supervisory expectation via the lending guidelines [17]; rule in USDA programs [2][3] |
| Preparer | State certified or licensed appraiser, by threshold [14] | Person who is qualified, competent and independent of the transaction and loan production [34] | Not set for banks; USDA requires an independent qualified consultant above its triggers [2][5] |
| Engagement | Fee appraiser "engaged directly by the regulated institution or its agent" [15]; a borrower-ordered appraisal "violates the Agencies' appraisal regulations" [34] | Institution or its agent should select and engage the preparer [34] | No rule for banks; borrower-commissioned studies "may be biased" [28] |
| Core output | Market value with USPAP-compliant support | Market value estimate with sufficient support for the credit decision [34] | Market demand, technical and site viability, pro forma, DSCR by year, break-even and sensitivity, management, conclusion |
Thresholds. For OCC- and FDIC-supervised banks and Federal Reserve-supervised institutions, a certified or licensed appraisal is required for real estate-related financial transactions unless an exemption applies. The exemptions include commercial real estate transactions of $500,000 or less, residential transactions of $400,000 or less, and business loans of $1 million or less that do not depend on the sale of, or rent from, real estate as the primary source of repayment [14][20][21]. Most of those exempt transactions still need an evaluation "consistent with safe and sound banking practices" [14]. A state certified appraiser is required for transactions of $1,000,000 or more, and for commercial real estate transactions of more than $500,000 [14]. For credit unions the structure differs. A state-certified appraisal is required for non-exempt transactions of $1,000,000 or more and for complex residential transactions where $400,000 or more is not government insured or guaranteed. Non-complex residential transactions at that level need a certified or licensed appraisal. Other transactions generally need a "written estimate of market value" by an independent, qualified person [22]. The NCUA rule was redesignated from § 722.3 to § 722.103 effective 1 October 2025 [22].
The government-guarantee exemption. The bank appraisal rules exempt transactions "wholly or partially insured or guaranteed by a United States government agency" [14][20]. This does not mean an SBA or USDA loan needs no appraisal. The program sets its own requirement. USDA's guaranteed loan rule, for example, requires real estate appraisals by an independent qualified appraiser, generally a State Certified General Appraiser, when collateral value exceeds $250,000 or the FIRREA limit. For construction projects it requires both the as-is and prospective values [9].
Why an appraisal is not a feasibility study. An appraiser's income approach values the real estate from market rents and capitalization rates. It does not test whether this borrower, with this management, capital structure and ramp-up, can cover this debt service in years one to three. The appraisal guidelines themselves treat "feasibility studies" as a separate cost to be deducted when valuing raw land for development [34], which shows the agencies regard them as different work products. The OCC booklet allows a feasibility study to be "included as part of an independent appraisal" [28]. A reviewer should accept that only when the appraisal actually contains the market, cost and cash-flow analysis a study would contain, not just a highest-and-best-use paragraph.
SBA 7(a) and 504 under SOP 50 10 8 and 8.1
What is rule and what is SOP
SBA's regulation sets the framework in three sentences that every SBA credit memo should reflect:
- "The applicant (including an Operating Company) must be creditworthy. Loans must be so sound as to reasonably assure repayment." Lenders and CDCs "must use appropriate and prudent generally acceptable commercial credit analysis processes and procedures consistent with those used for their similarly-sized, non-SBA guaranteed commercial loans" [24]. The criteria SBA and lenders may consider include credit history, "the earnings or cashflow of applicant," and equity or collateral [24]. SBA's lender pages put it as businesses that are "creditworthy and demonstrate a reasonable ability to repay the loan" [44].
- Among the loan conditions SBA normally imposes: "SBA may require professional appraisals of the applicant's and principals' assets, a survey, or a feasibility study" [25].
- For 504, the borrower contribution is a rule. It is at least 10 percent of project cost in general, at least 15 percent if the borrower (or Operating Company) "has operated for two years or less," at least 15 percent if the project involves "a limited or single purpose building or structure," and at least 20 percent if both apply [26].
That is the full codified feasibility mandate: SBA may require a study. The cases in which a study is mandatory, and the cases in which a business plan with projections is enough, are set in SOP 50 10, which is program guidance binding on SBA lenders and CDCs. For the regulation, the "comparable non-SBA loan" standard in § 120.150 is the strongest link back to the bank guidance. A bank whose own construction policy requires a feasibility study for a speculative hotel cannot apply a weaker standard to the same hotel because it carries an SBA guarantee [24].
Which SOP version governs
SBA's SOP 50 10 page lists Version 8.1, effective 1 October 2026, as current. The prior Version 8 is listed as effective 1 June 2025, and earlier versions back to 5 are archived [40]. Information Notice 5000-880695, "Issuance of SOP 50 10 8.1," was last updated 14 August 2026 and gives an effective date of 1 October 2026 [41]. The 2025 issuance was announced in Information Notice 5000-868665, "Issuance of SOP 50 10 8 with Technical Updates," with an effective date of 29 May 2025 [42]. Between the two versions, Procedural Notice 5000-872050 amended SOP 50 10 8 on citizenship and residency requirements, effective 19 December 2025 [43]. For a side-by-side reading of what moved between versions, see SOP 50 10 8 feasibility changes.
Access note. The SOP text itself is published only as a downloadable file in a directory this research could not open under the access rules that governed it. So this page does not quote SOP section numbers or SOP thresholds as fact. Every SOP-specific point an SBA lender needs (start-up treatment, change of ownership, special-purpose property, hotels and other high-risk industries, the DSCR test, 7(a) equity injection, appraisal and business valuation thresholds) is listed in VERIFY with the check to make. Treat any article, including this one, that quotes SOP 50 10 8.1 paragraph numbers without linking to the SOP as unverified until you have checked it against your copy.
How SBA lenders should frame the feasibility question
The analysis does not depend on the open SOP points.
- Repayment from cash flow is the test. The rule calls for loans "so sound as to reasonably assure repayment" and names "earnings or cashflow" as a criterion [24]. For an existing business with stable history, historic cash flow does most of the work. For a start-up, an expansion that changes the business model, or a project whose revenue depends on a market that does not yet exist at the site, the only evidence of repayment ability is a projection. At that point the question is whether the projection is supported.
- A business plan with projections is not a feasibility study. A borrower's business plan states what the borrower intends. A feasibility study tests whether the market, site, cost and operating assumptions behind the plan hold, and states a conclusion. Where SOP 50 10 8.1 accepts projections, the lender still has to underwrite them, which in practice means testing them against third-party market evidence.
- Start-ups and special-purpose property raise the bar in the rule itself. The 504 contribution steps (15 percent for a business operating two years or less, 15 percent for limited or single purpose property, 20 percent for both) are SBA's own judgment, written into regulation, that these risks need more equity [26]. A study for such a project should show that the larger equity cushion is enough under stress, not just that the base case works.
- Lender responsibility. Under delegated processing the lender makes the credit decision. A lender-ordered study with a reliance clause documents that decision; a borrower-supplied study without reliance is material the lender must still verify (see the independence section below).
- SBA's own review. For non-delegated loans SBA reviews the credit. Under § 120.160(b) SBA may itself require a feasibility study as a loan condition [25]. A lender that submits a project with a weak market case should expect that condition.
For the DSCR mechanics SBA lenders use, including the difference between historic and projected coverage, see DSCR for SBA and USDA loans and the SBA DSCR calculator comparing SOP 50 10 8 and 8.1. Program summaries are at SBA loan programs.
What an SBA-grade study must cover
Where SOP 50 10 8.1 requires a study it sets the formal content (see VERIFY). A study that meets the "comparable commercial loan" standard covers:
- a market area definition and demand analysis tied to the revenue line, with named competitors and pipeline supply;
- for hotels and similar going-concern real estate, an allocation of value between real estate, FF&E and intangibles, because business enterprise value "would not be used" in supervisory LTV calculations [28];
- monthly ramp-up to stabilization with working capital needs, so the injection and any working capital proceeds can be sized;
- annual DSCR for at least the first three to five years, computed on the same debt service the loan will carry;
- break-even occupancy or revenue, and the cushion between the base case and break-even;
- sensitivity on the variables that drive the result, at minimum revenue, the main cost ratio, interest rate for variable-rate loans, and ramp-up timing;
- management capacity, especially for a borrower new to the industry;
- a reasoned conclusion, not just a set of tables.
USDA Rural Development
USDA has the most explicit feasibility rules of any program covered here. They sit in regulation, so they are rules. The guaranteed loan programs (B&I, Community Facilities guaranteed, Water and Waste guaranteed and REAP guaranteed) share one regulation, 7 CFR part 5001, the "OneRD" guaranteed loan rule. The citations below are to the 2026 annual CFR edition (revised as of 1 January 2026). That edition shows the relevant sections were last amended on 30 September 2024 (89 FR 79717 to 79721) [2][3][4][8].
Definitions that drive everything
Three definitions in 7 CFR 5001.3 decide whether a study is required and what counts as one [5]:
- Feasibility study: "a report including an opinion or finding conducted by an independent qualified consultant(s) evaluating the economic, market, technical, financial, and management feasibility of the proposed project or operation in terms of its expectation for success as outlined in appendix A to subpart D of this part."
- New business: a business in operation for less than one full year, and a business in operation for at least one full year that "has not achieved full operational capacity or stable operations," including "a new enterprise or new affiliate of an existing business moving or expanding into a new location involving new market or labor areas."
- Existing business: in operation at least one full year and at full capacity or stable operations. Mergers, name changes and new-plus-existing co-borrowers are treated as existing businesses "provided there is not a significant change in operations."
The "new business" definition is broader than most lenders expect. A ten-year-old processor opening a second plant in a new labor market can be a new business for this purpose, and so can a two-year-old plant still ramping up. Getting this classification right is the first item in any B&I file review.
Section 5001.3 also defines the debt service coverage ratio: earnings before interest, taxes, depreciation and amortization, "less reasonably expected replacement capital expenditures," divided by annual principal and interest [5]. A study prepared for a USDA guarantee should compute DSCR this way. Using EBITDA without the capex deduction overstates coverage against the Agency's own definition.
B&I: the $1,000,000 new-business trigger
7 CFR 5001.306 sets the B&I application requirements. It splits applications at a guaranteed loan amount of $600,000 [2]:
- Over $600,000: the full application. Within it, § 5001.306(a)(3) provides that "The Agency may require a feasibility study when the lender's analysis, borrower's business plan, or project information is not sufficient to determine the technical feasibility, market feasibility, or economic viability of the project." Then [2]:
- (i) Mandatory. "For guaranteed loans greater than $1,000,000.00 to a new business, a feasibility study prepared by an independent qualified consultant acceptable to the Agency is required. The scope of the feasibility study will be determined by the Agency and is dependent on the complexity of the project and the borrower."
- (ii) Discretionary. For loans of $1,000,000 or less, to new or existing businesses, the Agency may require one where the information is insufficient, "or if the project will significantly affect the operations of a borrower who is an existing business and its historic cash flow."
- (iii) Technical report. Required for renewable energy systems identified in § 5001.307(e) "and for projects utilizing other integrated processing equipment and systems." It "can be provided in the technical feasibility section of a feasibility study or in a separate technical report."
- $600,000 or less: a streamlined application, available only if "the Agency determines that the lender's analysis, borrower's business plan, or other project or borrower information submitted by the lender is sufficient to determine the technical feasibility, market feasibility, and economic viability of the project" [2].
Four points of interpretation follow from the text:
- The trigger is the guaranteed loan amount, not total project cost and not the guaranteed portion. A $3,000,000 project financed with a $900,000 guaranteed loan to a new business is under the mandatory line. It is still within the Agency's discretion under (ii).
- "Acceptable to the Agency" means the Agency can reject a consultant. Lenders should confirm acceptability with the state office before the engagement, not after the report is delivered.
- Scope is set by the Agency "dependent on the complexity of the project and the borrower" [2]. A generic template study does not meet this by default.
- The lender must evaluate the study. § 5001.202(b)(6)(ii) requires the lender's credit evaluation to include "A written evaluation of the feasibility study, business plan, technical report, and engineering and architectural reports, as applicable" [8]. Attaching the study to the application is not enough. The credit memo has to engage with it.
Section 5001.202 also tells the reviewer what to look for. Capacity includes "the feasibility and likelihood of the project and borrower to produce sufficient revenues to service the project's debt obligations over the life of the guaranteed loan" [8]. Conditions lists feedstock and resource markets, off-take agreements, competition, infrastructure, "Technical feasibility including demonstrated performance of the technology," construction complexity and contractor strength, permits, and counterparty credit. It names the feasibility study and market study as supporting documents [8]. Projections that depart from history "must be substantiated and documented" [8]. Projects seeking the guarantee before construction is complete need quarterly operational cash flow through start-up or occupancy, tied to the construction schedule [8]. Applications with affiliates need a global analysis, including "if applicable a global historical and projected debt service coverage analysis" [8].
Appendix A to subpart D ("Feasibility Study Components") is the content standard the definition points to [5][6]. In the official CFR text it is reproduced as images rather than text, so its line items are not quoted here (see VERIFY). The definition fixes the five pillars (economic, market, technical, financial and management), and the 2026 REAP rule's itemized feasibility study content [1], drafted by the same agency for the same purpose, is a reasonable working proxy until you have checked appendix A directly.
REAP: grants under the October 2026 rule, and guaranteed loans
REAP now runs under two rule sets, and they treat feasibility studies differently.
REAP grants (7 CFR 4280 subpart B). The final rule "Unleashing American Energy and Economic Prosperity; Rural Energy for America Program (REAP)" was published at 91 FR 62600 on 1 October 2026. It is a final rule with comment period: effective 16 October 2026, comments due 2 November 2026, RIN 0570-AB13 [1]. The citation in the brief for this page is correct. The rule changes the program to a "post completion, performance validated model": projects "must already be fully built and operational before the applicant ever applies," with 12 months of actual production or savings data [1]. For feasibility work it makes five changes:
- Revised definition. A feasibility study is "a report, conducted by an independent professional possessing relevant knowledge, expertise, and experience, that includes an opinion or finding evaluating the economic, market, technical, financial, and management feasibility of a proposed Project or operation located at a specific site in terms of its expectation for success" [1]. The preamble explains that the change clarifies the preparer's qualifications and ties the findings to a specific site [1].
- Role in the application. Under § 4280.131(b)(3), "For RES Projects, the Applicant must provide a Resource Assessment, or the Applicant can provide a Feasibility Study in lieu of a Resource Assessment" [1]. EEI projects instead file an Energy Assessment (project cost of $80,000 or less) or an Energy Audit [1]. So for grants a feasibility study is an alternative way to show technical sustainability, not a dollar-triggered mandate.
- Content moved into the rule text. Appendices A to D (the technical report appendices and "Contents of Feasibility Study") are removed. Feasibility study content is now itemized in § 4280.122(a)(8)(ii) [1]. It covers an economic analysis (minimum inputs, contracts, environmental risks, cost relative to revenues or benefits, overall economic impact); a market analysis (competition, project type, target market, end-user analysis, by-product revenue, industry risk); a technical analysis (commercial availability, success record, provider experience, infrastructure, transport, labor, materials, technology age and reliability, construction risk); a financial analysis of twelve items ending with "Sensitivity analysis"; a management analysis; the preparer's recommendation; and the consultant's qualifications [1].
- Conflict of interest. Feasibility studies are listed among transactions that can create a conflict of interest, and the rule's own example is "The RES developer conducts the Feasibility Study" [1]. "No conflict of interest will be allowed" [1].
- Dollar thresholds that remain. These attach to other documents, not the study. Agreements must be submitted for projects over $80,000, and for projects of $200,000 or more the Agency requires a completion certificate from a professional engineer licensed in the state [1].
Before this rule, § 4280.116 said the Agency "may require a feasibility study" for RES projects based on the project's scope relative to the applicant's operations, or when the application or technical report was insufficient, "prepared by a qualified and independent third party" [12]. The technical report could be provided "in the technical feasibility section of the feasibility study, when required" [13]. The old rule did not set a dollar threshold for the study either. The $80,000 and $200,000 figures in the removed appendices governed technical report formats [1]. Many secondary summaries describe a "$200,000 feasibility study threshold" for REAP grants. Neither the pre-2026 text read for this page [12] nor the 2026 rule [1] supports that as a rule for the study itself.
REAP guaranteed loans (7 CFR 5001.307). The 2026 grant rule confirms that "REAP guaranteed loans will follow provisions outlined in 7 CFR 5001," and that an applicant may apply separately for a guaranteed loan and a grant for the same project, subject to the 75 percent combined funding cap [1]. Under § 5001.307 [4]:
- Feasibility study: "For RES projects only, when deemed necessary by the lender or Agency," conforming to the § 5001.3 definition and appendix A.
- Technical report: required for all projects. It may be supplied in the technical feasibility section of a study, and it is tiered by total project cost. At $80,000 or less, a vendor/installer-certified report under § 5001.307(e)(1)(v). For EEI over $80,000, appendix C. For RES over $80,000 and below $200,000, appendix D. For RES of $200,000 or more, appendix E.
- Named technologies (hydrogen, ocean energy, geothermal electric, anaerobic digesters and biogas, biomass, hybrids, systems with storage, and energy efficiency improvements) must provide technical reports under the detailed provisions [4].
Community Facilities: guaranteed and direct
CF guaranteed (7 CFR 5001.304). Every CF guarantee requires "a financial feasibility report prepared by a qualified firm or individual acceptable to the Agency" [3]. Projections must cover operation and maintenance, debt payments and lender reserves, and must reflect any interest rate adjustment the note allows [3]. Then come the specific rules:
- Occupancy cap. "Financial projections for projects that are assisted living facilities, skilled nursing facilities, or similar types of eligible residential facilities must be based on no more than 90 percent occupancy" [3].
- Utility projects must base forecasts on user estimates "supported by either a State statute or local ordinance requiring mandatory hookup or signed and enforceable user agreements" [3].
- Business-dependent facilities. If the facility's success depends on a business that is its primary user, "the economic viability of that business must also be assessed" [3].
- Two report types [3]:
- a financial feasibility analysis, which "may be the lender" and can be the lender's own credit evaluation if it covers appendix B. It is used for guarantees of $25 million or less to existing community facilities, guarantees secured by general obligation bonds or sufficient tax-supported income, and borrowers whose last three years of audited statements show capacity for all existing and new debt; and
- a financial feasibility study with examination opinion, prepared under AICPA attestation standards by a preparer with professional liability insurance, for every guarantee that does not qualify for the analysis.
- Feasibility study trigger. As in B&I, "For guaranteed loans greater than $1,000,000.00 to a new entity or an entity conducting a new activity, a feasibility study prepared by an independent qualified consultant acceptable to the Agency is required." The Agency may require one at or below $1,000,000 [3].
Appendix B to subpart D ("Financial Feasibility Reports") sets the content. Like appendix A, it appears as images in the CFR text and is listed in VERIFY [7].
CF direct loans (7 CFR 1942.17). The direct program has its own rule, read here in the 2025 annual edition. All projects must be supported by taxes, assessments, revenues or fees "sufficient to provide for facility operation and maintenance, a reasonable reserve, and debt payment," and if a business is the primary user, its viability must be assessed [11]. "All applicants will be expected to provide a financial feasibility report prepared by a qualified firm or individual." This normally comes either as part of the preliminary engineering or architectural report (guides 6 to 10), or, prepared by "a qualified firm or individual not having a direct interest in the management or construction of the facility" using guide 5, when the project will significantly affect the applicant's finances and depends on its own revenues, or when Rural Development requests it [11].
How USDA reviews the study
The rules give the Agency three formal levers: it decides whether the consultant is "acceptable," it sets the scope, and it may require a study below the mandatory triggers [2][3]. In REAP grants, the Agency judges technical sustainability from the information in the study [1]. In practice the Agency reviews the study through the lender's written evaluation of it, which § 5001.202(b)(6)(ii) makes mandatory [8]. A lender that simply forwards a consultant's report without its own written assessment has not met the rule. The USDA program pages and staff instructions that describe state-office review practice could not be opened for this research (see VERIFY).
| USDA program | Study mandatory when | Agency may require when | Preparer standard | Content source |
|---|---|---|---|---|
| B&I guaranteed | Guaranteed loan > $1,000,000 to a new business | ≤ $1,000,000, or project significantly affects an existing business, or information is insufficient | Independent qualified consultant acceptable to the Agency | 5001.3; app. A to subpt. D [2][5][6] |
| CF guaranteed | Guaranteed loan > $1,000,000 to a new entity or new activity; a financial feasibility report always | ≤ $1,000,000 if information is insufficient | Study: independent qualified consultant. Analysis: qualified firm or individual, may be the lender. Examination opinion: AICPA attestation | 5001.304; app. B [3][7] |
| CF direct | A financial feasibility report always; guide 5 report in defined cases | On Agency request | Qualified firm or individual; guide 5 preparer has no direct interest in management or construction | 1942.17(h) [11] |
| REAP grant (from 16 Oct 2026) | Never mandatory; an RES applicant may file one instead of a Resource Assessment | Not applicable | Independent professional; RES developer conflict barred | 4280.122(a)(8)(ii), 4280.131(b)(3) [1] |
| REAP guaranteed | Not mandatory | RES projects, when the lender or Agency deems it necessary | Per 5001.3 definition | 5001.307(d); app. A [4] |
What a study a lender can rely on contains
Put the rules and guidance above together and a reliable study has six parts. The framework is described more fully in the bankable feasibility study framework and the financial projections methodology. What follows is the reviewer's version.
Market feasibility. A defined trade or market area. Demand drivers, with demographic and employment evidence. Existing competitive supply with rates and occupancy or sales volumes. Pipeline supply, from permits and starts. Absorption or capture assumptions tied to that evidence. The OCC's test is whether the market results "support the revenue assumptions relied on in the pro forma," measured against demand at the projected opening date, not today [28].
Technical and site feasibility. Site suitability, access, utilities, zoning, environmental and geotechnical factors [28][37]. A review of the construction budget, schedule and contingency [28]. For process or energy projects, technology track record, commercial availability and reliability [1][8]. For USDA renewable energy projects, the technical report content required by § 5001.307(e) or the rule's technical analysis items [1][4].
Financial feasibility. Development and operating pro formas with stated assumptions. Sources and uses with the equity contribution. Monthly or quarterly cash flow through ramp-up where construction or start-up is involved [8]. Annual DSCR for each projection year, computed on the program's definition. Break-even revenue or occupancy. Sensitivity and stress on the drivers, as the lending guidelines expect [17], examiners look for [28][37] and the REAP rule lists [1].
Management feasibility. Ownership and governance, the experience of the principals and any management company, and the qualifications needed to run the project [1][8].
Conclusion. A stated opinion or finding on the project's "expectation for success," which both USDA definitions require [1][5]. A set of tables with no conclusion is not a feasibility study under either definition.
Independence and reliance terms. The preparer's qualifications [1]. A statement of independence from the borrower, developer, contractor and equipment vendor [1][5]. An engagement letter naming who engaged the preparer. Where the lender is not the client, a reliance letter.
Element-to-requirement map
| Study element | Rule that asks for it | Guidance or expectation that asks for it |
|---|---|---|
| Market demand, competition, absorption | 5001.3 definition (market feasibility) [5]; 4280.122(a)(8)(ii)(B) [1]; 5001.202(b)(5)(ii) [8] | Lending guidelines market factors [17]; OCC market analysis [28] |
| Site, zoning, environmental, geotechnical | 5001.202(b)(5)(iii) [8] | OCC site analysis [28]; FDIC CLD procedures [37] |
| Construction budget, schedule, contingency | 5001.202(b)(5)(v), (b)(6)(vi) [8] | OCC construction plans and budget [28] |
| Technology and process reliability | 5001.306(a)(3)(iii), 5001.307(e) [2][4]; 4280.122(a)(8)(ii)(C) [1] | FDIC engineering and soils items [37] |
| Pro forma with substantiated assumptions | 5001.202(b)(6)(iv) [8]; 723.4(f)(3) for credit unions [23] | OCC pro forma statements [28] |
| Ramp-up cash flow, quarterly where seasonal or under construction | 5001.202(b)(6)(v)-(vi) [8] | OCC unit-sale cash flow timing [28] |
| DSCR by year, program definition | 5001.3 DSCR definition [5]; 5001.202(b)(2) [8] | Lending guidelines DSC standards [17]; OCC DSCR [28] |
| Sensitivity and stress | 4280.122(a)(8)(ii)(D)(12) [1] | Lending guidelines [17]; OCC stress testing [28]; concentration guidance [30] |
| Occupancy cap (senior living, CF) | 5001.304 (90 percent) [3] | None |
| Business viability of a primary user | 5001.304, 5001.305(c) [3][10]; 1942.17(h) [11] | None |
| Management analysis | 4280.122(a)(8)(ii)(E) [1]; 5001.202(b)(1) [8] | OCC developer evaluation [28] |
| Independent preparer | 5001.3, 5001.306(a)(3)(i), 5001.304(a)(4)(i) [2][3][5]; 4280.104 and conflict of interest rules [1] | OCC bias warning; independent study for 12-month sellouts [28][34] |
| Preparer qualifications stated | 4280.122(a)(8)(ii)(G) [1] | OCC "requisite knowledge and skills" (for the bank's analyst) [28] |
| Written lender evaluation of the study | 5001.202(b)(6)(ii) [8] | OCC: the bank "should conduct its own analysis" [28] |
Lender-ordered versus borrower-ordered studies
This is where practice and rule diverge most. The facts are these.
What the rules actually say about who engages the preparer. For appraisals, the bank rules are explicit. A fee appraiser "shall be engaged directly by the regulated institution or its agent" [15], and the 2010 guidelines state that "An institution's use of a borrower-ordered or borrower-provided appraisal violates the Agencies' appraisal regulations" [34]. The guidelines extend the same expectation to evaluations and say that "Independence is compromised when a borrower recommends an appraiser" [34]. No equivalent rule exists for feasibility studies in the bank regulations. The OCC's position is a supervisory caution that borrower-commissioned studies "may be biased and should be critically reviewed" [28]. The single exception is the tract and condominium valuation shortcut, which requires a study "conducted independently of the borrower and the bank" [28].
USDA. The B&I and CF guaranteed rules require an "independent qualified consultant acceptable to the Agency" above the triggers [2][3]. They do not say who must engage the consultant. The REAP grant rule takes another route: it bans conflicts of interest outright and gives the RES developer conducting the study as an example of one [1]. The CF direct rule requires, for the guide 5 report, a preparer "not having a direct interest in the management or construction of the facility" [11]. The CF examination-opinion report must follow AICPA attestation standards, with professional liability insurance in place [3].
SBA. The regulation does not address who orders a study [25]. Any SOP provision is listed in VERIFY.
Who pays. None of the rules reviewed here says whether the lender or the borrower must pay for a study. In REAP grants, "Feasibility studies" appear in the rule's list of costs that grant funds do not cover (see VERIFY for the paragraph). Fee arrangements otherwise come down to the engagement letter and the program's rules on eligible costs.
| Question | Lender-ordered study | Borrower-ordered study |
|---|---|---|
| Is it permitted? | Yes, in every program covered | Yes in every program covered, subject to USDA independence and conflict rules [1][2][3] |
| Independence from the borrower | Strongest evidence | Must be shown: preparer has no interest in the project, developer, contractor or vendor [1][5] |
| Reliance | Lender is the client; reliance runs to the lender | Requires a reliance letter naming the lender (and, where relevant, the Agency) |
| Examiner treatment | Still subject to the bank's own analysis [28] | "May be biased and should be critically reviewed" [28] |
| Valuation shortcuts that need an independent study | Qualifies, if independent of the bank's loan production [28] | Does not qualify where the guidance requires independence "of the borrower and the bank" [28] |
| USDA acceptability | Agency must accept the consultant above the trigger [2][3] | Same; Agency must accept the consultant |
In practice: if a regulator or agency will test the decision the study supports, engage the preparer directly, or obtain a reliance letter and an independence statement first. For a guide to judging the preparer, see how to evaluate a feasibility study consultant.
Credit officer's review checklist
Use the checklist in order. Items 1 to 6 decide whether the document is usable at all. The rest test whether its conclusion holds.
| # | Item | What good looks like | Red flag |
|---|---|---|---|
| 1 | Program and trigger | File states which rule or policy requires the study and why (e.g. B&I new business, guaranteed loan > $1,000,000) [2] | No statement of why the study exists or which standard it must meet |
| 2 | New vs existing business classification | Classification argued against the 5001.3 definitions, including the "full operational capacity" test and new-location expansions [5] | Expansion into a new labor market treated as "existing" without analysis |
| 3 | Preparer independence | Written statement of no interest in borrower, developer, contractor, vendor or financing [1][5] | Preparer is the developer, installer or equipment seller; or the preparer's fee depends on closing |
| 4 | Preparer qualifications | Qualifications stated and relevant to the property type and technology [1] | Generic credentials; no prior work in the sector |
| 5 | Agency acceptability (USDA) | State office confirmed consultant acceptability before engagement [2][3] | Consultant chosen after the Agency asked for a study, with no confirmation |
| 6 | Engagement and reliance | Engagement letter names the client; reliance letter to the lender (and Agency if needed) | Report "for the borrower's internal use only" |
| 7 | Effective date and data vintage | Market data dated within the period relevant to the project; date of report stated | Data two or more years old in a moving market; no dates |
| 8 | Market area definition | Market area defined with reasons (drive time, competitive set, service area) | Market area drawn to include favorable demographics only |
| 9 | Demand evidence | Demand drivers quantified with sources (population, employment, traffic, demand generators) | Demand asserted from national trends |
| 10 | Competitive supply | Named competitors with rates, occupancy or volumes | "Limited competition" with no list |
| 11 | Pipeline supply | Permits, starts and announced projects tested against demand at opening [28] | Supply analysis stops at today's inventory |
| 12 | Absorption or ramp-up | Absorption tied to comparable lease-ups or sellouts [28] | Stabilization in year one for a new concept |
| 13 | Pricing | Rates or prices reconciled to comparables, with concessions [17] | Pricing above the top of the competitive set without a stated reason |
| 14 | Site and zoning | Zoning, access, utilities and environmental status confirmed [28][37] | Zoning "expected"; utilities "available" without a source |
| 15 | Construction budget | Line-item budget reviewed by a qualified person; hard and soft costs separated [28] | Lump-sum budget; no third-party review |
| 16 | Contingency | Contingency sized to complexity; the OCC notes 5 to 10 percent is usual [28] | Zero contingency, or contingency used to fund equity |
| 17 | Developer profit and fees | Value clearly exceeds cost; developer fee within the norms the OCC describes [28] | Cost at or above as-complete value [28] |
| 18 | Technology risk | Commercial availability, performance record, warranties and O&M covered [1][4][8] | Pilot-scale technology projected at commercial uptime |
| 19 | Sources and uses | Ties to the loan request, equity and other funds; equity timing stated [28] | Uses exceed sources; equity "to be determined" |
| 20 | Equity contribution | Meets program rule (e.g. 504 tiers) and survives stress [26] | Equity met only through land valued at appraisal with no cash in |
| 21 | Revenue build | Revenue built from units × rate × occupancy or volume × price, by period | Revenue as a top-line growth rate |
| 22 | Operating expenses | Expense ratios benchmarked to comparable operations and industry data [8] | Expense ratio far below peers with no explanation |
| 23 | Replacement capex | Reasonably expected replacement capex deducted where the program defines DSCR that way [5] | DSCR on EBITDA with no capex deduction in a USDA file |
| 24 | Debt service | Debt service matches the proposed loan: rate, amortization, interest-only period, guarantee fees | Study sized on different loan terms from the commitment |
| 25 | DSCR by year | Annual DSCR shown for each year from opening to stabilization and beyond | Only a stabilized-year DSCR |
| 26 | Break-even | Break-even revenue or occupancy stated and compared with the base case | No break-even shown |
| 27 | Sensitivity | Single-variable sensitivity on revenue, main cost driver, rate and ramp-up [17][28] | Sensitivity of ±5 percent only, or none |
| 28 | Combined stress | At least one combined downside case | Only single-variable cases |
| 29 | Program-specific caps | Program caps applied (e.g. 90 percent occupancy for CF senior living) [3] | Senior living projected at 95 percent in a CF file |
| 30 | Working capital and reserves | Working capital through ramp-up; reserves the loan or program requires [3][8] | Year-one deficit with no funded reserve |
| 31 | Interest reserve | Reserve sized from the study's lease-up timeline; assumptions reasonable [37] | Reserve sized to the construction period only |
| 32 | Management | Experience mapped to the specific operation; management agreement terms reviewed [1][8] | First-time operator with no third-party manager |
| 33 | Affiliates and global cash flow | Global projected DSCR where affiliates are involved [8][32] | Affiliates' obligations omitted |
| 34 | Contracts and off-take | Feedstock, off-take, PPA or franchise terms tested, with counterparty credit [8] | Revenue depends on an unsigned off-take |
| 35 | Conclusion | Explicit opinion on feasibility, with conditions [1][5] | No conclusion, or "feasible subject to financing" |
| 36 | Consistency with appraisal | Rents, occupancy and timing consistent with the appraisal, or differences explained | Study and appraisal disagree on stabilized NOI by a wide margin with no reconciliation |
Common deficiencies that get a study rejected or sent back
Each deficiency below fails a specific rule or expectation. The citation tells the reviewer which.
- No conclusion. Both USDA definitions require "an opinion or finding" on the project's expectation for success [1][5]. A data compilation does not qualify.
- Preparer not independent. In REAP grants, a study conducted by the RES developer is the rule's own example of a prohibited conflict [1]. Under B&I and CF guarantees the consultant must be "independent" and "acceptable to the Agency" [2][3].
- Wrong trigger analysis. A file treats a new location or a business not yet at stable operations as an "existing business," avoiding the mandatory B&I study [2][5].
- Projections not substantiated. Revenue or margins well above history, with no support, fail § 5001.202(b)(6)(iv) [8] and the OCC pro forma standard [28].
- Present-day supply only. For construction projects, the OCC expects demand to be measured "at a point in the future" [28].
- No stress testing. The lending guidelines expect sensitivity of income projections to interest rates, vacancy and operating expenses [17]. The REAP rule lists sensitivity analysis as a required financial item [1].
- DSCR on the wrong definition. A USDA file uses EBITDA without deducting replacement capex, contrary to § 5001.3 [5].
- Ramp-up ignored. Construction-period guarantees require quarterly cash flow through start-up or occupancy [8].
- Occupancy above the cap. CF senior living projections above 90 percent breach § 5001.304 [3].
- Budget not reviewed. Construction budgets "that lack detail or appear to be overly optimistic should be thoroughly evaluated" [28].
- Cost exceeds value. A development without adequate developer profit "is generally not feasible" [28].
- Technical risk unaddressed. A B&I or REAP file with process equipment and no technical report or technical section breaches §§ 5001.306(a)(3)(iii) and 5001.307(e) [2][4].
- Lender did not evaluate the study. Forwarding a study without a written evaluation fails § 5001.202(b)(6)(ii) [8]. It is also contrary to the OCC expectation that the bank conduct its own analysis [28].
- Business viability of the anchor user ignored. CF and WWD facilities that depend on one business require that business's viability to be assessed [3][10][11].
- Reliance not established. A borrower-ordered report with a no-reliance clause is weak support for a credit decision the examiner will test [28].
Worked example: from sensitivity results to a DSCR test
All inputs below are illustrative assumptions, not program requirements and not data from any real project. They show the arithmetic a reviewer should be able to reproduce from any study.
Case A: a B&I-style guarantee to a new business. A new rural processing facility. Project cost $6,000,000. Guaranteed loan $4,800,000 at 7.5 percent, 25-year amortization, level monthly payments: annual debt service $425,659. Borrower equity $1,200,000 (20 percent). The guaranteed loan is over $1,000,000 and the borrower is a new business, so a feasibility study by an independent qualified consultant is required [2]. DSCR follows § 5001.3: EBITDA less reasonably expected replacement capex, divided by annual debt service [5].
Assumptions: stabilized revenue $3,100,000. Ramp-up at 80, 92 and 100 percent of stabilized revenue in years 1 to 3. Revenue and expenses grow 2.5 percent a year. Variable costs 39 percent of revenue. Fixed operating costs $880,000 in year 1. Replacement capex 3 percent of revenue. The DSCR tests are an illustrative lender policy minimum of 1.25x and the 1.00x break-even line. Neither figure is an SBA or USDA requirement stated in this article.
| Scenario | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Lowest | Below 1.25x? | Below 1.00x? |
|---|---|---|---|---|---|---|---|---|
| Base case | 1.31 | 1.77 | 2.05 | 2.10 | 2.16 | 1.31 | No | No |
| Revenue −10% | 0.97 | 1.38 | 1.63 | 1.67 | 1.71 | 0.97 | Year 1 | Year 1 |
| Revenue −20% | 0.64 | 0.99 | 1.21 | 1.24 | 1.27 | 0.64 | Years 1–4 | Years 1–2 |
| Variable costs +5 points | 1.02 | 1.43 | 1.69 | 1.73 | 1.77 | 1.02 | Year 1 | No |
| Fixed costs +10% | 1.11 | 1.56 | 1.83 | 1.88 | 1.93 | 1.11 | Year 1 | No |
| Rate +200 bp (debt service $503,249) | 1.11 | 1.49 | 1.74 | 1.78 | 1.82 | 1.11 | Year 1 | No |
| Ramp-up delayed one year | 1.31 | 1.26 | 1.71 | 2.10 | 2.16 | 1.26 | No | No |
| Combined: revenue −10% and rate +200 bp | 0.82 | 1.17 | 1.38 | 1.41 | 1.45 | 0.82 | Years 1–2 | Year 1 |
Base case detail for year 1: revenue $2,480,000, EBITDA $632,800, replacement capex $74,400, so DSCR = ($632,800 − $74,400) / $425,659 = 1.31x. Break-even points: in year 1, revenue of $2,251,136 (90.8 percent of the year-1 base) gives 1.00x, and $2,434,610 (98.2 percent) gives 1.25x. In year 3, revenue would have to fall 24.9 percent below the base case to reach 1.00x, and 19.0 percent to reach 1.25x.
How a credit officer should read this:
- The stabilized-year DSCR (2.05x) is not the credit question. Year 1 is. The base case clears 1.25x by only 0.06x, and a 1.8 percent revenue shortfall in year 1 erases that margin.
- The binding risk is ramp-up, not the long-run market. By year 3 the project absorbs a 19 percent revenue shortfall before reaching 1.25x. That points the structure toward year-1 support (a funded debt service or working capital reserve, interest-only months, or a larger equity cushion) rather than a smaller loan sized on stabilized coverage.
- Combined stress shows the real exposure. Revenue 10 percent below plan with a 200 bp rate increase gives two years under 1.25x. On a variable-rate structure this is the case to size reserves against.
- The study must show these numbers, not just the base case. The lending guidelines' call for "sensitivity of income projections to changes in economic variables" [17] and the REAP rule's "Sensitivity analysis" item [1] are both met only by a table like this one, on the actual loan terms.
Case B: a program cap that binds. A 60-unit assisted living facility financed with a CF guarantee. Loan $11,000,000 at 6.5 percent, 30-year amortization: annual debt service $834,330. Monthly rate $5,200 per unit. Operating expenses 66 percent of revenue. All figures are illustrative.
| Occupancy assumption | Revenue | NOI | DSCR |
|---|---|---|---|
| 95% (sponsor's projection) | $3,556,800 | $1,209,312 | 1.45x |
| 90% (maximum permitted by § 5001.304) | $3,369,600 | $1,145,664 | 1.37x |
The rule requires projections for assisted living and similar residential facilities to be "based on no more than 90 percent occupancy" [3]. A study that underwrites 95 percent is non-compliant whatever the market data says. On these assumptions, break-even occupancy is 65.5 percent at 1.00x and 81.9 percent at 1.25x. The difference between the capped occupancy and the 1.25x break-even, 8.1 points, is the cushion the reviewer should report.
Fuller worked examples are in the model studies: 110-key extended-stay hotel, Virginia (SBA 504), hemp processing facility, Kentucky (USDA B&I) and rural health clinic, Arkansas (USDA CF).
Change log, 2024 to November 2026
| Date | Change | Effect on feasibility work | Source |
|---|---|---|---|
| 7 Aug 2024 (effective 1 Oct 2025) | Interagency quality control standards for automated valuation models (89 FR 64538; OCC Bulletin 2024-17) | Residential valuation rule; no direct effect on commercial feasibility studies. NCUA appraisal rule redesignated § 722.103 from 1 Oct 2025 | [22][39] |
| 30 Sep 2024 | Amendments to 7 CFR part 5001 (89 FR 79717–79721), including §§ 5001.202, .304, .305, .306 and .307 | Current text of the B&I and CF feasibility triggers, lender evaluation duties and REAP guaranteed technical reports | [2][3][4][8] |
| 29 May 2025 / 1 Jun 2025 | SOP 50 10 8 with technical updates (Information Notice 5000-868665) | New SBA origination baseline; SOP specifics in VERIFY | [40][42] |
| 19 Dec 2025 | Procedural Notice 5000-872050 (citizenship and residency) | Eligibility, not feasibility | [43] |
| 31 Mar 2026 | REAP stakeholder announcement discontinuing processing of pending grant applications (as described in the 2026 rule) | Pending applicants must reapply under the new rule | [1] |
| 14 Aug 2026 (effective 1 Oct 2026) | SOP 50 10 8.1 issued (Information Notice 5000-880695) | Current SBA SOP for applications from 1 Oct 2026; specifics in VERIFY | [40][41] |
| 1 Oct 2026 (effective 16 Oct 2026) | REAP final rule with comment, 91 FR 62600 | Feasibility study redefined; contents moved into § 4280.122(a)(8)(ii); appendices A–D removed; study is an alternative to a Resource Assessment; post-completion model | [1] |
| No change found | Supervisory LTV limits; appraisal thresholds for commercial real estate ($500,000) and business loans ($1,000,000); OCC CRE booklet v2.0 (March 2022); 2006 concentration guidance; 2023 workouts statement | Unchanged in the 2026 CFR text and agency pages read for this article | [14][17][27][30][32] |
Sources and methodology
This page uses only primary sources: the Code of Federal Regulations (official GPO annual edition, 2026 where available, otherwise 2025, as noted in the sources list), Federal Register documents, and OCC, FDIC, Federal Reserve, NCUA and SBA publications, each opened on 3 November 2026. Each statement is labelled as rule, program guidance or supervisory expectation. Points that could not be confirmed in a primary source are not stated as fact. The worked-example figures were computed in Python from the stated illustrative assumptions with standard level-payment amortization. The page makes no claims about any firm's experience or outcomes. A lender that wants an independent study prepared under these standards can request one here.
How we apply these requirements in recent engagements
Every study FSC Consulting, Inc. issues is signed by Sarrah Allen, MAI, and scoped to the rules above: the USDA Part 5001 components and the $1,000,000 new-business trigger, SBA's "may require" standard under SOP 50 10 8.1, and the bank regulator expectation that the lender can analyze feasibility itself. Recently completed feasibility studies include:
- USDA B&I hotel, Gaffney, South Carolina: an 80-room hotel tested against the B&I new-business study requirement.
- USDA B&I travel center, Winnie, Texas: fuel, store and truck services modeled for a guaranteed lender.
- 110-key extended-stay hotel, Virginia, SBA 504: bank loan and CDC debenture coverage tested together.
- Hemp processing facility, Kentucky, USDA B&I: a new-business processing plant with market and technical risk.
- Rural health clinic, Arkansas, USDA Community Facilities: a financial feasibility report for a CF guarantee.
- Limited-service hotel, SBA 504 and conventional and veterinary hospital, SBA 7(a).
Need a study your credit committee and the Agency will accept? See our SBA feasibility study consultant and USDA feasibility study consultant services, or request a fixed-fee scope.
Frequently asked questions
Does the OCC require a feasibility study for construction loans?
No regulation requires one. 12 CFR 34.62 requires a board-approved real estate lending policy, and the interagency guidelines say that policy should set "requirements for feasibility studies and sensitivity and risk analyses" for development, construction and completed commercial property [16][17]. The OCC's CRE booklet expects the bank to determine project feasibility and to "conduct its own analysis" even when a study exists [28]. FDIC and Federal Reserve banks are held to the same guidelines [18][19].
When is a feasibility study mandatory for a USDA B&I guarantee?
When the guaranteed loan is greater than $1,000,000 and the borrower is a new business as defined in 7 CFR 5001.3. The study must be prepared by "an independent qualified consultant acceptable to the Agency," with scope set by the Agency [2][5]. Below that amount, or for an existing business whose operations and historic cash flow the project will significantly affect, the Agency may still require one [2].
Does "new business" in the B&I rule mean a start-up?
It is broader. It covers businesses operating less than one full year, businesses operating longer that have not reached full operational capacity or stable operations, and new enterprises or affiliates of an existing business expanding into a new location with new market or labor areas [5].
Is there still a $200,000 feasibility study threshold in REAP?
Not for the study itself. Under the rule effective 16 October 2026, an RES grant applicant files a Resource Assessment or may file a Feasibility Study instead, and the $200,000 figure attaches to the professional engineer completion certificate [1]. For REAP guaranteed loans, $80,000 and $200,000 set technical report formats, and a study is required only "when deemed necessary by the lender or Agency" [4].
What must a REAP feasibility study contain now?
Section 4280.122(a)(8)(ii) itemizes economic, market, technical, financial (including sensitivity analysis) and management analyses, the preparer's recommendation, and the consultant's qualifications. The preparer must be an independent professional with relevant knowledge, expertise and experience, and a study conducted by the RES developer is a prohibited conflict of interest [1].
Does SBA require a feasibility study for a start-up 7(a) loan?
The regulation says only that SBA "may require" a feasibility study [25], alongside the general requirement that loans be "so sound as to reasonably assure repayment" [24]. When SOP 50 10 8.1 makes a study mandatory, and when projections are enough, must be checked in the SOP itself; this article does not state SOP thresholds as fact.
How much equity does a 504 project need when the business is new or the building is special purpose?
At least 15 percent of project cost if the borrower or Operating Company has operated for two years or less, at least 15 percent for a limited or single purpose building, and at least 20 percent if both apply. Otherwise at least 10 percent [26].
Can an appraisal serve as the feasibility study?
The OCC says a study "can be included as part of an independent appraisal or as a separate analysis" [28]. An appraisal that values the real estate but does not test the borrower's debt service through ramp-up does not answer the feasibility question. USDA defines a study as a separate report with an opinion on the project's expectation for success [5].
Can a lender rely on a study the borrower commissioned?
No rule forbids it for feasibility studies, unlike appraisals, where borrower-ordered reports violate the appraisal regulations [34]. The OCC warns that borrower-commissioned studies "may be biased and should be critically reviewed" [28]. USDA requires an independent consultant acceptable to the Agency above its triggers [2][3]. A reliance letter and an independence statement are the minimum.
What occupancy can a USDA CF senior living projection assume?
No more than 90 percent for assisted living, skilled nursing and similar residential facilities [3].
Which DSCR definition should a USDA study use?
EBITDA less reasonably expected replacement capital expenditures, divided by annual principal and interest, per 7 CFR 5001.3 [5]. The lender's credit evaluation must be supported by a cash flow analysis and must include a written evaluation of the study [8].
Do the 2006 CRE concentration thresholds limit how much CRE a bank can make?
No. The 100 percent and 300 percent criteria identify banks for further supervisory analysis; the OCC states they "are not CRE lending limits" [28][30].
Sources
- [1]U.S. Government Publishing Office (Federal Register), Rural Business-Cooperative Service, "Unleashing American Energy and Economic Prosperity; Rural Energy for America Program (REAP)," final rule with comment period, 91 FR 62600 (1 October 2026), https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm, accessed 2026-11-03
- [2]GPO, Code of Federal Regulations (2026 ed.), 7 CFR 5001.306, Specific application requirements for B&I projects, https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec5001-306.xml, accessed 2026-11-03
- [3]GPO, CFR (2026 ed.), 7 CFR 5001.304, Specific application requirements for CF projects, https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec5001-304.xml, accessed 2026-11-03
- [4]GPO, CFR (2026 ed.), 7 CFR 5001.307, Specific application requirements for REAP projects, https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec5001-307.xml, accessed 2026-11-03
- [5]GPO, CFR (2026 ed.), 7 CFR 5001.3, Definitions, https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec5001-3.xml, accessed 2026-11-03
- [6]GPO, CFR (2026 ed.), 7 CFR part 5001, subpart D, appendix A, Feasibility Study Components, https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001-subpartD-appA.xml, accessed 2026-11-03
- [7]GPO, CFR (2026 ed.), 7 CFR part 5001, subpart D, appendix B, Financial Feasibility Reports, https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001-subpartD-appB.xml, accessed 2026-11-03
- [8]GPO, CFR (2026 ed.), 7 CFR 5001.202, Lender's credit evaluation, https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec5001-202.xml, accessed 2026-11-03
- [9]GPO, CFR (2026 ed.), 7 CFR 5001.203, Appraisals, https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec5001-203.xml, accessed 2026-11-03
- [10]GPO, CFR (2026 ed.), 7 CFR 5001.305, Specific application requirements for WWD projects, https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec5001-305.xml, accessed 2026-11-03
- [11]GPO, CFR (2025 ed.), 7 CFR 1942.17, Community facilities (direct loans), https://www.govinfo.gov/content/pkg/CFR-2025-title7-vol13/xml/CFR-2025-title7-vol13-sec1942-17.xml, accessed 2026-11-03
- [12]GPO, CFR (2026 ed.), 7 CFR 4280.116 (text in force before the 16 October 2026 REAP rule), https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec4280-116.xml, accessed 2026-11-03
- [13]GPO, CFR (2026 ed.), 7 CFR 4280.117 (text in force before the 16 October 2026 REAP rule), https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-sec4280-117.xml, accessed 2026-11-03
- [14]GPO, CFR (2026 ed.), 12 CFR 34.43, Appraisals required; transactions requiring a State certified or licensed appraiser (OCC), https://www.govinfo.gov/content/pkg/CFR-2026-title12-vol1/xml/CFR-2026-title12-vol1-sec34-43.xml, accessed 2026-11-03
- [15]GPO, CFR (2026 ed.), 12 CFR 34.45, Appraiser independence (OCC), https://www.govinfo.gov/content/pkg/CFR-2026-title12-vol1/xml/CFR-2026-title12-vol1-sec34-45.xml, accessed 2026-11-03
- [16]GPO, CFR (2026 ed.), 12 CFR 34.62, Real estate lending standards (OCC), https://www.govinfo.gov/content/pkg/CFR-2026-title12-vol1/xml/CFR-2026-title12-vol1-sec34-62.xml, accessed 2026-11-03
- [17]GPO, CFR (2026 ed.), 12 CFR part 34, subpart D, appendix A, Interagency Guidelines for Real Estate Lending, https://www.govinfo.gov/content/pkg/CFR-2026-title12-vol1/xml/CFR-2026-title12-vol1-part34-subpartD-appA.xml, accessed 2026-11-03
- [18]GPO, CFR (2025 ed.), 12 CFR 365.2, Real estate lending standards (FDIC), https://www.govinfo.gov/content/pkg/CFR-2025-title12-vol6/xml/CFR-2025-title12-vol6-sec365-2.xml, accessed 2026-11-03
- [19]GPO, CFR (2026 ed.), 12 CFR 208.51, Real estate lending standards (Federal Reserve), https://www.govinfo.gov/content/pkg/CFR-2026-title12-vol2/xml/CFR-2026-title12-vol2-sec208-51.xml, accessed 2026-11-03
- [20]GPO, CFR (2026 ed.), 12 CFR 323.3, Appraisals required (FDIC), https://www.govinfo.gov/content/pkg/CFR-2026-title12-vol5/xml/CFR-2026-title12-vol5-sec323-3.xml, accessed 2026-11-03
- [21]GPO, CFR (2025 ed.), 12 CFR 225.63, Appraisals required (Federal Reserve), https://www.govinfo.gov/content/pkg/CFR-2025-title12-vol3/xml/CFR-2025-title12-vol3-sec225-63.xml, accessed 2026-11-03
- [22]GPO, CFR (2025 ed.), 12 CFR 722.3, Appraisals and written estimates of market value requirements (NCUA), https://www.govinfo.gov/content/pkg/CFR-2025-title12-vol7/xml/CFR-2025-title12-vol7-sec722-3.xml, accessed 2026-11-03
- [23]GPO, CFR (2025 ed.), 12 CFR 723.4, Commercial loan policy (NCUA), https://www.govinfo.gov/content/pkg/CFR-2025-title12-vol7/xml/CFR-2025-title12-vol7-sec723-4.xml, accessed 2026-11-03
- [24]GPO, CFR (2026 ed.), 13 CFR 120.150, What are SBA's lending criteria?, https://www.govinfo.gov/content/pkg/CFR-2026-title13-vol1/xml/CFR-2026-title13-vol1-sec120-150.xml, accessed 2026-11-03
- [25]GPO, CFR (2026 ed.), 13 CFR 120.160, Loan conditions, https://www.govinfo.gov/content/pkg/CFR-2026-title13-vol1/xml/CFR-2026-title13-vol1-sec120-160.xml, accessed 2026-11-03
- [26]GPO, CFR (2026 ed.), 13 CFR 120.910, Borrower contributions (504), https://www.govinfo.gov/content/pkg/CFR-2026-title13-vol1/xml/CFR-2026-title13-vol1-sec120-910.xml, accessed 2026-11-03
- [27]Office of the Comptroller of the Currency, Comptroller's Handbook, "Commercial Real Estate Lending" booklet page, https://www.occ.gov/publications-and-resources/publications/comptrollers-handbook/files/commercial-real-estate-lending/index-commercial-real-estate-lending.html, accessed 2026-11-03
- [28]Office of the Comptroller of the Currency, Comptroller's Handbook, "Commercial Real Estate Lending," version 2.0 (March 2022), https://www.occ.gov/publications-and-resources/publications/comptrollers-handbook/files/commercial-real-estate-lending/pub-ch-commercial-real-estate.pdf, accessed 2026-11-03
- [29]Office of the Comptroller of the Currency, OCC Bulletin 2022-7, "Commercial Real Estate Lending: Revised Comptroller's Handbook Booklet and Rescissions" (29 March 2022), https://www.occ.gov/news-issuances/bulletins/2022/bulletin-2022-7.html, accessed 2026-11-03
- [30]Office of the Comptroller of the Currency, OCC Bulletin 2006-46, "Concentrations in Commercial Real Estate Lending, Sound Risk Management Practices" (6 December 2006), https://www.occ.gov/news-issuances/bulletins/2006/bulletin-2006-46.html, accessed 2026-11-03
- [31]Board of Governors of the Federal Reserve System, SR 07-1, "Interagency Guidance on Concentrations in Commercial Real Estate" (4 January 2007), https://www.federalreserve.gov/boarddocs/srletters/2007/SR0701.htm, accessed 2026-11-03
- [32]GPO (Federal Register), OCC, Federal Reserve, FDIC and NCUA, "Policy Statement on Prudent Commercial Real Estate Loan Accommodations and Workouts," 88 FR 43115 (6 July 2023), https://www.govinfo.gov/content/pkg/FR-2023-07-06/html/2023-14247.htm, accessed 2026-11-03
- [33]Board of Governors of the Federal Reserve System, SR 23-5, "Prudent Commercial Real Estate Loan Accommodations and Workouts" (30 June 2023), https://www.federalreserve.gov/supervisionreg/srletters/SR2305.htm, accessed 2026-11-03
- [34]GPO (Federal Register), "Interagency Appraisal and Evaluation Guidelines," 75 FR 77450 (10 December 2010), https://www.govinfo.gov/content/pkg/FR-2010-12-10/html/2010-30913.htm, accessed 2026-11-03
- [35]Board of Governors of the Federal Reserve System, SR 10-16, "Interagency Appraisal and Evaluation Guidelines" (2 December 2010), https://www.federalreserve.gov/boarddocs/srletters/2010/sr1016.htm, accessed 2026-11-03
- [36]Federal Deposit Insurance Corporation, RMS Manual of Examination Policies, Section 3.2, Loans (05/23), https://www.fdic.gov/regulations/safety/manual/section3-2.pdf, accessed 2026-11-03
- [37]Federal Deposit Insurance Corporation, Construction and Land Development Lending, Core Analysis Procedures, https://www.fdic.gov/risk-management-manual-examination-policies/construction-and-land-development-lending.pdf, accessed 2026-11-03
- [38]Federal Deposit Insurance Corporation, "Commercial Real Estate Lending" guidance page (last updated 19 December 2025), https://www.fdic.gov/credit/commercial-real-estate-lending, accessed 2026-11-03
- [39]Office of the Comptroller of the Currency, OCC Bulletin 2024-17, "Quality Control Standards for Automated Valuation Models: Final Rule" (17 July 2024), https://www.occ.gov/news-issuances/bulletins/2024/bulletin-2024-17.html, accessed 2026-11-03
- [40]U.S. Small Business Administration, "SOP 50 10 Lender and Development Company Loan Programs" document page, https://legacy.sba.gov/document/sop-50-10-lender-development-company-loan-programs (redirected from https://www.sba.gov/document/sop-50-10-lender-development-company-loan-programs), accessed 2026-11-03
- [41]U.S. Small Business Administration, Information Notice 5000-880695, "Issuance of SOP 50 10 8.1," https://legacy.sba.gov/document/information-notice-5000-880695-issuance-sop-50-10-81, accessed 2026-11-03
- [42]U.S. Small Business Administration, Information Notice 5000-868665, "Issuance of SOP 50 10 8 with Technical Updates," https://legacy.sba.gov/document/information-notice-5000-868665-issuance-sop-50-10-8-technical-updates, accessed 2026-11-03
- [43]U.S. Small Business Administration, Procedural Notice 5000-872050, "Update to SOP 50 10 8 - Citizenship and Residency Requirements," https://legacy.sba.gov/document/procedural-notice-5000-872050-procedural-notice-5000-872050-update-sop-50-10-8-citizenship-residency-requirements, accessed 2026-11-03
- [44]U.S. Small Business Administration, "7(a) loan program: terms, conditions, and eligibility" (lender page), https://www.sba.gov/partners/lenders/7a-loan-program/terms-conditions-eligibility, accessed 2026-11-03
About the author
Sarrah Allen, MAI is the Principal of FSC Consulting, Inc. and a Member of the Appraisal Institute. She signs every study the practice issues: independent, lender-facing feasibility studies for SBA 7(a) and 504, USDA B&I, Community Facilities and REAP and conventionally financed projects.
- Studies built for 8 capital sources: SBA, USDA, bank, CMBS, life company, agency, HUD/FHA and mezzanine.
- Every engagement scoped against the same 15-criterion bankable checklist, with 4 review passes before delivery.
- Lead analyst and senior reviewer both sign the certification page; $1 million E&O coverage.
- No operator advisory on any property evaluated for 24 months.
See recently completed feasibility studies or read more about the practice.
Related guidance and studies
Consultant services
Regulatory and program references
- Lender requirements matrix
- Regulatory references
- SOP 50 10 8.1 update
- SBA 7(a) and 504 loan programs
- USDA B&I, CF and REAP programs
- Conventional bank financing
- Bank construction loans
- SOP 50 10 8 feasibility changes
- SOP 50 10 8.1 and the consultant
- SOP 50 10 8.1 projections evidence
- SBA vs USDA feasibility studies
- Reliance, certification and liability
DSCR and methodology
- DSCR for SBA and USDA loans
- SBA 7(a) DSCR under SOP 50 10 8.1
- SBA 504 combined DSCR test
- Bankable feasibility study framework
- Financial projections methodology
- Market analysis methodology
- Feasibility study vs market study
- Feasibility study document checklist
- How to evaluate a consultant
- SBA DSCR calculator
- DSCR and debt yield calculator
Recently completed feasibility studies
- USDA B&I hotel, Gaffney, South Carolina
- USDA B&I travel center, Winnie, Texas
- Limited-service hotel, SBA 504
- Veterinary hospital, SBA 7(a)