Model study · USDA REAP

    On-Farm Dairy Digester in Lancaster County, Pennsylvania: A USDA REAP Model Study

    By Sarrah Allen, MAI, Principal · Updated

    Model study: an illustrative feasibility analysis built on public data for Lancaster County, Pennsylvania; not a client engagement.

    Project summary

    ItemModelled project
    AssetOn-farm complete-mix anaerobic digester with a 499 kWe engine-generator and heat recovery, co-digesting dairy manure with food-processing residuals
    Size1,500 lactating cows plus 9,125 tons per year of off-farm residuals; 3.56 million kWh per year gross potential, 3.20 million kWh modelled at stabilization
    LocationA rural dairy in Lancaster County, Pennsylvania, in the PPL Electric Utilities service area (site not named)
    ProgramUSDA REAP: guaranteed loan under 7 CFR part 5001 [1] and a post-completion grant under 7 CFR part 4280 subpart B, as rewritten effective October 16, 2026 [2]
    Total project cost$4,365,674
    Loan structureREAP guaranteed loan $2,285,000 (52.3% of cost), 80% guaranteed, 7.75% fixed (assumption), 12 months interest-only, then 15-year amortization; equity $2,080,674 (47.7%)
    Stabilized DSCR1.25x in Years 3 to 10 (sized to this); 1.18x in Year 2; 1.63x if a $500,000 grant is won and applied to principal
    IRRUnlevered 3.5%, levered -3.0% (10-year hold, exit at 15% cap rate); 4.4% and 0.9% over a 20-year life
    DeterminationFinanceable at about half of cost with conditions (feedstock contracts, engine service contract, liquidity covenant, dairy guaranty); not financeable at the 75% REAP ceiling (0.87x); thin owner return

    The credit question

    A dairy digester is three businesses at once: a biology plant, an electricity seller and a small waste-handling business. The loan has to survive all three. A lender reviewing a file like this must be convinced of five things.

    First, that the feedstock is real and controlled. In Lancaster County, six of the seven operating digesters in EPA's AgSTAR database co-digest food wastes [3]. The modelled project follows that pattern. A quarter of its revenue and about a third of its energy depend on residuals the dairy does not produce and must contract for.

    Second, that the electricity has a buyer at a known price. Under PPL's net metering rider, a customer-generator's output is credited at the full retail rate up to the electricity delivered to it, excess carries forward, and kilowatt-hours left at the end of the PJM planning year on May 31 are paid at the rate schedule's price to compare [4]. That is valuable but regulated, and PPL's generation charge resets twice a year [5]. The modelled plant generates about 227% of the farm's load, so more than half its kilowatt-hours earn the price to compare.

    Third, that the plant will run. AgSTAR lists 98 U.S. livestock digesters as shut down. Among the 87 with opening and closing years, the median life was five years, and "too costly to operate" is among the recorded reasons [3]. A stopped digester pays no debt and has almost no resale market.

    Fourth, that the federal program fits the cash needs. USDA's October 1, 2026 rule makes REAP grants post-completion: the project must be built and operating before the owner applies, with 12 months of actual production data [2]. The grant can no longer fund construction. USDA's preamble points applicants to the REAP guaranteed loan under 7 CFR part 5001 for up-front costs [2].

    Fifth, that the debt is sized to what the plant earns. REAP allows a guaranteed loan up to 75% of eligible project costs [1]. At that level this plant would cover debt service 0.87 times. The gap between the program ceiling and the bankable loan is the central finding.

    Location and county economy

    The county economy matters indirectly here. A digester does not sell to households. But the economy explains why the county has so many livestock farms, why food residuals are available to co-digest, and why land near the City of Lancaster may not count as rural for the grant.

    IndicatorLancaster CountyPennsylvaniaSource
    Population, July 1, 2025563,15913,059,432[6]
    Change since April 2020 estimates base+1.84%+0.44%[6]
    Median household income, 2024 (SAIPE)$85,829$77,532[7]
    People in poverty, all ages, 2024 (SAIPE)7.7%11.6%[7]
    Private employment, 2023 (County Business Patterns)249,379n/a[8]
    Manufacturing employment, 202340,080 (16.1% of private employment)n/a[8]
    Food manufacturing employment, 20238,697n/a[8]
    City of Lancaster population, July 1, 2025 (Census estimate)58,366 (57,983 at the April 2020 estimates base)n/a[9]

    Population. The county grew about four times faster than the state after 2020 [6]. In 2025, natural increase (1,428) and international migration (975) outweighed a domestic outflow of 1,319 [6]. Growth supports farmland values and local food processing, but it also brings homes closer to farms. The state's digestion general permit sets a 300-foot setback between waste storage or processing areas and occupied dwellings unless the owner waives it [10].

    Income and labor. Median household income is about 11% above the state's [7]. Food manufacturing alone employed 8,697 people at county establishments in 2023 [8]. Staffing is a cost risk for a plant that needs a trained operator every day, so the model budgets $35,000 a year for dedicated digester labor.

    Feedstock base. The state's list of the county's 50 largest employers includes Pepperidge Farm, Tyson Poultry, Turkey Hill Dairy and Four Seasons Produce [11]. That shows only that food processing is a large local industry. This model study assumes no relationship with any named firm, and a lender would need executed supply agreements.

    Rural status. REAP's rural definition excludes cities over 50,000 people and the urbanized area contiguous to them [2]. The City of Lancaster's April 2020 estimates base was 57,983 and its July 2025 estimate 58,366 [9]. A farm near its edge could fail the grant's rural test, although part 5001 allows an agricultural producer to be located in either a rural or a non-rural area [1].

    Market analysis

    For a digester, market analysis means two questions: is there enough feedstock, and is there a buyer for the energy?

    Feedstock supply: the farm's own herd

    The feedstock is the farm's own herd. The 2022 Census of Agriculture county tables, the standard measure of a county's dairy herd and its trend, were not used in this model study, so it makes no claim about the size or direction of Lancaster County's herd. The model assumes a 1,500-cow lactating herd. That is larger than any dairy listed with an operating digester in the county in EPA's AgSTAR file, where dairy herds range from 250 to 1,225 cows [3].

    Three credit points follow. The herd's scale is what makes on-farm generation plausible. Imported manure from other farms is not a dependable backup, because it depends on other owners' decisions. And the herd itself is the first-order risk: AgSTAR records closures where "the dairy operations ceased" [3]. The loan has to be analyzed as a dairy credit, not as a stand-alone plant.

    Existing supply: digesters already operating

    AgSTAR benchmark (data through June 2024)ValueSource
    U.S. livestock digesters: operational / under construction / shut down400 / 73 / 98[12], [3]
    Median years operated before shutdown (87 with dates)5[3]
    U.S. under construction: CNG / pipeline gas / electricity only34 / 32 / 1[3]
    Pennsylvania: operational / construction / shut down30 / 1 / 3[3]
    Pennsylvania end use: cogeneration / electricity / pipeline gas21 / 9 / 1[3]
    Lancaster County operational digesters7 (6 co-digest food wastes; herds of 250 to 1,225 cows)[3]
    Lancaster electricity output range688,373 to 3,354,762 kWh per year[3]
    U.S. dairy-only, manure-only output (n=70)median 4.18 kWh per cow per day (IQR 2.61 to 5.66)[3]
    U.S. dairy-only, co-digestion output (n=60)median 5.28 kWh per cow per day (IQR 3.41 to 10.61)[3]

    The per-cow figures are this model study's calculations from EPA's project file: annual electricity divided by dairy herd and 365, for operational projects listing only dairy animals [3]. EPA notes the database is not exhaustive [12].

    Pennsylvania's farm digesters are almost all power projects (30 of 31 active entries), while the national construction pipeline has moved to renewable natural gas [3]. For the six dairy-only Lancaster projects, this model study calculates 2.29 to 8.36 kWh per cow per day, with a median near 4.84. The modelled design of 6.5 kWh per cow per day sits between the national co-digestion median and upper quartile [3]. The break-even analysis shows the loan breaks even at 4.78, above the manure-only median of 4.18. A manure-only version of this plant would not carry this loan.

    Demand method: feedstock-to-energy build

    StepModelled valueBasis
    Manure-only potential2,288,550 kWh per year1,500 cows x 4.18 kWh x 365 [3]
    Co-digestion residuals9,125 tons per year (25 tons per day; 18% of input mass)Assumption
    Co-digestion increment1,270,200 kWh per year (139.2 kWh per ton)Brings design to 6.5 kWh per cow per day
    Gross potential3,558,750 kWh per year81.4% capacity factor on 499 kWe
    Stabilized performance factor90% (Year 1 75%, Year 2 88%)Assumption
    Stabilized gross generation3,202,875 kWh (average 366 kW)Calculation
    Parasitic load8%: 256,230 kWhAssumption
    Net generation2,946,645 kWhCalculation
    Farm load offset1,300,000 kWhAssumption
    Year-end excess at price to compare1,646,645 kWhNet minus load
    Net generation as share of farm load226.7%Calculation

    The 139.2 kWh per ton increment is an assumption. A REAP technical report for a digester must include tabular values or laboratory biodegradability analysis to produce daily, monthly and seasonal gas estimates [1]. A lender should require that lab work on the actual residuals.

    The energy buyer: net metering, AECs and the policy stack

    Revenue elementCurrent rule (verified)Treatment in this model
    Net metering eligibilityCustomer-generators on PPL's GS-1, GS-3 and LP-4 schedules up to 3,000 kW (3 MW to 5 MW in defined cases) [4]499 kWe (assumption)
    CreditingFull retail rate up to electricity delivered; excess carried forward; kWh left at the end of the PJM planning year (May 31) paid at the rate schedule's price to compare [4]Offset $0.125/kWh in Year 1; excess $0.100/kWh
    Utility price signalPPL small general service generation $0.09443/kWh from June 1, 2026 ($0.08956 a year earlier); transmission $0.03303/kWh [5]$0.12746/kWh used as a price-to-compare proxy
    Alternative energy creditsTier I eligibility of farm biogas and AEC ownership by the farm are model assumptions; Tier I average $29.29/MWh in 2024/2025, $6.41 in 2018/2019 [13]$15/MWh less 10% broker fee
    Renewable electricity RINsRemoved from the RFS, effective June 15, 2026 [14]None
    Cellulosic RIN market2025 cellulosic volume waived to 1.21 billion RINs; 2025 waiver credit $1.91 [14], [15]RNG alternative only
    Section 45ZClean transportation fuel sold January 1, 2025 to December 31, 2029; feedstocks from the United States, Mexico or Canada after 2025 [16]Not applicable to electricity
    REAP grantPost-completion; RES maximum $500,000; Cost Sharing at least 75% [2]Upside case only

    Two 2026 changes shape this stack. EPA's RFS rule for 2026 and 2027 removed renewable electricity as a qualifying fuel [14], which ends the prospect of RINs for a power digester. And the REAP rewrite turns the grant into a reward for performance rather than a construction source [2]. Both changes push value toward gas projects or toward debt sized without subsidy.

    Net metering is the anchor. For a small general service farm account, PPL's variable charges are mostly generation and transmission, $0.12746 per kWh in July 2026 [5]. Distribution is billed largely on demand ($5.156 per kW for GS3) [5], which a generator does not reliably reduce. The model values offset at $0.125 in 2028 with 1.0% escalation and excess at a flat $0.100, a 22% discount for the semiannual price reset [5] and for policy risk on 1.6 million kWh of yearly excess. AECs are the most volatile line, ranging from $6.41 to $31.01 per MWh over seven years [13], so the model uses $15.

    The alternative pathway: renewable natural gas

    FactorElectricity with net metering (modelled)RNG to pipeline (not modelled)
    Price basisRegulated retail rate and price to compare [4], [5]Henry Hub: 2025 average $3.53/MMBtu; February to September 2026 average $3.02; January 2026 $7.72 [17]
    Environmental valueTier I AECs [13]; eRINs removed [14]D3 RINs with prices published by EPA [18]; 2025 waiver credit $1.91 [15]; 45Z through 2029 [16]
    Added capitalNone beyond the engineUpgrading, compression, pipeline interconnect (assumption: several million dollars)
    REAP fitRenewable energy system under the grant rule [2]Not assessed in this model study
    Lender's main concernNet metering resetMerchant RIN price and annual EPA volume decisions [14]

    RNG earns more per unit of gas because RINs are worth far more than AECs. But it adds an upgrading plant, a pipeline connection whose cost depends on distance to a main, and revenue set by annual EPA rules. The 2025 waiver credit, computed as an inflation-adjusted $3.00 less average wholesale gasoline [15], can act as a ceiling on D3 prices in waiver years. This model study keeps the power case because it matches what Lancaster dairies run [3] and rests on a tariff rather than a commodity price. An RNG option would need its own pro forma and RIN stress cases.

    Forecast

    Year 1 (2028) runs at 75% of potential, with residual contracts at 70% of tons. Year 2 reaches 88% and 90%. From Year 3 the plant holds 90% of potential and full tons. Revenue grows only through escalation: 1.0% on offset power, 2.0% on tipping fees and 2.5% on heat and bedding. Excess power and AECs stay flat. No herd growth is assumed.

    Site and technical

    Site. The digester has to sit near the freestall barns to keep manure transfer short, with room for a 7-day residual storage tank, a separator building next to the bedding area, and the engine near three-phase service. The general permit keeps waste storage and processing out of the 100-year floodplain, at least 100 feet from wetlands, 300 feet from occupied dwellings unless the owner waives it in writing, and generally 50 feet from property lines [10]. In a growing county, the dwelling setback often decides the site.

    Permits. Co-digestion requires DEP general permit WMGM042, issued August 18, 2022 and expiring August 18, 2032. It authorizes on-farm digestion of animal manure mixed with grease trap waste and pre-consumer and post-consumer food waste [10]. Operators must register under the permit, incoming municipal and residual waste may be stored up to seven days, and processed material must be sampled every 80 to 100 days with records kept five years [10]. If fats, oils and grease push digestate above 15,000 mg/l, it cannot be used as a soil additive [10], which matters for a farm that spreads digestate on its own fields. The budget also covers an engine air permit or exemption, an updated nutrient management plan, township zoning and the PPL interconnection application. Those were not verified for a specific site.

    Technology. A heated complete-mix vessel is the dominant design in Pennsylvania (21 of 31 active entries) and in all seven Lancaster projects [3]. It handles the variable solids of co-digestion better than plug flow. Gas passes through a biological hydrogen sulfide scrubber, carbon polishing and a chiller to a 499 kWe lean-burn engine with heat recovery. Recovered heat warms the digester first, so only the surplus displaces farm fuel, worth $20,000 a year. A screw press produces bedding, and a flare burns gas during outages.

    Construction. A fixed-price engineering, procurement and construction contract with a performance guaranty fits what the loan's technical report must cover for projects of $200,000 or more: design and engineering, project development, procurement and installation, and operations and maintenance [1]. For the grant, the application must document the installer's state license, how many similar systems it has installed and how the key service provider was selected [2]. Because the grant now comes after completion, an owner who ignores those requirements during construction can weaken the grant application before it is filed.

    PhaseTiming (modelled)Credit significance
    Resource assessment, lab work, feasibility study, technical reportQ4 2026 to Q1 2027Grant Project Period of no more than 24 months [2]
    Feedstock agreements, interconnection application, WMGM042 registrationQ1 2027Closing conditions
    Guaranteed loan application and conditional commitmentQ1 to Q2 2027Technical report under 7 CFR 5001 appendix E [1]
    ConstructionJanuary to December 202712 months; interest capitalized
    Commercial operation (Year 1)January 2028Project Period must end within 30 days of installation [2]
    REAP grant application2029, 12 to 24 months after the Project Period ends12 months of production data [2]
    Grant prepayment (upside case)Start of Year 3 (2030)Applied to principal

    The Project Period may not exceed 24 months [2]. This schedule keeps it to about 15 months.

    Development budget and sources and uses

    Capital costs are assumptions; no public source prices a Lancaster co-digestion plant. The total is $2,910 per cow and $8,749 per kW. A lender should require two fixed-price bids and an independent engineer's review.

    Line itemAmountShare of total
    Complete-mix digester vessel, insulation, gas-tight cover, mixers, heating loop$1,350,00030.9%
    Manure collection changes, reception pit, transfer pumps and piping$250,0005.7%
    Co-digestion receiving tank and 7-day covered storage$180,0004.1%
    Solids separation (screw press), bedding pad and roof$230,0005.3%
    Biogas conditioning: biological H2S scrubber, carbon polish, chiller, blower, gas storage$200,0004.6%
    499 kWe engine-generator with heat recovery and enclosure$750,00017.2%
    Electrical: switchgear, protective relaying, dedicated revenue meter$200,0004.6%
    Utility-side interconnection upgrades paid to the utility$80,0001.8%
    Backup flare$50,0001.1%
    Site work, foundations, access road, stormwater$160,0003.7%
    Hard cost subtotal$3,450,00079.0%
    Construction contingency (8% of hard cost)$276,0006.3%
    Engineering, design, construction administration, PE completion certificate$240,0005.5%
    Permits: WMGM042, air, nutrient plan, zoning, interconnection$45,0001.0%
    Technical report (7 CFR 5001 appendix E) and feasibility study$45,0001.0%
    Environmental review, geotechnical, survey$35,0000.8%
    Legal and closing$40,0000.9%
    Start-up: seeding, commissioning, initial scrubber media$45,0001.0%
    Working capital reserve$60,0001.4%
    Lender origination fee (1.0% of loan)$22,8500.5%
    USDA guarantee fee (1.0% x 80% x loan)$18,2800.4%
    Capitalized construction interest$88,5442.0%
    Total project cost$4,365,674100.0%

    Three lines carry program meaning. The guarantee fee is loan times guarantee percentage times fee rate [1]; for fiscal year 2026 REAP loans the rate is 1.0% with an 80% guarantee, plus 0.50% if the guarantee issues before construction is complete [19]. The model assumes issuance at completion, so the lender carries 2027 construction risk itself. The feasibility study is a loan-eligible cost [1] but an unallowable grant cost [2]. And the $80,000 of utility-owned upgrades counts in total project cost, but the grant treats equipment the recipient does not wholly own as unallowable [2].

    SourceAmountShare
    REAP guaranteed loan (80% guarantee)$2,285,00052.3%
    Owner equity (cash)$2,080,67447.7%
    Total$4,365,674100.0%

    The guaranteed portion is $1,828,000 and the lender's unguaranteed exposure is $457,000. The REAP grant is left out of sources: it cannot be sought until 12 to 24 months after completion [2], it is competitive and subject to funds [2], and the funding notice for fiscal years 2025 to 2027 was rescinded in April 2026 [20]. Equity of 47.7% is well above the 25% matching funds REAP requires [1].

    Revenue build and operating expenses

    Assumptions

    AssumptionValueOne-line rationale
    Co-digestion tonnage9,125 tons per year18% of input mass, within one complete-mix vessel's range
    Net tipping fee$15 per ton, +2.0% per yearNo published Lancaster price; the stress tests use $0 and $30
    Co-digestion energy139.2 kWh per tonLifts output to 6.5 kWh per cow per day, inside the AgSTAR range [3]
    Performance factor75% / 88% / 90%Covers engine availability, biological upsets and feedstock gaps
    Parasitic load8% of grossMixers, pumps, separator and blowers
    Farm load1,300,000 kWh per yearAbout 867 kWh per cow; to be replaced with 12 months of bills
    Offset value$0.125/kWh, +1.0% per yearSlightly below PPL generation plus transmission of $0.12746 [5]
    Excess value$0.100/kWh, flat22% discount for semiannual resets and policy risk
    AEC value$15/MWh, less 10% broker feeAbout half the 2024/2025 Tier I average [13]
    Recovered heat$20,000 per year, +2.5%Only heat beyond digester needs displaces fuel
    Bedding solids$35 per cow per year, +2.5%Displaced purchased bedding
    Engine service / overhaul reserve$0.016 / $0.010 per gross kWh, plus $12,000 components reserveReserves deducted before DSCR
    Expense escalation2.5% per yearGeneral cost inflation
    Interest rate7.75% fixedPrime of 7.00% plus 0.75%; 308 bp over the 4.67% 5-year Treasury yield of November 9, 2026 [21]
    Exit capitalization rate15%A 10-year annuity at 8% is 6.71 times one year's cash flow, close to 1 / 0.15

    Ramp and expense structure

    Year 1 revenue is $479,065, Year 2 $564,028 and Year 3 $592,245. The offset line is capped by farm load, so ramp gains land in the lower-valued excess line. A one-cent change in the excess value moves Year 3 revenue by about $16,466; a one-cent change in offset value moves it by $13,000.

    LineYear 3Per cowShare of revenue
    Electricity offset on farm$165,766$11128.0%
    Excess credited at price to compare$164,664$11027.8%
    Tier I AECs (net of broker)$43,239$297.3%
    Recovered heat (displaced fuel)$21,012$143.5%
    Bedding solids (displaced purchases)$55,158$379.3%
    Co-digestion tipping fees$142,405$9524.0%
    Total revenue$592,245$395100.0%
    Engine service and consumables$53,840$369.1%
    Digester and separator labor$36,772$256.2%
    H2S scrubber media and chemicals$15,759$112.7%
    Feedstock testing and WMGM042 sampling$12,607$82.1%
    Pumps, mixers, separator maintenance$26,266$184.4%
    Insurance (property, pollution, business interruption)$33,620$225.7%
    Utility customer, standby and metering charges$8,405$61.4%
    Monitoring, SCADA, biology service$10,506$71.8%
    Administration, AEC registration, USDA reporting$9,456$61.6%
    Property tax and other$5,253$40.9%
    Guarantee retention fee (passed through)$4,398$30.7%
    Operating expenses$216,883$14536.6%
    Net operating income$375,36263.4%
    Replacement reserves (engine overhaul, components)$46,258$317.8%
    Cash flow available for debt service$329,10455.6%

    Operating expenses take 36.6% of revenue and reserves 7.8%, leaving a 55.6% cash margin. Per gross kilowatt-hour, the plant earns $0.185 and spends $0.068 on operations and $0.014 on reserves. The retention fee is 0.25% a year on the guaranteed outstanding balance [19]; lenders may pass it through [1], so it is treated as an operating cost.

    Two choices matter more than their size. Reserves come out before coverage because part 5001 defines DSCR as EBITDA less reasonably expected replacement capital expenditures, divided by debt service [1]. An engine running about 6,400 equivalent full-load hours a year will need overhauls within the loan term. And scrubber media ($15,759) protects the engine: sulfur that gets through corrodes heads and degrades oil, which is why the stress tests treat a scrubber failure as a severe case. The pro forma is pre-tax on the assumption that the dairy owns the plant through a pass-through entity. Tax credits are excluded (see Program compliance).

    10-year pro forma

    YearRevenueOperating expensesNOIReservesCFADSDebt serviceCash flow after debt serviceDSCR
    1$479,065$198,275$280,790$38,691$242,100$177,088$65,0121.37x
    2$564,028$210,705$353,323$44,400$308,923$262,894$46,0281.18x
    3$592,245$216,883$375,362$46,258$329,104$262,894$66,2091.25x
    4$598,655$222,010$376,644$47,414$329,230$262,894$66,3361.25x
    5$605,186$227,256$377,930$48,600$329,330$262,894$66,4361.25x
    6$611,841$232,622$379,218$49,814$329,404$262,894$66,5091.25x
    7$618,622$238,112$380,510$51,060$329,450$262,894$66,5561.25x
    8$625,531$243,726$381,805$52,336$329,469$262,894$66,5751.25x
    9$632,573$249,468$383,105$53,645$329,460$262,894$66,5661.25x
    10$639,748$255,339$384,409$54,986$329,424$262,894$66,5291.25x

    Ten-year revenue totals $5,967,492 and cash flow after debt service $642,757. Every row ties: revenue less expenses is NOI, NOI less reserves is CFADS, CFADS less debt service is cash flow. Coverage stays flat because expenses escalate at 2.5% while the main revenue lines grow 0% to 2%. The project never grows out of its debt, so any cushion has to come from structure.

    Debt structure

    TermModelled valueProgram basis
    InstrumentREAP guaranteed loan from an eligible lender7 CFR 5001 [1]; USDA's tool for up-front costs [2]
    Amount$2,285,000, sized to 1.25x on Year 3 CFADSMaximum 75% of eligible costs and $25 million per borrower [1]
    Guarantee80%: $1,828,000 guaranteed, $457,000 unguaranteedFY2026 REAP percentage [19]; regulatory maximum 90% [1]
    FeesGuarantee fee 1.0% of guaranteed amount ($18,280); retention 0.25% a year; origination 1.0% ($22,850)[1], [19]
    Interest rate7.75% fixed (assumption)Negotiated; fixed or variable; variable rates adjusted no more often than quarterly [1]
    Term16 years: 12 months interest-only, then 15-year amortizationUseful life limit, 40-year maximum, no balloon, first full payment within 3 years [1]
    Payments$177,088 interest in Year 1; $262,894 level from Year 2Balance $2,106,736 after Year 3; $1,224,602 after Year 10
    Borrower contribution$2,080,674 cash (47.7%)Minimum 25% [1]
    CollateralLien on digester and gas equipment; assignment of interconnection and feedstock agreements; blanket lien on dairy real estate (lender policy)All collateral secures the entire loan; no separate collateral for the unguaranteed portion [1]
    GuarantiesDairy operating entity and its owners (lender policy)[1]

    Why $2.285 million and not $3.3 million. At the program ceiling, a $3,275,000 loan (74.1% of the $4,421,856 cost after fees and interest scale up) would carry $376,796 of debt service against $329,104 of CFADS: 0.87x. At 65% of cost ($2,840,000), coverage is 1.00x. The 1.25x sizing target is this model study's lender-policy assumption; part 5001 sets no REAP-specific coverage minimum and relies on the lender's credit evaluation [1].

    Equity and the grant. If the grant is won, combined REAP funding would be $2,785,000, or 63.8% of cost, inside the 75% combined limit [2]. Equity net of the grant would be $1,580,674 (36.2%). A loan at the 75% ceiling would have made any grant application ineligible, because combined REAP funding would exceed 75% [2]. Sizing to cash flow keeps the grant option open.

    Rate basis. Prime was 7.00%, the effective federal funds rate 3.88%, and the 5-year and 10-year Treasury yields 4.67% and 4.88% on November 9, 2026 [21]. The stress tests run from 6.75% to 9.75%.

    DSCR and break-even

    MeasureValueWhat it tells a lender
    DSCR, Year 1 (interest-only, 75% performance)1.37xInterest-only covers the ramp
    DSCR, Year 2 (first amortizing year)1.18xTightest year
    DSCR, Years 3 to 101.25xSized coverage, no growth cushion
    Debt yield, Year 314.4%CFADS divided by loan
    Cash cushion, Year 3$66,209 (11.2% of revenue)Revenue can fall 11.2% before 1.00x
    Performance factor at 1.00x / 1.25x68.1% / 89.8%Base 90%
    Output at 1.00x4.78 kWh per cow per dayAbove the 4.18 manure-only median [3]
    Electricity value at 1.00x20.0% below base ($0.1020 offset, $0.0800 excess)Excess already discounted 22%
    Tipping fee at 1.00x$8.03 per tonBase $15
    Loan at the 75% ceiling / at 65%0.87x / 1.00xProgram maximum is not bankable

    The break-evens say the credit depends on co-digestion. Output break-even exceeds the manure-only median, and the residuals must pay at least $8.03 a ton. The 68.1% performance break-even gives the biology some room, but the stress tests show a single bad event can use it up. A $131,447 liquidity covenant, six months of amortizing debt service, would cover the Year 2 gap to 1.25x and the three-month outage case. It is modelled as a covenant on the dairy's cash, not a funded project reserve.

    Returns

    MeasureBase (no grant)Upside (grant applied to principal in Year 3)
    Unlevered cost basis (hard, contingency, soft)$4,236,000$4,236,000
    Equity invested at closing$2,080,674$2,080,674
    Exit value, end of Year 10 (Year 11 CFADS $329,359 at 15%)$2,195,725$2,195,725
    Loan balance at exit$1,224,602$946,181
    Net exit proceeds to equity$971,123$1,249,544
    Unlevered IRR, 10 years with exit3.46%3.46%
    Levered IRR, 10 years with exit-2.99%1.69%
    Equity multiple, 10 years0.78x1.14x
    Unlevered IRR / levered IRR, 20-year life, no residual4.44% / 0.87%4.44% / 3.54%
    Equity multiple, 20-year life1.13x1.54x
    Unlevered simple payback13.1 years13.1 years
    Levered payback of equity19.2 years16.6 years
    DSCR, Year 31.25x1.63x

    Unlevered flows exclude financing fees and the retention fee; Year 10 includes the exit value. Levered flows are cash after debt service, with Year 10 adding $971,123 of net exit proceeds.

    As a credit, the plant covers its debt. As an investment, it barely returns its capital: 3.5% to 4.4% unlevered, and negative over 10 years levered without the grant. The 7.75% loan costs more than the project earns, so debt lowers the owner's return. Even the $500,000 grant, 11.5% of cost, only lifts the 20-year levered return to 3.5%.

    That matters to the lender. An owner earning a sub-market return on a plant that needs daily attention has weak economic reasons to keep it running through a bad year, and the AgSTAR shutdown record reflects that incentive [3]. Dairies also value odor control, nutrient handling and manure storage capacity, which this pro forma does not count. Those motives help explain why an owner keeps operating, but a lender should not lend against them. Hence the dairy guaranty in the conditions below.

    The 15% exit rate prices remaining life rather than a trading market. At Year 10 the vessel has about a decade left; ten years of cash flow at 8% is 6.71 times one year, close to the 6.67 implied by 15%. For an owner who runs the plant to the end, the 20-year figures are the better guide.

    Sensitivity and stress tests

    Grid 1. Year 3 DSCR by electricity value and performance factor

    Electricity value vs basePerf 70%Perf 80%Perf 90%Perf 95%
    -20%0.82x0.91x1.00x1.04x
    -10%0.92x1.02x1.13x1.17x
    +0%1.02x1.14x1.25x1.30x
    +10%1.12x1.25x1.38x1.44x

    Grid 2. Year 3 DSCR by interest rate and performance factor

    Interest ratePerf 70%Perf 80%Perf 90%Perf 95%
    6.75%1.09x1.21x1.33x1.39x
    7.75%1.02x1.14x1.25x1.30x
    8.75%0.96x1.07x1.18x1.23x
    9.75%0.91x1.01x1.11x1.16x

    Grid 3. Year 3 DSCR by tipping fee and co-digestion tonnage (energy scales with tons)

    Net tipping fee4,563 tons9,125 tons13,688 tons
    $0 per ton0.54x0.71x0.88x
    $15 per ton0.81x1.25x1.69x
    $30 per ton1.08x1.79x2.51x

    Electricity value and performance each move coverage about 0.11x to 0.13x per 10 points. A one-point rate change moves it about 0.07x, and fixing the rate at closing removes that risk. Co-digestion outweighs both: half the tonnage at the base fee gives 0.81x, and full tonnage with no fee gives 0.71x.

    Downside scenarioDesignDSCREffect
    S1 Engine downtimeThree-month generator outage in Year 4; gas flared1.00x (Year 4)Uses the full cushion; liquidity covenant carries it
    S2 Hydrogen sulfide eventScrubber failure in Year 5: six-week outage plus $120,000 engine rebuild0.68x (Year 5)Outage alone gives 1.14x; the rebuild breaks coverage
    S3 Loss of co-digestionResiduals end from Year 3; output falls to 4.18 kWh per cow per day; no fees0.37x (Year 3), 0.31x by Year 1010-year cash after debt service of -$1,271,537
    S4 Net metering resetExcess repriced to $0.050/kWh0.94x (Year 3); 0.87x (Year 2)A net billing change puts the loan below 1.0x
    S5 Weak biologyStabilized performance 75%1.08x (Year 3); 1.01x (Year 2)Covers debt with almost no cushion
    S6 Combined moderate stressPerformance 80%, electricity -10%, fee $7.500.75x (Year 3); 0.71x (Year 2)Three plausible shortfalls at once
    S7 RateFixed rate 100 bp higher at closing1.18x (Year 3)Manageable if fixed before closing

    The H2S case shows the danger is the repair bill, not lost output: the outage alone leaves 1.14x, but adding a $120,000 rebuild in the same year drops it to 0.68x. Gas conditioning, continuous H2S monitoring and an engine service contract with fixed overhaul pricing are credit protections. The co-digestion case shows the plant has no stand-alone fallback. Without residuals it earns about $97,000 against $262,894 of debt service, and the gap has to come from milk income.

    Program compliance

    RequirementRuleModelled status
    Grant timingProject completed 12 to 24 months before application (12 to 36 in the first window); 12 months of actual production data [2]Application in 2029 on 2028 data
    Grant size and cost shareRES maximum ,000; Cost Sharing at least 75% [2],000 = 11.5% of cost
    Combined REAP limitA project is ineligible if REAP grant and guaranteed loan funding together exceed 75% of Project Cost [2]63.8%
    ApplicantAgricultural Producer, with the majority owner earning at least 50% of income from the agricultural operation [2]To verify
    Financial capabilityCurrent ratio of at least 1:1 on the most recent fiscal year balance sheet [2]Dairy statements to be tested
    Rural locationOutside cities over 50,000 and their contiguous urbanized areas [2]Screening needed near Lancaster city [9]
    Technical sustainabilityResource Assessment or Feasibility Study [2]Feasibility study, not grant-funded [2]
    OwnershipApplicant must own the RES and own or control the site [2]Dairy entity owns the plant
    Installer documentationInstaller license, similar systems installed and provider selection described [2]Followed from day one
    Simple paybackCalculated under the rule's Simple Payback definition [2]9.7 years with AECs; 10.7 without (modelled)
    Loan borrower and projectAgricultural producer or rural small business; commercially available technology [1]Complete-mix design common in PA [3]
    Loan technical report and feasibilityAppendix E technical report for RES projects of ,000 or more; feasibility study when the Agency requires [1]Budgeted
    Loan amount, fees, term75% maximum; 25% matching funds; FY2026 1.0% fee, 0.25% retention, 80% guarantee; useful life, no balloon [1], [19]52.3%, 16 years
    Waste permitWMGM042 registration [10]Closing condition
    Net meteringUp to 3,000 kW on PPL's GS-3 rider [4]499 kWe

    Estimated grant score. Merit scoring has 90 points plus up to 10 priority points [2]. The modelled project would earn 5 points if the dairy employs at least three people other than its owners (assumed), and the full 25 points for energy per award dollar: about 21,856 BTU per grant dollar (computed from gross generation), against a scale of one point per 100 BTU capped at 25 [2]. It would get zero on the 20-point percent-replaced criterion, because projects replacing 109.5% or more of prior use score nothing and this plant produces about 227% of load [2]. Further points depend on criteria this model study did not score. Selection takes the top two applications in each State that meet the minimum score and then funds the rest in rank order until funds run out [2], so the grant stays uncertain.

    Tax credits. None are valued. Section 45Z covers clean transportation fuel sold from January 1, 2025 through December 31, 2029 [16], so it applies only to RNG. Whether a power-producing manure digester can claim an electricity credit under current Treasury rules is not addressed here.

    What changed in 2025 and 2026. USDA rescinded the REAP funding notice for fiscal years 2025 to 2027 in April 2026 and required applicants without an executed agreement to submit new applications under the new rule [20]. The October 2026 rule moved grants post-completion, set the RES maximum at ,000 with 75% Cost Sharing, folded the former technical merit appendices into the application requirements, and replaced State-level competitions with national selection [2]. The 2026 RFS rule removed eRINs [14]. Each change pushes construction onto the guaranteed loan and equity, with the grant a possible later prepayment.

    Risks and mitigants

    RiskHow it hurts the loanMitigant a lender would set
    Co-digestion supply or fees fall0.37x without residuals (S3); break-even fee $8.03Five-year supply contracts for at least 9,125 tons with minimum fees; two or more suppliers; cash sweep below 80% of tons
    Herd reduction or dairy exitLost base feedstock [3]Dairy guaranty; cross-default with operating credit; herd covenant
    Engine downtime1.00x in a three-month outage (S1)Uptime-guaranteed service contract; spares; $131,447 liquidity covenant
    Hydrogen sulfide damage0.68x with rebuild (S2)Biological scrubber plus carbon polish; continuous monitoring; overhaul reserve; business interruption cover
    Weak biology1.08x at 75% performance (S5)Lab gas-yield tests before closing; biology service; interest-only Year 1
    Net metering or price changes0.94x with excess at $0.050 (S4); generation charge resets every six months [5]Excess already discounted 22%; net billing case in the lender's analysis
    Grant timing or eligibilityGrant arrives late or not at all [2], [20]Excluded from sizing; REAP application requirements followed during construction
    Cost overrunBudget is an assumptionFixed-price contract, 8% contingency, independent engineer
    Permit or neighbor conflict300-foot setback; digestate limits [10]Site outside setbacks; WMGM042 a closing condition
    Abandonment on thin returnsFive-year median life of closed projects [3]Guaranties; production reporting; covenant to operate or flare
    Special-purpose collateralLittle resale valueBlanket lien on dairy real estate
    Interest rate1.18x at +100 bp (S7)Fix at closing

    Model determination

    Determination: financeable as structured, with conditions, at about half of cost. Not financeable at the REAP loan ceiling, and not a stand-alone project credit.

    The modelled digester supports a $2,285,000 REAP guaranteed loan at 1.25x from Year 3, because the loan is sized to cash flow (52.3% of $4,365,674), the owner invests $2,080,674, and residuals pay the farm to take them. At the 75% ceiling coverage would be 0.87x, without co-digestion 0.37x, and in a single bad engine year 0.68x. The real repayment source is therefore the dairy, with the digester's cash flow as the main but not only support. Part 5001 requires a global credit evaluation where affiliated entities are involved [1], and the file should say so plainly. The owner's economics are thin, so the structure must make continued operation the owner's best choice even in a bad year.

    The conditions a lender would likely set:

    1. Five-year residual supply agreements for at least 9,125 tons per year at a net fee of at least $15 per ton, from at least two suppliers, with lab-tested yields supporting 139 kWh per ton.
    2. A fixed-price EPC contract with a performance guaranty, an independent engineer's review, a technical report under 7 CFR 5001 appendix E [1] and an independent feasibility study.
    3. A PPL interconnection agreement and written confirmation of net metering treatment for output near 227% of farm load.
    4. WMGM042 registration [10], an amended nutrient management plan, and air and zoning approvals before the first draw.
    5. A long-term engine service contract with set overhaul pricing and a reserve funded at $0.010 per kWh.
    6. Guaranties from the dairy entity and its owners, cross-default with dairy loans, and a blanket lien on dairy real estate.
    7. A $131,447 liquidity covenant, a 1.20x global coverage test and a cash sweep below 1.10x digester coverage.
    8. A fixed rate at closing.
    9. Any REAP grant applied to principal, with REAP application and Project Period requirements followed during construction.
    10. Annual performance reporting to the lender, plus monthly production reports.

    With these conditions the loan is a reasonable guaranteed credit: 80% is guaranteed, and the $457,000 unguaranteed portion is backed by a working dairy and its land. Without them, and especially without the residual contracts and the dairy guaranty, this model study does not support the loan.

    Frequently Asked Questions

    Can a REAP grant pay for building a digester in 2027?
    No. Under the rule effective October 16, 2026, the project must already be complete and operating, and the owner applies 12 to 24 months after the Project Period ends, with 12 months of actual production data. The grant reimburses a finished project. Construction must be funded by equity and loans, and USDA points applicants to the REAP guaranteed loan under 7 CFR part 5001 for up-front costs.
    How large can the REAP grant be for this project?
    The maximum request for a renewable energy system is $500,000, and the owner must cover at least 75% of project cost from other sources. For the modelled $4,365,674 project, the cap is $500,000, or 11.5% of cost. Combined REAP grant and guaranteed loan funding cannot exceed 75% of project cost. The modelled structure would reach 63.8% with the grant, which leaves room inside the limit.
    Why is the modelled loan only about half of the project cost?
    Because coverage decides the size, not the program ceiling. REAP allows a guaranteed loan up to 75% of eligible costs, but at that level this digester covers debt service only 0.87 times. Sizing to 1.25x on the first stabilized year gives a $2,285,000 loan, or 52.3% of cost. The owner contributes the other 47.7%, well above the 25% minimum.
    Does the digester still need a technical report?
    Yes, for the loan. The October 2026 grant rule folded the former technical merit appendices of 7 CFR 4280 subpart B into its application requirements, which call for a Resource Assessment or Feasibility Study. The guaranteed loan still requires a technical report under 7 CFR 5001, following appendix E for renewable energy projects of $200,000 or more. For a digester, that report must give gas production estimates from tabular values or laboratory biodegradability analysis.
    How does net metering value the electricity in this model?
    Under PPL's net metering rider, output is credited at the full retail rate up to the electricity PPL delivers to the farm, and excess carries forward. Kilowatt-hours left at the end of the PJM planning year on May 31 are paid at the rate schedule's price to compare. Systems on non-residential schedules qualify up to 3,000 kW. The model discounts excess power to $0.100 per kWh because PPL's generation charge resets twice a year.
    Can a power-producing digester earn RINs?
    Not under current rules. EPA's 2026 and 2027 Renewable Fuel Standard rule, effective June 15, 2026, removed renewable electricity as a qualifying renewable fuel. RINs remain available for biogas upgraded to renewable natural gas and used as transportation fuel. That is why the RNG pathway has more environmental revenue, but it also requires added upgrading and pipeline capital and carries merchant RIN price risk.
    What is the biggest risk to the loan?
    Losing the co-digestion residuals. Six of seven operating Lancaster County digesters in EPA's database take food wastes. In the model, residuals supply roughly a third of the energy and a quarter of revenue. Without them, coverage falls to 0.37x and the dairy must service the debt. Multi-year supply contracts with minimum tonnage and fees are the first closing condition.
    How long do farm digesters usually operate?
    EPA's AgSTAR database lists 98 shut-down livestock digesters nationally. Among the 87 with both an opening and a closing year, the median operating life was five years, and operating cost appears among the recorded reasons. Pennsylvania lists three shutdowns against 30 operating projects. A lender should structure the loan so continued operation stays the owner's best option, using guaranties and reserves.

    Sources

    1. 1.U.S. Government Publishing Office, GovInfo. Code of Federal Regulations, Title 7, Part 5001, OneRD Guarantee Loan Program (revised as of January 1, 2026). https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml (accessed 2026-11-11)
    2. 2.USDA Rural Business-Cooperative Service. "Unleashing American Energy and Economic Prosperity; Rural Energy for America Program (REAP)," final rule, 91 FR 62600 (October 1, 2026; effective October 16, 2026), GovInfo. https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm (accessed 2026-11-11)
    3. 3.U.S. Environmental Protection Agency, AgSTAR. Livestock Anaerobic Digester Database, Excel file (data available through June 2024). https://www.epa.gov/sites/default/files/2020-10/agstar-livestock-ad-database.xlsx (accessed 2026-11-11)
    4. 4.PPL Electric Utilities. Tariff Electric Pa. P.U.C. No. 201, Rider "Net Metering for Renewable Customer-Generators" (Supplement No. 334). https://www.pplelectric.com/-/media/PPLElectric/At-Your-Service/Docs/Current-Electric-Tariff/net-metering-renewable.pdf (accessed 2026-11-11)
    5. 5.PPL Electric Utilities. "Business Account Price Sheet," July 2026. https://www.pplelectric.com/-/media/PPLElectric/At-Your-Service/Docs/Business-Customers/PPL-EU-Business-Account-Price-Sheet07012026.pdf (accessed 2026-11-11)
    6. 6.U.S. Census Bureau. "County Population Totals: April 1, 2020 to July 1, 2025" (Vintage 2025, co-est2025-alldata.csv). https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/counties/totals/co-est2025-alldata.csv (accessed 2026-11-11)
    7. 7.U.S. Census Bureau. "Small Area Income and Poverty Estimates: 2024, Pennsylvania counties" (est24-pa.txt). https://www2.census.gov/programs-surveys/saipe/datasets/2024/2024-state-and-county/est24-pa.txt (accessed 2026-11-11)
    8. 8.U.S. Census Bureau. "County Business Patterns 2023," county file (cbp23co.zip). https://www2.census.gov/programs-surveys/cbp/datasets/2023/cbp23co.zip (accessed 2026-11-11)
    9. 9.U.S. Census Bureau. "Subcounty Resident Population Estimates: April 1, 2020 to July 1, 2025, Pennsylvania" (Vintage 2025, sub-est2025_42.csv). https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/cities/totals/sub-est2025_42.csv (accessed 2026-11-11)
    10. 10.Pennsylvania Department of Environmental Protection. General Permit WMGM042, Anaerobic Digestion (issued August 18, 2022; expires August 18, 2032). https://crawler.dep.state.pa.us/Waste/Bureau%20of%20Waste%20Management/WasteMgtPortalFiles/SolidWaste/Municipal_Waste/GP/WMGM042-Final-20220818.pdf (accessed 2026-11-11)
    11. 11.Pennsylvania Department of Labor & Industry, Center for Workforce Information & Analysis. "Top 50 Employers," Lancaster County, 4th Quarter 2023. https://www.pa.gov/content/dam/copapwp-pagov/en/dli/documents/workstats/top-50/Lancaster_County_Top_50.pdf (accessed 2026-11-11)
    12. 12.U.S. Environmental Protection Agency, AgSTAR. "Livestock Anaerobic Digester Database" (page last updated July 10, 2026). https://www.epa.gov/agstar/livestock-anaerobic-digester-database (accessed 2026-11-11)
    13. 13.Pennsylvania Public Utility Commission. "Alternative Energy Credit Pricing" (updated September 16, 2025). https://www.puc.pa.gov/media/3635/alternative_energy_credit_pricing_091625.pdf (accessed 2026-11-11)
    14. 14.U.S. Environmental Protection Agency. "Renewable Fuel Standard (RFS) Program: Standards for 2026 and 2027, Partial Waiver of 2025 Cellulosic Biofuel Volume Requirement, and Other Changes," final rule, 91 FR 16388 (April 1, 2026), GovInfo. https://www.govinfo.gov/content/pkg/FR-2026-04-01/html/2026-06275.htm (accessed 2026-11-11)
    15. 15.U.S. Environmental Protection Agency. "Cellulosic Waiver Credit Price Calculation for 2025," EPA-420-B-26-011 (March 2026). https://www.epa.gov/system/files/documents/2026-03/420b26011.pdf (accessed 2026-11-11)
    16. 16.Internal Revenue Service. "Clean Fuel Production Credit." https://www.irs.gov/credits-deductions/clean-fuel-production-credit (accessed 2026-11-11)
    17. 17.U.S. Energy Information Administration. "Henry Hub Natural Gas Spot Price," monthly (release of November 4, 2026). https://www.eia.gov/dnav/ng/hist/rngwhhdm.htm (accessed 2026-11-11)
    18. 18.U.S. Environmental Protection Agency. "RIN Trades and Price Information." https://www.epa.gov/fuels-registration-reporting-and-compliance-help/rin-trades-and-price-information (accessed 2026-11-11)
    19. 19.USDA Rural Development. "OneRD Annual Notice of Guarantee Fee Rates, Periodic Retention Fee Rates, Loan Guarantee Percentage and Fee for Issuance of the Loan Note Guarantee Prior to Construction Completion for Fiscal Year 2026," 91 FR 11272 (March 9, 2026), GovInfo. https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm (accessed 2026-11-11)
    20. 20.USDA Rural Business-Cooperative Service. "Notice of Rescission of Funding Opportunity for the Rural Energy for America Program," 91 FR 20090 (April 15, 2026), GovInfo. https://www.govinfo.gov/content/pkg/FR-2026-04-15/html/2026-07332.htm (accessed 2026-11-11)
    21. 21.Board of Governors of the Federal Reserve System. "H.15 Selected Interest Rates (Daily)," release of November 10, 2026. https://www.federalreserve.gov/releases/h15/ (accessed 2026-11-11)